 "as_of": "2026-09-24",
 "_note": "Real AI/hyperscale data-center campuses compiled from operator releases, utility filings and trade press (Sep 2026). Rows marked verified passed an independent adversarial check of existence/location and capacity/status; the rest are single-pass press-sourced and carry a REPORTED mark. Announced capacity is drawn hollow — it is not power.",
 "verification_note": "155 of 182 rows passed an independent check of existence, location and capacity; the rest are press-sourced and carry a REPORTED mark. Rows added in the 24 Sep 2026 date check are single-pass.",
 "counts": {
  "campuses": 182,
  "verified": 155,
  "gw_planned": 134.0,
  "gw_operational": 7.0,
  "countries": 30
 },
 "aggregates": [
  {
   "name": "Northern Virginia market total (Loudoun/Prince William/Fairfax core; Fauquier/Culpeper/Stafford/Spotsylvania emerging)",
   "operator": "Market total (multiple operators)",
   "tenant": "",
   "city": "Ashburn",
   "region": "Virginia",
   "country": "USA",
   "lat": 39.0437,
   "lng": -77.4875,
   "coord_precision": "town",
   "mw_planned": 9450,
   "mw_operational": 5050,
   "status": "operating",
   "timeline": "JLARC (Dec 2024): 5,050 MW in use statewide (based on Aug 2023 peak-load forecasts by Dominion and co-ops), plus 1,500 MW under construction and 2,900 MW in earlier development (Cushman & Wakefield 2024). DC Byte via DCD (Oct 2025): Loudoun alone 10 GW operational+planned (28% operational); Virginia ~40 GW operational+planned.",
   "capex_usd_b": null,
   "power_notes": "Dominion Energy Virginia (PJM); Dominion plans ~$50B capex 2025-2029 largely for data-center load and new 500 kV transmission (per search summary; not independently fetched). NOVEC/REC co-ops serve parts of Loudoun/Prince William.",
   "chips_notes": "",
   "notes": "mw_operational is the JLARC statewide figure (Virginia is ~overwhelmingly NoVA); mw_planned = 5,050 + 1,500 UC + 2,900 pipeline per JLARC. Tier-3 aggregator dcmap.us (Aug 2026) tracks 9.4 GW operational, 4.8 GW under construction, 6.5 GW planned across 381 NoVA sites — included only as corroboration, not as the sourced number. CBRE H1 2023 colocation inventory was 2,254 MW (colo only, vacancy 0.94%); CBRE H1 2025 colo vacancy 0.72%.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://jlarc.virginia.gov/pdfs/reports/Rpt598-2.pdf",
     "title": "JLARC Report 598: Data Centers in Virginia 2024",
     "date": "2024-12-09",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/loudoun-county-data-center-market-share-drops-as-new-virginia-jurisdictions-rise/",
     "title": "Loudoun County data center market share drops as new Virginia jurisdictions rise (DC Byte data)",
     "date": "2025-10-23",
     "tier": 2
    },
    {
     "url": "https://www.cbre.com/insights/local-response/north-america-data-center-trends-h1-2025-market-profiles-northern-virginia",
     "title": "CBRE North America Data Center Trends H1 2025 – Northern Virginia",
     "date": "2025-09-08",
     "tier": 1
    },
    {
     "url": "https://dcmap.us/markets/northern-virginia/",
     "title": "dcmap.us Northern Virginia market page (aggregator)",
     "date": "2026-08",
     "tier": 3
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://jlarc.virginia.gov/pdfs/reports/Rpt598-2.pdf",
     "note": "Numbers are sourced but stale and mislabeled in scope. JLARC Rpt 598 (tier 1, Dec 2024) text confirms 'Virginia data center sites use approximately 5,050 megawatts' based on Aug 2023 peak-load forecasts, and C&W 2024 figures of 1,500 MW under construction + 2,900 MW earlier development (statewide, n"
    }
   ],
   "verified": true
  }
 ],
 "rows": [
  {
   "name": "Fermi America Project Matador (HyperGrid)",
   "operator": "Fermi America",
   "tenant": "TensorWave (222MW lease, up to 650MW)",
   "city": "Carson County (NE of Amarillo, adjacent to Pantex)",
   "region": "Texas",
   "country": "USA",
   "lat": 35.32,
   "lng": -101.56,
   "coord_precision": "town",
   "mw_planned": 11000,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Announced 2025 as up to 11GW; Mar 14 2026 upsized private-power projection to 17GW; first Siemens SGT-800 turbines delivered Jul 2026; Aug 10 2026 $6.5B 15-yr TensorWave lease for 222MW, delivery in phases from H2 2027. Original 1GW-by-end-2026 target missed.",
   "capex_usd_b": null,
   "power_notes": "Behind-the-meter: ~6GW gas permitted (Hillcore to build 2.6GW plant), four AP1000 reactors filed with NRC, solar, batteries, grid ties. On Texas Tech University System land.",
   "chips_notes": "TensorWave (AMD-focused AI cloud) is first binding tenant; no GPU count disclosed.",
   "notes": "mw_planned = original 11GW campus figure; 17GW is power generation, not IT. >$1.5B invested to date; lost prior unnamed tenant Dec 2025, class action Jan 2026, liquidity warnings Mar 2026 (Cleanview, tier 3, citing SEC filings).",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://abc7amarillo.com/news/local/fermi-america-signs-six-point-five-billion-dollar-lease-for-worlds-largest-data-center-after-months-of-turmoil-tensorwave-amarillo-texas-carson-county-water-city-council-greg-abbott-audir",
     "title": "Fermi signs $6.5 billion lease for 'world's largest data center' (ABC7 Amarillo)",
     "date": "2026-08-10",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/fermi-signs-agreement-with-tensorwave-for-up-to-650mw-of-data-center-capacity-at-project-matador-site/",
     "title": "Fermi signs agreement with TensorWave for up to 650MW at Project Matador",
     "date": "2026-08",
     "tier": 2
    },
    {
     "url": "https://www.fermiamerica.com/news",
     "title": "Fermi America newsroom (17GW upsizing Mar 14 2026; Siemens turbines Jul 21 2026)",
     "date": "2026-08",
     "tier": 1
    },
    {
     "url": "https://cleanview.co/reports/fermi",
     "title": "The World's Largest Data Center Is Running Into Trouble (Cleanview)",
     "date": "2026-04",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/fermi-signs-agreement-with-tensorwave-for-up-to-650mw-of-data-center-capacity-at-project-matador-site/",
     "note": "TensorWave lease, Carson County/Pantex-adjacent location, and active under-construction status ($1.5B+ invested, turbines installed as of Aug 2026) are confirmed; Fermi's own Mar 2026 release upsizing to 17GW refers to private power generat"
    }
   ],
   "verified": true
  },
  {
   "name": "SB Energy (SoftBank) Portsmouth AI Campus",
   "operator": "SB Energy (SoftBank Group)",
   "tenant": "OpenAI (reported in lease discussions, unconfirmed)",
   "city": "Piketon (former DOE Portsmouth Gaseous Diffusion Plant)",
   "region": "Ohio",
   "country": "USA",
   "lat": 39.0684,
   "lng": -83.0135,
   "coord_precision": "site",
   "mw_planned": 10000,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Public-private deal (DOE, Dept. of Commerce, SB Energy, AEP Ohio) announced ~Mar 20, 2026 with groundbreaking; initial ~800MW interconnection phase targeting 2028 operational; full 10GW envisioned into the early 2030s",
   "capex_usd_b": 40,
   "power_notes": "SB Energy to build up to 10GW of new generation (9.2GW natural gas) plus $4.2B in new AEP Ohio transmission (new 765kV lines, four substations); data-center capex estimated $30-40B; separate ~$33.3B in Japanese-backed financing reported for the gas-generation component",
   "chips_notes": null,
   "notes": "Located on federal land at the legacy Portsmouth uranium-enrichment site in Pike County, Ohio (DOE is site lessor). Distinct from SoftBank's existing Stargate Lordstown, OH site (already tracked). One of the largest single data-center power buildouts announced to date.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterfrontier.com/machine-learning/article/55366132/softbanks-10-gw-ohio-campus-marks-a-turning-point-for-ai-infrastructure",
     "title": "SoftBank's 10 GW Ohio Campus Marks a Turning Point for AI Infrastructure",
     "date": "2026-03-31",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/softbank-eyes-10gw-data-center-at-former-doe-nuclear-enrichment-site-in-ohio/",
     "title": "SoftBank eyes 10GW data center at former DOE nuclear enrichment site in Ohio",
     "date": "2026-03",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Wonder Valley AI data centre park (Greenview Industrial Gateway)",
   "operator": "O'Leary Ventures / O'Leary Digital (with MD of Greenview)",
   "tenant": "None announced",
   "city": "Greenview (≈40 km S of Grande Prairie)",
   "region": "Alberta",
   "country": "Canada",
   "lat": 54.8,
   "lng": -118.75,
   "coord_precision": "town",
   "mw_planned": 9000,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Announced Dec 2024 (7.5 GW, C$70B); raised to 9 GW Apr 2026; original plan: construction 2026, phase 1 (1.4 GW) 2027; now construction 'possibly late 2028'; land purchase not finalized; First Nation judicial review of water permits proceeds Dec 2026",
   "capex_usd_b": null,
   "power_notes": "On-site gas-fired generation (Montney gas), 'North America's largest gas plant', plus geothermal; water licence 6M m3/yr (needs 24M); AUC approvals not yet applied",
   "chips_notes": "None",
   "notes": "Status set to 'paused' to reflect stalled progress (no permits, no tenant, land unsigned, court setback Aug 13 2026); formally still 'planned' by proponent. Capex C$70B (~US$50B) proponent claim, unverified.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://www.geothermalcanada.org/news/2025/12/17/the-truth-about-wonder-valley",
     "title": "The Logic (republished): The truth about Wonder Valley, Kevin O'Leary's data-centre dream",
     "date": "2025-12-10",
     "tier": 2
    },
    {
     "url": "https://www.theenergymix.com/oleary-loses-first-nation-wins-in-bid-for-judicial-review-of-data-centre-water-permits/",
     "title": "O'Leary loses, First Nation wins in bid for judicial review of data centre water permits (9 GW)",
     "date": "2026-08-13",
     "tier": 3
    },
    {
     "url": "https://www.theenergymix.com/earths-largest-ai-data-centre-in-alberta-just-got-bigger/",
     "title": "'Earth's largest' AI data centre in Alberta just got bigger (7.5 -> 9 GW)",
     "date": "2026-04-23",
     "tier": 3
    },
    {
     "url": "https://www.cbc.ca/news/canada/edmonton/wonder-valley-newsletter-open-house-9.7217459",
     "title": "CBC: Updated info about Kevin O'Leary's proposed Wonder Valley AI project (2026 permitting year)",
     "date": "2026",
     "tier": 2
    }
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 1,
     "evidence_url": "https://majorprojects.alberta.ca/details/Wonder-Valley-AI-Data-Centre-Park/11477",
     "note": "Alberta's own Major Projects registry (government filing) classifies Wonder Valley as 'Proposed' (pre-construction), and tier-2 reporting through Aug 2026 confirms no land purchase finalized and no construction ever begun, so 'paused' overs"
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Hyperion",
   "operator": "Meta (via Beignet Investors JV with Blue Owl Capital, 80/20)",
   "tenant": "Meta",
   "city": "Holly Ridge (Richland Parish)",
   "region": "Louisiana",
   "country": "USA",
   "lat": 32.477149,
   "lng": -91.632333,
   "coord_precision": "site",
   "mw_planned": 5000,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Announced Dec 2024 ($10B, 2 GW); Blue Owl JV Oct 2025 ($27B); expanded to 5 GW / >$50B (CNBC, Jul 2026). Epoch: first phase ~1.7 GW IT operational ~Q1 2028; ~2 GW by 2030; full 5 GW ~2032.",
   "capex_usd_b": 50,
   "power_notes": "Entergy Louisiana: 3 combined-cycle gas plants (~2.26 GW) approved 2025, plus 7 more (5.2 GW) agreed Mar 2026 - 10 plants total; Smalling substation funded by Meta; 20-year agreement. Epoch: power stations in service Dec 2026 (1.8 GW load).",
   "chips_notes": "Epoch projects ~481k Nvidia Rubin GPUs (~4.25M H100e) by Q1 2028.",
   "notes": "2,250 acres; ~4M sq ft across 11 planned buildings; ~3,700 workers on site Feb 2026. Capex >$50B per CNBC (Jul 13, 2026) as cited by Wikipedia; Epoch estimates $63.5B.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://epoch.ai/data/ai-data-centers/directory/meta-hyperion",
     "title": "Epoch AI - Meta Hyperion",
     "date": "2026-09-01",
     "tier": 1
    },
    {
     "url": "https://www.fox8live.com/2026/05/12/metas-27-billion-ai-data-center-is-transforming-rural-louisiana/",
     "title": "Fox 8 - Meta's $27B AI data center is transforming rural Louisiana",
     "date": "2026-05-12",
     "tier": 2
    },
    {
     "url": "https://spectrum.ieee.org/5gw-data-center",
     "title": "IEEE Spectrum - 5GW Data Center Buildout Requires Novel Engineering",
     "date": "2026-03-24",
     "tier": 2
    },
    {
     "url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
     "title": "CNBC - Meta's Louisiana data center investment to reach $50 billion",
     "date": "2026-07-13",
     "tier": 2
    },
    {
     "url": "https://en.wikipedia.org/wiki/Hyperion_Data_Center",
     "title": "Wikipedia - Hyperion Data Center",
     "date": "2026-08-22",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.fox8live.com/2026/05/12/metas-27-billion-ai-data-center-is-transforming-rural-louisiana/",
     "note": "Holly Ridge/Richland Parish location and coordinates match almost exactly, and active construction, the 5GW/$50B+ scale-up, the 80/20 Blue Owl/Meta JV, and 0 MW currently operational are all corroborated as of mid-2026."
    }
   ],
   "verified": true
  },
  {
   "name": "Scala AI City (Eldorado do Sul)",
   "operator": "Scala Data Centers",
   "tenant": "Multi-tenant hyperscale/AI (undisclosed)",
   "city": "Eldorado do Sul",
   "region": "Rio Grande do Sul",
   "country": "Brazil",
   "lat": -30.08,
   "lng": -51.62,
   "coord_precision": "town",
   "mw_planned": 4750,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Announced 2025 (~700 ha); municipal enabling law passed; MME authorised 5 GW grid reservation; phase 1 54 MW (R$3bn) 'about to enter operation' Mar 2026; full 4.75 GW over 10-20 years (~US$50B)",
   "capex_usd_b": 50,
   "power_notes": "5 GW connection authorised by Brazil's Ministry of Mines & Energy to the National Interconnected System; 100% certified renewable claimed; zero-water-exchange cooling",
   "chips_notes": "Designed for 150 kW+ racks with liquid cooling; no GPU counts",
   "notes": "Whether the 54 MW phase 1 was energised by Sep 2026 could not be confirmed from a primary source.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://olhardigital.com.br/2026/03/25/pro/rs-se-prepara-para-ter-verdadeira-cidade-de-data-centers-conheca/",
     "title": "RS se prepara para ter verdadeira 'cidade de data centers' (54 MW phase 1, 4.75 GW, US$50B)",
     "date": "2026-03-25",
     "tier": 3
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/scala-ai-city-scala-pitches-50bn-brazil-data-center-campus-of-up-to-47gw/",
     "title": "Scala AI City: Scala pitches $50bn Brazil data center campus of up to 4.7GW",
     "date": "2025",
     "tier": 2
    },
    {
     "url": "https://datacentremagazine.com/data-centres/scala-data-centers-ai-city-secures-5-gw-approval-in-brazil",
     "title": "Scala secures 5GW authorisation for Scala AI City project",
     "date": "2025",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://olhardigital.com.br/2026/03/25/pro/rs-se-prepara-para-ter-verdadeira-cidade-de-data-centers-conheca/",
     "note": "Eldorado do Sul location/coordinates, 4.75GW total plan, 5GW MME grid authorization, and Phase 1's 54MW 'about to enter operation' (Mar 2026) status are corroborated by Olhar Digital and Data Center Dynamics/Data Centre Magazine reporting."
    }
   ],
   "verified": true
  },
  {
   "name": "Homer City Energy Campus",
   "operator": "Homer City Redevelopment (Knighthead Capital ~75%) with Kiewit",
   "tenant": "",
   "city": "Homer City / Center Township, Indiana County",
   "region": "Pennsylvania",
   "country": "USA",
   "lat": 40.5125,
   "lng": -79.196,
   "coord_precision": "site",
   "mw_planned": 4500,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Announced Apr 2, 2025; PA DEP air permit approved 2025; first steel Apr 1, 2026; GE Vernova turbine deliveries from 2026; first power targeted 2027.",
   "capex_usd_b": 10,
   "power_notes": "On-site 4.5 GW natural-gas plant (seven GE Vernova 7HA.02 hydrogen-enabled turbines) on former 1,884 MW coal site; interconnections to PJM (FirstEnergy Penelec) and NYISO; $5M state grant for gas pipeline interconnect.",
   "chips_notes": "",
   "notes": "mw_planned is on-site GENERATION capacity, not disclosed IT load; data-center IT MW and anchor tenant not disclosed. Capex $10B+ is for power infrastructure and site readiness only; data-center buildings 'billions more'. Sierra Club and others sought DEP reconsideration (Oct 2025).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.gevernova.com/news/press-releases/homer-city-redevelopment-kiewit-announce-country-largest-natural-gas-powered-data-center-support-ai-hpc-demand",
     "title": "Homer City Redevelopment and Kiewit Announce Country's Largest Natural Gas-Powered Data Center Campus (GE Vernova release)",
     "date": "2025-04-02",
     "tier": 1
    },
    {
     "url": "https://www.utilitydive.com/news/homer-city-gas-fired-power-station-data-center-firstenergy/744332/",
     "title": "Largest US gas-fired power plant planned for data centers in Pennsylvania",
     "date": "2025-04-03",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/campaigners-call-on-regulator-to-block-45gw-gas-powered-ai-data-center-in-homer-city-pennsylvania/",
     "title": "Campaigners call on regulator to block 4.5GW gas powered AI data center in Homer City",
     "date": "2025-10-02",
     "tier": 2
    },
    {
     "url": "https://www.fractracker.org/2026/04/homer-city-ai-campus-gas-power-construction/",
     "title": "From Coal Plant to AI Campus: FracTracker Documents Construction (first steel Apr 1, 2026)",
     "date": "2026-04-30",
     "tier": 3
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://www.gevernova.com/news/press-releases/homer-city-redevelopment-kiewit-announce-country-largest-natural-gas-powered-data-center-support-ai-hpc-demand",
     "note": "GE Vernova release (tier 1, Apr 2 2025) confirms 'up to 4.5 GW of energy production' from seven turbines, first deliveries 2026, >3,200 acres; Utility Dive (tier 2, Apr 3 2025) confirms $10B and 2027 first power. CAUTION: 4,500 MW is gas GENERATION capacity, not data-center IT load (no IT MW disclos"
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "OpenAI Project Camellia",
   "operator": "OpenAI",
   "tenant": "OpenAI (self-developed)",
   "city": "Effingham County (Savannah Gateway Industrial Hub)",
   "region": "Georgia",
   "country": "USA",
   "lat": 32.3616,
   "lng": -81.3096,
   "coord_precision": "town",
   "mw_planned": 3200,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Announced Jul 22, 2026; Georgia Power PSC-approved agreement to deliver power in phases from 2028 through 2032",
   "capex_usd_b": 20,
   "power_notes": "Georgia Power approved to supply up to 3,200MW to the site in phases 2028-2032",
   "chips_notes": null,
   "notes": "1,400-acre campus in the Savannah Gateway Industrial Hub, ~45 minutes from Savannah; described as OpenAI's first self-designed/self-built data-center campus (as opposed to a Stargate partner-built site).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center",
     "title": "Project Camellia (OpenAI Data Center)",
     "date": "2026-07-22",
     "tier": 1
    },
    {
     "url": "https://www.cbsnews.com/atlanta/news/georgia-power-gets-clearance-to-serve-openais-massive-ai-data-center-in-effingham-county/",
     "title": "Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County",
     "date": "2026-08",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Project Tembo (fka Project Jade, Tallgrass/Crusoe), Cheyenne",
   "operator": "Google (via Jupiter Star Holdings, LLC); Tallgrass Energy (power/site developer)",
   "tenant": "Google",
   "city": "Cheyenne (Laramie County)",
   "region": "Wyoming",
   "country": "USA",
   "lat": 41.02,
   "lng": -104.8,
   "coord_precision": "site",
   "mw_planned": 2700,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Announced Jul 24, 2025 (1.8 GW, scalable to 10 GW); Laramie County approval Jan 2026 for 2.7 GW power hub; Crusoe paused/exited 'at the request of our customer' (reported Jun 9, 2026). Google took the project over from Crusoe and is re-applying for permits (Sep 2026): scaled to 4 buildings, ~$17B; site work from end-2026, partial operations H2 2028, completion end-2031.",
   "capex_usd_b": 7,
   "power_notes": "Off-grid 'bring your own power': Tallgrass BFC Power / Cheyenne Power Hub gas turbines + fuel cells (2.7 GW, $7B), carbon capture via Tallgrass CO2 hub. Capex $7B is Tallgrass power plant only; Crusoe build reported at >$50B potential.",
   "chips_notes": "Not disclosed.",
   "notes": "Switchgrass Industrial Park, ~600 acres SW of S. Greeley Hwy & Chalk Bluff Rd; five buildings ~805k sq ft each. Coordinates approximate.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://tallgrass.com/newsroom/press-releases/Crusoe",
     "title": "Tallgrass - Crusoe and Tallgrass announce AI data center in Wyoming",
     "date": "2025-07-24",
     "tier": 1
    },
    {
     "url": "https://www.wyomingnews.com/news/local_news/crusoe-pulls-out-of-project-jade-data-center/article_b9a8bde9-21c0-4e8a-9051-9154b91bf0eb.html",
     "title": "Wyoming Tribune Eagle - Crusoe pulls out of Project Jade data center",
     "date": "2026-06-09",
     "tier": 3
    },
    {
     "url": "https://cowboystatedaily.com/2026/01/08/huge-cheyenne-data-center-grows-to-2-7-gigawatts-nearly-triple-state-power-use/",
     "title": "Cowboy State Daily - Cheyenne data center grows to 2.7 GW",
     "date": "2026-01-08",
     "tier": 3
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/crusoe-pauses-work-on-18gw-cheyenne-wyoming-data-center-at-the-request-of-our-customer/",
     "title": "DCD - Crusoe pauses work on 1.8GW Cheyenne data center",
     "date": "2026-06",
     "tier": 2
    },
    {
     "url": "https://datacenters.atmeta.com/2024/07/hello-cheyenne/",
     "title": "Hello, Cheyenne! - Meta Data Centers ($800M+, 715,000 sq ft)",
     "date": "2024-07-02",
     "tier": 1
    },
    {
     "url": "https://cowboystatedaily.com/2026/04/03/data-center-boom-powers-cheyennes-push-for-annexation/",
     "title": "Cowboy State Daily - Data center boom powers Cheyenne's push for annexation",
     "date": "2026-04-03",
     "tier": 3
    },
    {
     "url": "https://news.microsoft.com/source/2026/04/14/microsoft-announces-intent-to-expand-datacenter-operations-in-cheyenne-accelerating-innovation-and-economic-growth/",
     "title": "Microsoft announces intent to expand datacenter operations in Cheyenne",
     "date": "2026-04-14",
     "tier": 1
    },
    {
     "url": "https://capcity.news/latest-news/2026/04/14/microsoft-plans-massive-3200-acre-expansion-of-cheyenne-data-centers/",
     "title": "Cap City News - Microsoft plans 3,200-acre expansion of Cheyenne data centers",
     "date": "2026-04-14",
     "tier": 3
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/crusoe-plans-18gw-data-center-campus-in-wyoming/",
     "title": "Crusoe plans 1.8GW data center campus in Wyoming",
     "date": "2025-08",
     "tier": 2
    },
    {
     "url": "https://www.bloomberg.com/news/articles/2026-06-09/crusoe-touts-5-gigawatts-worth-of-data-centers-deals-pauses-wyoming-site",
     "title": "Bloomberg - Crusoe Touts 5-Gigawatt Data Center Contracts, Pauses Wyoming Campus",
     "date": "2026-06-09",
     "tier": 2
    },
    {
     "url": "https://cowboystatedaily.com/2026/07/08/google-revealed-as-owner-of-wyomings-largest-data-center-now-project-tembo/",
     "title": "Cowboy State Daily - Google revealed as owner of Wyoming's largest data center (2.7 GW, 716 acres, 2031)",
     "date": "2026-07-08",
     "tier": 3
    },
    {
     "url": "https://www.wyomingnews.com/news/local_news/crusoe-tallgrass-partnership-reinforces-cheyenne-s-role-as-a-prime-location-for-data-centers/article_57d55bff-0721-4c13-a3dd-054743369dcb.html",
     "title": "Wyoming Tribune Eagle - Crusoe, Tallgrass partnership (1.8 GW scalable to 10 GW)",
     "date": "2025-09-10",
     "tier": 3
    },
    {
     "url": "https://county17.com/2026/09/11/google-stepping-in-for-crusoe-pitches-700-acre-data-center-campus-to-laramie-county-on-wednesday/",
     "title": "Google, stepping in for Crusoe, pitches 700-acre data center campus to Laramie County",
     "date": "2026-09-11",
     "tier": 2
    }
   ],
   "verified": true,
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://cowboystatedaily.com/2026/07/08/google-revealed-as-owner-of-wyomings-largest-data-center-now-project-tembo/",
     "note": "Confirmed via direct fetch: Crusoe was pushed out (not merely paused) and Google was revealed in July 2026 as the actual owner/customer via subsidiary Jupiter Star Holdings, taking over construction directly (planned completion 2031) at an "
    }
   ],
   "tier": "verified",
   "_orig_name": "Project Jade (Tallgrass / ex-Crusoe), Cheyenne",
   "corrected": "2026-09-24"
  },
  {
   "name": "Microsoft Fairwater Wisconsin",
   "operator": "Microsoft",
   "tenant": "Microsoft (OpenAI training workloads per Epoch)",
   "city": "Mount Pleasant",
   "region": "Wisconsin",
   "country": "USA",
   "lat": 42.7155,
   "lng": -87.8802,
   "coord_precision": "site",
   "mw_planned": 2263,
   "mw_operational": 369,
   "status": "operating",
   "timeline": "Land clearing 2023; Building 1 live Apr 2026 ('ahead of schedule'), fully operational Jun 2026; Building 2 by 2027-28; Epoch projects Buildings 3-11 by May 2028. Village approved up to 15 more data centers.",
   "capex_usd_b": 7.3,
   "power_notes": "We Energies grid (MISO). Capex $7.3B is Microsoft's announced Wisconsin investment (Sep 2025, per DCD); Epoch estimates $14B spent / $85.7B at full build.",
   "chips_notes": "GB200 NVL72 racks (72 Blackwell GPUs/rack); 'hundreds of thousands of GB200s' planned. Epoch: ~176k B200 now (~446k H100e), 353k by Q1 2027.",
   "notes": "315 acres, 1.2M sq ft across three buildings in phase 1. mw_planned is Epoch's projected full-campus IT power (Microsoft has not disclosed MW).",
   "value_type": "estimate",
   "sources": [
    {
     "url": "https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin",
     "title": "Epoch AI - Microsoft Fairwater Wisconsin",
     "date": "2026-09-01",
     "tier": 1
    },
    {
     "url": "https://www.wpr.org/news/microsoft-finishes-construction-mount-pleasant-data-center",
     "title": "WPR - Microsoft finishes construction of Mount Pleasant data center",
     "date": "2026-06-23",
     "tier": 2
    },
    {
     "url": "https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/",
     "title": "Microsoft - Inside the world's most powerful AI datacenter",
     "date": "2025-09-18",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-increases-wisconsin-data-center-investment-to-73bn-says-fairwater-site-will-be-worlds-most-powerful-data-center/",
     "title": "DCD - Microsoft increases Wisconsin data center investment to $7.3bn",
     "date": "2025-09",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-acquires-240-acres-in-kenosha-wisconsin-for-data-center-development/",
     "title": "Microsoft acquires 240 acres in Kenosha, Wisconsin, for data center development",
     "date": "2025-01-28",
     "tier": 2
    },
    {
     "url": "https://biztimes.com/microsoft-buys-240-acres-of-land-in-kenosha-for-data-center-development/",
     "title": "BizTimes - Microsoft buys 240 acres in Kenosha (four 250k sq ft buildings)",
     "date": "2025-01-27",
     "tier": 3
    },
    {
     "url": "https://www.wpr.org/news/kenosha-area-residents-data-center-moratorium-pause-microsoft-development",
     "title": "WPR - Kenosha residents push for data center moratorium",
     "date": "2026-08-27",
     "tier": 3
    }
   ],
   "verified": true,
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.wpr.org/news/microsoft-finishes-construction-mount-pleasant-data-center",
     "note": "Wisconsin Public Radio and Epoch AI confirm Fairwater Building 1 in Mount Pleasant is operating at 369MW IT power with a 2,263MW total campus plan by 2028, matching the row exactly."
    }
   ],
   "tier": "verified"
  },
  {
   "name": "Project Jupiter (Stargate New Mexico)",
   "operator": "BorderPlex Digital Assets / STACK Infrastructure (Blue Owl-backed)",
   "tenant": "Oracle Cloud Infrastructure (18-yr lease) for OpenAI",
   "city": "Santa Teresa (Doña Ana County)",
   "region": "New Mexico",
   "country": "USA",
   "lat": 31.87,
   "lng": -106.65,
   "coord_precision": "town",
   "mw_planned": 2200,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "County approved Sep 19 2025 ($165B IRB cap over 30 yrs, $50B first five years); construction from Sep/Q4 2025; first operations targeted Q4 2026; Epoch projects full 2.2GW by Q4 2028.",
   "capex_usd_b": 50,
   "power_notes": "Independent on-site microgrid: 700-900MW simple-cycle gas turbines initially, batteries, desalination; not on El Paso Electric grid; gas pipeline route approved on BLM land after State Land Office denial.",
   "chips_notes": "Epoch estimate ~4.6M H100-equivalents at full build.",
   "notes": "STACK PR says '>1GW'; 2.2GW is Epoch's projection. capex = $50B first-five-year figure; lifetime up to $165B. Lawsuits filed against IRB approval.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://www.globenewswire.com/news-release/2025/09/26/3157039/0/en/STACK-Infrastructure-Delivers-Digital-Infrastructure-for-Data-Center-Campus-in-New-Mexico.html",
     "title": "STACK Infrastructure Delivers Digital Infrastructure for Data Center Campus in New Mexico",
     "date": "2025-09-26",
     "tier": 1
    },
    {
     "url": "https://www.abqjournal.com/business/doa-ana-countys-project-jupiter-joins-500-billion-stargate-initiative-led-by-openai-oracle/493927",
     "title": "Doña Ana County's Project Jupiter joins $500 billion Stargate initiative (Albuquerque Journal)",
     "date": "2025-09-23",
     "tier": 2
    },
    {
     "url": "https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/",
     "title": "New Mexico's Project Jupiter data center part of larger Stargate (El Paso Matters)",
     "date": "2025-09-25",
     "tier": 2
    },
    {
     "url": "https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand",
     "title": "OpenAI Stargate: where the US sites stand (Epoch AI)",
     "date": "2026-04-17",
     "tier": 1
    },
    {
     "url": "https://www.foxbusiness.com/economy/openai-announces-five-new-stargate-data-center-locations-multiple-states-ai-project",
     "title": "Fox Business - OpenAI announces five new Stargate locations",
     "date": "2025-09-23",
     "tier": 2
    }
   ],
   "verified": true,
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.abqjournal.com/news/new-mexico-leaders-react-to-paused-permits-for-project-jupiter/3109143",
     "note": "As of late Aug 2026 the campus is ~10% built and construction continues under BorderPlex/STACK for Oracle/OpenAI despite an NM Supreme Court stay on the site's air and water permits, so under_construction still holds though litigation is a "
    }
   ],
   "tier": "verified"
  },
  {
   "name": "Amazon New Carlisle campus (Project Rainier)",
   "operator": "Amazon Web Services",
   "tenant": "Anthropic",
   "city": "New Carlisle, St. Joseph County",
   "region": "Indiana",
   "country": "USA",
   "lat": 41.706,
   "lng": -86.466,
   "coord_precision": "site",
   "mw_planned": 2200,
   "mw_operational": 910,
   "status": "operating",
   "timeline": "Land clearing Feb 2024; Buildings 1-7 live Jun 2025 (~398 MW); 8-11 Dec 2025 (~626 MW); 12-16 Mar 2026 (~910 MW IT); 17-18 projected Oct 2026 (~1,037 MW); Buildings 19-32 with Trainium3 projected Mar 2028 (~1,925 MW). AWS declared Rainier operational Oct 29, 2025.",
   "capex_usd_b": 11,
   "power_notes": "AEP Indiana Michigan Power (PJM); 2.25 GW grid draw at full buildout per reporting; direct air-cooled design.",
   "chips_notes": "~500,000 Trainium2 at Oct 2025 launch (Amazon via CNBC); Epoch AI estimates ~1.045M Trainium2 (~686k H100-equivalents) as of Sep 2026, ~1.75M H100-eq by 2028 with Trainium3.",
   "notes": "Included as the largest PJM-connected AI campus outside the Mid-Atlantic (I&M is a PJM utility). capex_usd_b = Amazon's reported $11B; Epoch AI estimates $34.5B spent to date and $72.9B at full buildout. MW figures are Epoch AI estimates (tier-1 research), not Amazon disclosures.",
   "value_type": "estimate",
   "sources": [
    {
     "url": "https://epoch.ai/data/ai-data-centers/directory/anthropic-amazon-new-carlisle",
     "title": "Epoch AI: Anthropic-Amazon New Carlisle",
     "date": "2026-09-02",
     "tier": 1
    },
    {
     "url": "https://www.cnbc.com/2025/10/29/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html",
     "title": "Amazon opens $11 billion AI data center Project Rainier in Indiana",
     "date": "2025-10-29",
     "tier": 2
    },
    {
     "url": "https://wsbt.com/news/local/amazons-project-rainier-starts-operations-create-jobs-ai-billion-dollar-project-near-new-carlisle-st-joseph-county-indiana",
     "title": "Amazon's Project Rainier starts operations in New Carlisle",
     "date": "2025-10-31",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/amazon-announces-15bn-data-center-ai-investment-plan-for-northern-indiana/",
     "title": "Amazon announces $15bn data center & AI investment plan for Northern Indiana",
     "date": "2025",
     "tier": 2
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://epoch.ai/data/ai-data-centers/directory/anthropic-amazon-new-carlisle",
     "note": "Epoch AI (tier 1 research, updated Sep 1 2026) confirms 910 MW IT operational (buildings 1-16, Mar 23 2026) and 1,925 MW projected (buildings 19-32, Mar 2028), matching the row exactly; figures are IT-load estimates. $11B capex is CNBC (tier 2, Oct 29 2025; blocked from re-fetch but cited). Status '"
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "Ridgeline Facility (Fundamental Data)",
   "operator": "Fundamental Data LLC",
   "tenant": "",
   "city": "Thomas/Davis, Tucker County",
   "region": "West Virginia",
   "country": "USA",
   "lat": 39.15,
   "lng": -79.5,
   "coord_precision": "town",
   "mw_planned": 2000,
   "mw_operational": null,
   "status": "announced",
   "timeline": "WVDEP air permit R13-3713 issued Aug 15, 2025; appeals dismissed Feb 5, 2026 and by Intermediate Court Aug 27, 2026; site control confirmed Aug 13, 2026; commercial operations targeted 2028; Phase 2 adds 3.1 GW gas.",
   "capex_usd_b": null,
   "power_notes": "Behind-the-meter under WV HB 2014 (microgrid, not grid-sold): Phase 1 ~785-800 MW gas + ~1.3 GW solar; Phase 2 +3.1 GW gas; 5 GW total generation. Initial 291-acre tract.",
   "chips_notes": "",
   "notes": "mw_planned = Phase 1 data-center load ('2+ GW', 14 buildings) per POWER; permit documents heavily redacted; strong local opposition.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://www.powermag.com/contested-5-gw-ridgeline-gas-solar-and-data-center-complex-in-west-virginia-clears-site-control-question/",
     "title": "Contested 5-GW Ridgeline Gas, Solar, and Data-Center Complex in West Virginia Clears Site Control Question",
     "date": "2026-08-18",
     "tier": 2
    },
    {
     "url": "https://westvirginiawatch.com/2026/08/27/wv-intermediate-court-dismisses-environmental-groups-challenges-to-fundamental-data-permit/",
     "title": "WV Intermediate Court dismisses environmental groups' challenges to Fundamental Data permit",
     "date": "2026-08-27",
     "tier": 3
    },
    {
     "url": "https://www.wvhighlands.org/tucker-county-data-center-ridgeline-facility/",
     "title": "Tucker County Data Center 'Ridgeline Facility' (WV Highlands Conservancy)",
     "date": "",
     "tier": 3
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://www.powermag.com/contested-5-gw-ridgeline-gas-solar-and-data-center-complex-in-west-virginia-clears-site-control-question/",
     "note": "POWER magazine (tier 2, Aug 18 2026) confirms 14 buildings with 'over 2 GW of computing load', ~800 MW Phase 1 gas, 3.1 GW Phase 2, ~1.3 GW solar, WVDEP site-control confirmation Aug 13 2026, 2028 COD target. West Virginia Watch (Aug 27 2026) confirms Intermediate Court dismissed both appeals on jur"
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "Poolside Project Horizon",
   "operator": "Poolside (with Longfellow Ranch / Mitchell family land)",
   "tenant": "CoreWeave was anchor tenant for phase 1 (deal collapsed Apr 2026)",
   "city": "Fort Stockton (Pecos County)",
   "region": "Texas",
   "country": "USA",
   "lat": 30.894,
   "lng": -102.879,
   "coord_precision": "town",
   "mw_planned": 2000,
   "mw_operational": 0,
   "status": "paused",
   "timeline": "Announced Oct 15 2025: eight 250MW phases on 568 acres; CoreWeave 15-yr lease for first 250MW (+500MW option), GPUs to start Dec 2025. Apr 2026: FT reported CoreWeave partnership collapsed after Poolside missed cluster deployment timeline; Poolside seeking new partners for up to 400MW.",
   "capex_usd_b": null,
   "power_notes": "Behind-the-meter aero-derivative gas turbines with SCR, batteries, grid interconnect redundancy; adjacent to Permian Basin gas hub.",
   "chips_notes": "Plan called for >40,000 Nvidia GB300 NVL72 GPUs in phase 1 (CoreWeave PR).",
   "notes": "Status set to 'paused' because anchor tenant withdrew; project not formally cancelled.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Partnership-with-Foundation-Model-Company-Poolside-to-Deliver-AI-Cloud-Services/default.aspx",
     "title": "CoreWeave Announces Partnership with Poolside",
     "date": "2025-10-15",
     "tier": 1
    },
    {
     "url": "https://www.bloomberg.com/news/articles/2025-10-15/ai-startup-poolside-teams-with-coreweave-on-massive-data-center",
     "title": "AI Startup Poolside Partners With CoreWeave to Build Massive US Data Center (Bloomberg)",
     "date": "2025-10-15",
     "tier": 2
    },
    {
     "url": "https://www.publicpower.org/periodical/article/plans-unveiled-2-gw-artificial-intelligence-campus-west-texas",
     "title": "Plans Unveiled for 2 GW AI Campus in West Texas (APPA)",
     "date": "2025-10-15",
     "tier": 2
    },
    {
     "url": "https://baxtel.com/news/poolside-pursues-new-partners-for-texas-data-center-following-coreweave-deal-breakdown",
     "title": "Poolside pursues new partners after CoreWeave deal breakdown (citing FT)",
     "date": "2026-04-04",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/poolside-seeks-partners-for-data-center-in-texas-after-coreweave-deal-falls-apart/",
     "note": "DCD confirms the CoreWeave anchor-tenant deal for Poolside's Fort Stockton campus collapsed by Apr 2026 and follow-on Google talks also ended, leaving Poolside seeking new partners for a scaled-back ~400MW build, consistent with the row's p"
    }
   ],
   "verified": true
  },
  {
   "name": "Tract Reno (TRIC Peru Shelf / South Valley park)",
   "operator": "Tract (master-planned park; tenants build)",
   "tenant": "Undisclosed hyperscale/wholesale tenants",
   "city": "Storey County (TRIC)",
   "region": "Nevada",
   "country": "USA",
   "lat": 39.52,
   "lng": -119.4,
   "coord_precision": "town",
   "mw_planned": 2000,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "~3,400 acres assembled by Feb 2024 (later 8,590 / 11,000+ acres); NV Energy supply agreement with deliveries from 2026.",
   "capex_usd_b": 3,
   "power_notes": "NV Energy agreement for up to 2GW; Silicon Ranch renewable partnership.",
   "chips_notes": "n/a (land/power platform).",
   "notes": "Park-level capacity, not a single operator campus.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://www.datacenterfrontier.com/site-selection/article/55305086/nv1-and-the-nevada-hyperscale-boom-vantage-data-centers-bets-3b-on-the-ai-future",
     "title": "NV1 and the Nevada Hyperscale Boom (Data Center Frontier)",
     "date": "2025-07-25",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/tract-acquires-8590-acres-in-reno-nevada-for-data-center-park/",
     "title": "Tract acquires 8,590 acres in Reno, Nevada, for data center park",
     "date": "2024",
     "tier": 2
    },
    {
     "url": "https://www.commercialsearch.com/news/tract-acquires-another-517-acres-near-reno/",
     "title": "Tract Adds 500 Acres to Data Center Campus (Commercial Property Executive)",
     "date": "2024-02-08",
     "tier": 3
    },
    {
     "url": "https://vantage-dc.com/data-center-locations/north-america/reno-nevada/",
     "title": "Vantage Data Centers: Reno, Nevada campus",
     "date": "2025",
     "tier": 1
    }
   ],
   "verified": true,
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 1,
     "evidence_url": "https://www.tract.com/news/tract-breaks-ground-on-peru-shelf-technology-park-in-storey-county-nevada/",
     "note": "Tract's own press release shows groundbreaking on Peru Shelf Technology Park occurred in April 2024, and Data Center Frontier (Jul 2025) confirms construction/grading has continued since, so the campus is under_construction, not merely anno"
    }
   ],
   "tier": "verified",
   "corrected": true
  },
  {
   "name": "xAI Colossus 2 / MACROHARDRR (Memphis-Southaven)",
   "operator": "xAI (SpaceXAI)",
   "tenant": "xAI; Epoch lists Anthropic and Cursor as additional users",
   "city": "Memphis (Whitehaven) / Southaven, MS",
   "region": "Tennessee / Mississippi",
   "country": "USA",
   "lat": 35.0175,
   "lng": -90.0515,
   "coord_precision": "site",
   "mw_planned": 2000,
   "mw_operational": 946,
   "status": "operating",
   "timeline": "5420 Tulane Rd warehouse bought Feb-Mar 2025; 200 MW live Sep 2025; first 110k GB200 cluster Oct 2025-Jan 2026; second 110k GB300 cluster Apr 2026; third phase (220k GB300, 400+ MW) Jun 2026; Building 3 (MACROHARDRR, Southaven) ~Feb 2027 (Epoch). Mississippi ops expected from Feb 2026.",
   "capex_usd_b": 20,
   "power_notes": "Behind-the-meter gas: Solaris rental turbines (7x35 MW in Southaven; 50-70 temporary units), former Duke Energy plant site in Southaven, Tesla Megapacks; permanent ~1.2 GW simple-cycle plant (41 turbines) permitted Mar 2026 per Wikipedia (Earthjustice Clean Air Act notice Feb 2026). Capex $20B+ is xAI's Mississippi commitment (Gov. Reeves); Epoch estimates $35.8B spent / $58B projected.",
   "chips_notes": "Epoch: 110k B200 + 330k B300 now (~1.1M H100e), 612k B300 projected Q1 2027; 555k Nvidia GPUs ordered (~$18B) per Techzine.",
   "notes": "'Nearly 2 GW' on completion per Governor Reeves release; Epoch models 1,531 MW IT by Q1 2027. Data hall in Memphis, generation across state line in Southaven.",
   "value_type": "estimate",
   "sources": [
    {
     "url": "https://epoch.ai/data/ai-data-centers/directory/colossus-2",
     "title": "Epoch AI - Colossus 2",
     "date": "2026-09-01",
     "tier": 1
    },
    {
     "url": "https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/",
     "title": "Gov. Reeves - xAI investing more than $20 billion in Southaven",
     "date": "2026-01-08",
     "tier": 1
    },
    {
     "url": "https://newsletter.semianalysis.com/p/xais-colossus-2-first-gigawatt-datacenter",
     "title": "SemiAnalysis - xAI's Colossus 2: first gigawatt datacenter",
     "date": "2025-09-16",
     "tier": 2
    },
    {
     "url": "https://www.techzine.eu/news/infrastructure/137578/xai-expands-colossus-megadata-center-to-2-gigawatts/",
     "title": "Techzine - xAI expands Colossus to 2 gigawatts",
     "date": "2025-12-31",
     "tier": 3
    },
    {
     "url": "https://en.wikipedia.org/wiki/Colossus_(data_center)",
     "title": "Wikipedia - Colossus (data center)",
     "date": "2026",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/",
     "note": "Mississippi governor's office confirms xAI's $20B+ Southaven/DeSoto County MACROHARDRR project targeting nearly 2GW with Feb 2026 ops start, consistent with the 946 MW operational figure on the reported growth curve (200MW Sep2025 to ~946MW"
    }
   ],
   "verified": true
  },
  {
   "name": "IREN Sweetwater (Sweetwater 1 & 2)",
   "operator": "IREN",
   "tenant": "Undisclosed in fetched sources (Microsoft GB300 deal widely reported; not verified here)",
   "city": "Sweetwater",
   "region": "Texas",
   "country": "USA",
   "lat": 32.4709,
   "lng": -100.4059,
   "coord_precision": "town",
   "mw_planned": 2000,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Sweetwater 1: 1,400 MW, 1,700 acres, energization 2026; Sweetwater 2: 600 MW, 500 acres, energization 2027 (IREN site).",
   "capex_usd_b": null,
   "power_notes": "Direct ERCOT grid connection; 2,200 acres across two sites; air and liquid cooling; capacity for >700k liquid-cooled GPUs.",
   "chips_notes": "IREN: supports >700,000 liquid-cooled GPUs; tenant/GPU model not sourced.",
   "notes": "Only IREN's own site page was retrievable; press releases on the Microsoft deal could not be fetched (search budget exhausted).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://iren.com/data-centers/sweetwater",
     "title": "IREN - Sweetwater data center campus",
     "date": "2026",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://iren.com/data-centers/sweetwater",
     "note": "IREN's own site and DCD's energization coverage confirm the 1,400+600 MW phased build, under_construction status, and zero operational IT load; the confirmed $9.7B Microsoft GB300 deal is explicitly deployed at IREN's separate Childress, TX"
    }
   ],
   "verified": true
  },
  {
   "name": "Amazon (AWS) Susquehanna nuclear campus (ex-Cumulus)",
   "operator": "Amazon Web Services",
   "tenant": "",
   "city": "Salem Township (Berwick), Luzerne County",
   "region": "Pennsylvania",
   "country": "USA",
   "lat": 41.0925,
   "lng": -76.1425,
   "coord_precision": "site",
   "mw_planned": 1920,
   "mw_operational": 48,
   "status": "under_construction",
   "timeline": "48 MW first building completed early 2023 by Cumulus; AWS bought 1,200-acre campus Mar 2024 ($650M); ~1,600 acres rezoned May 2024 for 15 buildings over a decade; PPA ramp 840-1,200 MW by 2029, 1,680-1,920 MW by 2032, contract through 2042.",
   "capex_usd_b": 0.65,
   "power_notes": "Talen Energy Susquehanna Steam Electric Station (2 BWRs). Original 960 MW behind-the-meter ISA rejected by FERC Nov 2024; restructured Jun 2025 as 1,920 MW front-of-meter PPA via PJM/PPL grid; existing 300 MW co-location arrangement folded in. Parties exploring SMRs and uprates.",
   "chips_notes": "",
   "notes": "mw_operational left null: only the 48 MW shell (2023) is confirmed complete; 300 MW is contracted but energized status as of Sep 2026 not sourced. Campus is part of Amazon's $20B Pennsylvania commitment (Jun 2025) shared with Falls Township. Sale price $650M.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.utilitydive.com/news/talen-amazon-aws-susquehanna-nuclear-data-centert/750440/",
     "title": "Talen to sell Amazon 1.9 GW from Susquehanna nuclear plant",
     "date": "2025-06-11",
     "tier": 2
    },
    {
     "url": "https://www.datacenterfrontier.com/hyperscale/article/33038288/aws-eyes-960-mw-for-newly-acquired-nuclear-power-data-center-in-pennsylvania",
     "title": "AWS Eyes 960 MW for Newly Acquired Nuclear Power Data Center in Pennsylvania",
     "date": "2024-03-06",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/aws-granted-1600-acre-rezoning-request-plans-15-building-campus-at-pennsylvania-nuclear-site/",
     "title": "AWS granted 1,600-acre rezoning request, plans 15-building campus at Pennsylvania nuclear site",
     "date": "2024-05-30",
     "tier": 2
    },
    {
     "url": "https://www.ans.org/news/article-5842/amazon-buys-nuclearpowered-data-center-from-talen/",
     "title": "Amazon buys nuclear-powered data center from Talen (ANS)",
     "date": "2024-03-07",
     "tier": 2
    },
    {
     "url": "https://www.aboutamazon.com/news/aws/amazon-pennsylvania-investment-cloud-infrastructure-ai-innovation",
     "title": "Amazon plans to invest $20 billion in Pennsylvania",
     "date": "2025-06-09",
     "tier": 1
    }
   ],
   "corrected": true,
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": false,
     "evidence_url": "https://www.utilitydive.com/news/talen-amazon-aws-susquehanna-nuclear-data-centert/750440/",
     "note": "mw_planned=1,920 is the top of Talen's PPA ramp (840-1,200 MW by 2029; 1,680-1,920 MW by 2032, through 2042) per Talen investor deck via Utility Dive (tier 2, Jun 11 2025) — it is contracted grid power, not IT load; Talen previously said the 1,200-acre campus supports 'up to 960MW' (DCD May 30 2024)"
    },
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.utilitydive.com/news/talen-amazon-aws-susquehanna-nuclear-data-centert/750440/",
     "note": "UtilityDive and Data Center Frontier confirm the exact 1,920 MW planned figure, the 840-1200 MW by 2029 / 1,680-1,920 MW by 2032 ramp schedule, the 48 MW first Cumulus building, and under_construction status at the correctly-located Salem T"
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "Stafford Technology Campus (Peterson Companies)",
   "operator": "Peterson Companies",
   "tenant": "",
   "city": "Stafford County",
   "region": "Virginia",
   "country": "USA",
   "lat": 38.42,
   "lng": -77.41,
   "coord_precision": "town",
   "mw_planned": 1800,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Master-planned 1.8 GW on 525 acres (5.5M sq ft); Peterson also plans a second 300 MW/83-acre Stafford property. Tier-3 tracker lists 1,000 MW under construction as of Aug 2026 (not confirmed by tier 1/2).",
   "capex_usd_b": null,
   "power_notes": "Dominion (PJM); part of the >2 GW Stafford pipeline DCD describes.",
   "chips_notes": "",
   "notes": "DCD analysis is undated on-page; treat MW as master-plan figure. dcmap.us (tier 3) shows 'Stafford Technology Campus 1,000 MW under construction' and 'Stack Infrastructure Fredericksburg 1,100 MW planned' in Stafford — the Stack figure could not be tier-1/2 sourced and is omitted as a row.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/analysis/the-future-of-virginia-post-loudoun/",
     "title": "The future of data centers in Virginia, post-Loudoun (DCD analysis)",
     "date": "",
     "tier": 2
    },
    {
     "url": "https://dcmap.us/markets/northern-virginia/",
     "title": "dcmap.us Northern Virginia market page (aggregator)",
     "date": "2026-08",
     "tier": 3
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://www.datacenterdynamics.com/en/analysis/the-future-of-virginia-post-loudoun/",
     "note": "DCD long read (tier 2, Nov 4 2024) quotes Peterson's Adam Cook: 525-acre campus, >25 buildings, 5.5M sq ft, 'a 1.8GW campus', plus an 83-acre/300 MW second Stafford property. The tier-3 dcmap listing (1,000 MW 'under construction', attributed to STACK) is not corroborated by any tier-1/2 source and "
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "YTL-JLand STeP West campus (Ibrahim Technopolis)",
   "operator": "YTL Power International with JLand Group",
   "tenant": "TBD (hyperscale/AI)",
   "city": "Sedenak / Kulai",
   "region": "Johor",
   "country": "Malaysia",
   "lat": 1.72,
   "lng": 103.55,
   "coord_precision": "town",
   "mw_planned": 1500,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Announced 20 Aug 2026; 1.3-1.5 GW; no construction schedule published",
   "capex_usd_b": null,
   "power_notes": "TNB grid; YTL renewable portfolio",
   "chips_notes": "Not disclosed",
   "notes": "Part of YTL's stated path to ~2.7 GW in Johor and 3-4 GW group-wide (Forbes: 2.4 GW by 2030).",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://w.media/ytl-power-and-jland-to-partner-to-build-up-to-1-5gw-data-center-in-johor/",
     "title": "YTL Power and JLand to partner to build up to 1.5GW data center in Johor",
     "date": "2026-08-20",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.ytlpowerinternational.com/press-releases/ytl-power-and-jland-group-collaborate-on-new-gigawatt-scale-data-centre-campus-at-sedenak-tech-park/",
     "note": "YTL's own press release plus NST/Bernama/DCD coverage confirm the JLand partnership at Sedenak Tech Park West with a 1.3-1.5GW planned range and no construction timeline yet, matching the row's announced status and 1500MW figure; coordinate"
    }
   ],
   "verified": true
  },
  {
   "name": "Core Scientific Muskogee campus",
   "operator": "Core Scientific",
   "tenant": "CoreWeave (initial 70 MW IT); further tenants undisclosed",
   "city": "Muskogee",
   "region": "Oklahoma",
   "country": "USA",
   "lat": 35.7479,
   "lng": -95.3697,
   "coord_precision": "town",
   "mw_planned": 1500,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "100 MW gross (70 MW IT) facility broke ground 2025, delivery targeted Q2 2026 (status not confirmed in fetched sources); 1.5 GW gross / ~1.0 GW leasable expansion announced May 6, 2026; Polaris DS acquisition closed Aug 14, 2026 ($444M) adding ~440 MW in-service grid capacity; next ~82 MW to customer from H2 2027.",
   "capex_usd_b": null,
   "power_notes": "Oklahoma Gas & Electric (SPP) grid; 1.5 GW is gross utility power, ~1.0 GW leasable.",
   "chips_notes": "Initial 70 MW facility built for Nvidia GPUs (CoreWeave); AMD partnership (Jul 2026) covers ~530 MW across five unnamed sites.",
   "notes": "mw_planned is gross power; leasable ~1,000 MW. Operational MW unknown - not disclosed per-site in Q2 2026 results.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://investors.corescientific.com/news-events/press-releases/detail/142/core-scientific-completes-acquisition-of-polaris-ds-advancing-planned-muskogee-expansion-to-1-5-gw-of-gross-power",
     "title": "Core Scientific completes acquisition of Polaris DS, advancing Muskogee expansion to 1.5 GW",
     "date": "2026-08-14",
     "tier": 1
    },
    {
     "url": "https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus",
     "title": "Core Scientific plans expansion to 1.5 GW at Muskogee",
     "date": "2026-05-06",
     "tier": 1
    },
    {
     "url": "https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center",
     "title": "Core Scientific and Port Muskogee break ground on 100 MW HPC data center",
     "date": "2025",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://investors.corescientific.com/news-events/press-releases/detail/142/core-scientific-completes-acquisition-of-polaris-ds-advancing-planned-muskogee-expansion-to-1-5-gw-of-gross-power",
     "note": "Core Scientific's investor press releases confirm the 1.5GW Muskogee expansion and CoreWeave 70MW tenancy, and Epoch's tracker shows Building 1 still not energized as of Sept 2026, so under_construction/mw_operational=null remains accurate."
    }
   ],
   "verified": true
  },
  {
   "name": "Core Scientific Pecos campus",
   "operator": "Core Scientific",
   "tenant": "Undisclosed",
   "city": "Pecos",
   "region": "Texas",
   "country": "USA",
   "lat": 31.4229,
   "lng": -103.4932,
   "coord_precision": "town",
   "mw_planned": 1500,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Expansion to 1.5 GW gross / ~1.0 GW leasable announced Apr 27, 2026; first data hall footings set; initial AI capacity expected early 2027.",
   "capex_usd_b": null,
   "power_notes": "ERCOT; 300 MW gross currently used for bitcoin mining plus incremental 300 MW contracted with utility; remainder to be secured.",
   "chips_notes": "Not disclosed.",
   "notes": "Existing 300 MW is crypto mining, not AI; mw_operational for AI left null.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://investors.corescientific.com/news-events/press-releases/detail/134/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-pecos-texas-campus",
     "title": "Core Scientific plans expansion to 1.5 GW at Pecos, Texas",
     "date": "2026-04-27",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://investors.corescientific.com/news-events/press-releases/detail/134/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-pecos-texas-campus",
     "note": "Core Scientific's own press release and follow-up tier-2 coverage confirm the 1.5GW Pecos expansion, ongoing construction with footings set, and initial capacity targeted for early 2027, matching the row."
    }
   ],
   "verified": true
  },
  {
   "name": "Vantage Frontier (Stargate Shackelford County)",
   "operator": "Vantage Data Centers",
   "tenant": "Oracle / OpenAI (Stargate)",
   "city": "Albany (Shackelford County)",
   "region": "Texas",
   "country": "USA",
   "lat": 32.7235,
   "lng": -99.2976,
   "coord_precision": "town",
   "mw_planned": 1400,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Announced Aug 19, 2025; construction underway; first data center delivery H2 2026 (Vantage); full 10-building build-out Q4 2028 (Epoch).",
   "capex_usd_b": 25,
   "power_notes": "Vantage: multiple diverse power feeds, closed-loop chilled water. Epoch: on-site natural gas microgrid planned. ERCOT region.",
   "chips_notes": "No GPU counts disclosed; Epoch projects ~4.2M H100e at full build.",
   "notes": "1,200 acres, 10 single-story buildings, 3.7M sq ft, 250kW+ racks. Vantage states 1.4 GW critical IT; Epoch models 2.0 GW planned.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
     "title": "Vantage unveils Frontier, a $25B mega-campus in Texas",
     "date": "2025-08-19",
     "tier": 1
    },
    {
     "url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
     "title": "Vantage - Shackelford County, TX campus page",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand",
     "title": "Epoch AI - OpenAI Stargate: where the US sites stand",
     "date": "2026-04-17",
     "tier": 1
    },
    {
     "url": "https://www.foxbusiness.com/economy/openai-announces-five-new-stargate-data-center-locations-multiple-states-ai-project",
     "title": "Fox Business - OpenAI announces five new Stargate locations",
     "date": "2025-09-23",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
     "note": "Vantage's own site and DCD groundbreaking coverage confirm 1.4GW/$25B Frontier campus under construction in Shackelford County with first building due H2 2026, and Albany, TX coordinates match the row's lat/lng exactly."
    }
   ],
   "verified": true
  },
  {
   "name": "Campus AI (MGX / Bpifrance / Mistral / NVIDIA), Paris region",
   "operator": "JV of MGX, Bpifrance, Mistral AI, NVIDIA (with Bouygues, EFD, RTE, Sipartech)",
   "tenant": "Mistral AI and sovereign cloud users",
   "city": "Fouju (reported), Seine-et-Marne",
   "region": "Île-de-France",
   "country": "France",
   "lat": 48.573,
   "lng": 2.781,
   "coord_precision": "town",
   "mw_planned": 1400,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Announced May 20, 2025; construction to begin H2 2026; operations from 2028; full build ~12 data centers on 70 ha",
   "capex_usd_b": null,
   "power_notes": "French nuclear-heavy grid; RTE (TSO) is an ecosystem partner",
   "chips_notes": "NVIDIA platforms (counts not disclosed)",
   "notes": "Investment figures conflict: €8.5bn (RCR Wireless) vs €30–50bn UAE France-wide pledge (DCD); capex left null. Fouju location per DCD reporting; JV announcement did not name the commune.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/mgx-bpifrance-nvidia-and-mistral-ai-plan-14gw-paris-data-center-campus/",
     "title": "DCD: MGX, Bpifrance, Nvidia and Mistral AI plan 1.4GW Paris campus",
     "date": "2025-05-20",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/analysis/france-ai-data-center-build-out-emmanuel-macron/",
     "title": "DCD analysis: The inside story of the French AI data center build-out",
     "date": "2025-09-11",
     "tier": 2
    },
    {
     "url": "https://www.rcrwireless.com/20250522/ai-ml/nvidia-ai-campus-france",
     "title": "RCR Wireless: AI campus initiative unites MGX, Nvidia and French partners",
     "date": "2025-05-22",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/mgx-bpifrance-nvidia-and-mistral-ai-plan-14gw-paris-data-center-campus/",
     "note": "Campus AI at Fouju remains confirmed at 1.4GW planned and still pre-construction/announced as of mid-2026, even as the JV separately announced a national expansion to 3GW via a second site."
    }
   ],
   "verified": true
  },
  {
   "name": "Stargate Michigan - Related Digital 'The Barn' (Saline Township)",
   "operator": "Related Digital (developer); Oracle",
   "tenant": "OpenAI (Stargate)",
   "city": "Saline Township",
   "region": "Michigan",
   "country": "USA",
   "lat": 42.1667,
   "lng": -83.7816,
   "coord_precision": "town",
   "mw_planned": 1400,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Announced Oct 2025 (OpenAI: >1 GW, $7B+); foundation work underway Apr 2026; completion Q4 2028 (Epoch).",
   "capex_usd_b": 7,
   "power_notes": "DTE Energy grid (100%) with battery storage (Epoch). No on-site generation.",
   "chips_notes": "None disclosed; Epoch projects ~2.9M H100e.",
   "notes": "OpenAI announced >1 GW / $7B; Epoch models 1.4 GW planned. Capex from OpenAI blog headline figure (page body blocked to fetch; value from search snippet).",
   "value_type": "estimate",
   "sources": [
    {
     "url": "https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand",
     "title": "Epoch AI - OpenAI Stargate: where the US sites stand",
     "date": "2026-04-17",
     "tier": 1
    },
    {
     "url": "https://openai.com/index/expanding-stargate-to-michigan/",
     "title": "OpenAI - Expanding Stargate to Michigan",
     "date": "2025-10",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand",
     "note": "Epoch confirms 1.4GW planned capacity for Stargate Michigan, and Related Digital's own June 2026 press release confirms all campus buildings are actively under construction, matching the row."
    }
   ],
   "verified": true
  },
  {
   "name": "Prometheus Hyperscale WY-1 (Evanston)",
   "operator": "Prometheus Hyperscale",
   "tenant": "Undisclosed (binding tenant agreement claimed; Meta/Microsoft courted)",
   "city": "Evanston",
   "region": "Wyoming",
   "country": "USA",
   "lat": 41.268,
   "lng": -110.963,
   "coord_precision": "town",
   "mw_planned": 1250,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Originally 120 MW, expanded to 1.2-1.25 GW+; construction expected to start late 2026/early 2027; operations targeted 2027; separate 1.25 GW Casper campus planned",
   "capex_usd_b": null,
   "power_notes": "Fully off-grid on-site natural gas reciprocating engines via Kern River pipeline with a Fortune 500 IPP partner",
   "chips_notes": "Not disclosed",
   "notes": "County officials describe project as far from fruition; treat as speculative.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://www.prometheushyperscale.com/projects",
     "title": "Prometheus Hyperscale - Projects (Evanston 1.25GW+)",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://cowboystatedaily.com/2026/05/26/prometheus-faces-skeptical-crowd-in-evanston-over-huge-1-2gw-data-center/",
     "title": "Cowboy State Daily - Prometheus faces skeptical crowd in Evanston over 1.2 GW data center",
     "date": "2026-05-27",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://cowboystatedaily.com/2026/08/25/prometheus-pushes-ahead-on-32b-wyoming-data-centers-as-legal-challenge-fades/",
     "note": "As of Aug 25 2026 the Evanston site is still in final county permitting with construction not yet begun, consistent with the row's 'announced' status and ~1.25GW/$32B figures."
    }
   ],
   "verified": true
  },
  {
   "name": "Stargate Abilene (Crusoe / Oracle OCI)",
   "operator": "Crusoe (developer/owner JV with Blue Owl & Primary Digital); Oracle Cloud Infrastructure (lessee/operator)",
   "tenant": "OpenAI",
   "city": "Abilene",
   "region": "Texas",
   "country": "USA",
   "lat": 32.4487,
   "lng": -99.7331,
   "coord_precision": "town",
   "mw_planned": 1200,
   "mw_operational": 421,
   "status": "operating",
   "timeline": "Construction start Jun 2024; Buildings 1-2 energized Sep 2025; Buildings 3-4 operational May 2026; Buildings 5-8 projected Nov 2026 (Epoch); campus complete ~Q4 2026. Planned ~600 MW expansion beyond 1.2 GW scrapped (DCD/Tom's Hardware, 2026).",
   "capex_usd_b": 15.9,
   "power_notes": "ERCOT grid plus on-site natural gas (Lancium Clean Campus; local wind in mix per Epoch). Capex figure is Epoch estimate of spend to date ($31.9B projected at full build).",
   "chips_notes": "Epoch estimate as of 2026-09-01: ~100.8k Nvidia B200 + 100.8k B300 (201.6k GPUs, ~509k H100e); projected 403k GPUs (~1M H100e) at full build. Oracle began delivering GB200 NVL72 racks Jun 2025.",
   "notes": "Flagship Stargate site; 8 buildings ~4M sq ft. mw_planned 1.2 GW is the announced campus figure; Epoch models 843 MW critical IT at full build. Oracle/OpenAI dropped plans for further Abilene expansion; Meta reported in talks for the Crusoe capacity (DCD headline; article body not retrievable).",
   "value_type": "estimate",
   "sources": [
    {
     "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live",
     "title": "Crusoe Announces Flagship Abilene Data Center is Live",
     "date": "2025-09-30",
     "tier": 1
    },
    {
     "url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene",
     "title": "Epoch AI - OpenAI Stargate Abilene",
     "date": "2026-09-01",
     "tier": 1
    },
    {
     "url": "https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand",
     "title": "Epoch AI - OpenAI Stargate: where the US sites stand",
     "date": "2026-04-17",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/oracleopenai-drop-plans-to-expand-flagship-abilene-stargate-site-meta-in-talks-to-pick-up-crusoe-capacity-with-nvidias-help/",
     "title": "DCD - Oracle/OpenAI drop plans to expand flagship Abilene Stargate site",
     "date": "2026",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene",
     "note": "Multiple tier-2 sources confirm the ~600MW expansion beyond 1.2GW was scrapped in 2026, and Epoch's tracker shows planned capacity holding at 1.2GW with operational IT power at 421MW, matching the row exactly under 'operating' status."
    }
   ],
   "verified": true
  },
  {
   "name": "Stargate Milam County ('Freebird')",
   "operator": "SB Energy (SoftBank)",
   "tenant": "OpenAI",
   "city": "Milano (Milam County)",
   "region": "Texas",
   "country": "USA",
   "lat": 30.7085,
   "lng": -96.86,
   "coord_precision": "town",
   "mw_planned": 1200,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Partnership announced Jan 2026; first-phase 548,950 sq ft / 4-hall building filed with $470M cost and 15 Oct 2026 completion; further phases to follow",
   "capex_usd_b": null,
   "power_notes": "ERCOT; SB Energy to build utility-scale solar + battery storage; SoftBank and OpenAI each committed $500M to SB Energy",
   "chips_notes": "Not disclosed",
   "notes": "595-acre site ~70 mi NE of Austin (per Austin American-Statesman, tier 3). Capex not disclosed beyond $470M first phase and $1B equity into SB Energy. Coordinates are nearest town; site not geocoded.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/",
     "title": "SoftBank's SB Energy to build and operate OpenAI's 1.2GW Stargate data center in Milam County",
     "date": "2026-01-12",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/openai-stargates-milam-texas-freebird-data-center-to-span-548950-sq-ft-in-first-phase/",
     "title": "OpenAI Stargate's Milam 'Freebird' data center to span 548,950 sq ft in first phase",
     "date": "2026-04-22",
     "tier": 2
    },
    {
     "url": "https://openai.com/index/stargate-sb-energy-partnership/",
     "title": "OpenAI and SoftBank Group partner with SB Energy",
     "date": "2026-01-12",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/",
     "note": "Confirmed by DCD and OpenAI/SB Energy announcements: SB Energy (SoftBank) building and operating a 1.2GW Stargate site in Milam County for OpenAI, first-phase building ($470M) filed for completion 15 Oct 2026, remaining under_construction w"
    }
   ],
   "verified": true
  },
  {
   "name": "Start Campus SINES DC (SIN01–SIN06)",
   "operator": "Start Campus (Davidson Kempner / Pioneer Point Partners)",
   "tenant": "Nscale → Microsoft (12,600 GB300 from Q1 2026; 66,000+ Vera Rubin in 200MW second building from late 2027)",
   "city": "Sines",
   "region": "Setúbal (Alentejo Litoral)",
   "country": "Portugal",
   "lat": 37.942,
   "lng": -8.82,
   "coord_precision": "town",
   "mw_planned": 1200,
   "mw_operational": 26,
   "status": "operating",
   "timeline": "SIN01 (26MW) operational Q4 2024, inaugurated Apr 2025; SIN02 (180–240MW) ready for service from 2026; SIN03–06 up to 240MW each; full campus by 2030",
   "capex_usd_b": 9.2,
   "power_notes": "1.2GW grid capacity secured from REN (Portuguese TSO); 100% renewable; seawater cooling (Nautilus), PUE 1.1, WUE 0",
   "chips_notes": "~12,600 NVIDIA GB300 for Microsoft (Q1 2026); 66,000+ NVIDIA Vera Rubin NVL72 GPUs in 200MW building starting late 2027",
   "notes": "Capex €8.5bn converted at ~1.08 USD/EUR (estimate). SIN02 2026 ready-for-service not confirmed by a fetched 2026 primary source; mw_operational reflects SIN01 only.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.startcampus.pt/press_release_august_2024_1gw",
     "title": "Start Campus: SINES DC becomes 1.2GW campus",
     "date": "2024-08-08",
     "tier": 1
    },
    {
     "url": "https://www.startcampus.pt/start-campus-inaugurates-sin01-data-center",
     "title": "Start Campus inaugurates SIN01",
     "date": "2025-04-04",
     "tier": 1
    },
    {
     "url": "https://www.nscale.com/press-releases/nscale-start-campus",
     "title": "Nscale to deliver 66,000+ NVIDIA Rubin GPUs to Microsoft at Start Campus",
     "date": "2026-05-05",
     "tier": 1
    },
    {
     "url": "https://www.nscale.com/press-releases/nscale-microsoft-2025",
     "title": "Nscale–Microsoft contract (Sines ~12,600 GB300)",
     "date": "2025-10-15",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/start-campus-increases-power-capacity-for-sines-dc-in-lisbon-portugal-to-12gw/",
     "title": "DCD: Start Campus increases Sines DC to 1.2GW",
     "date": "2024-08-08",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterfrontier.com/colocation/article/55133589/fresh-start-sines-dc-eyes-sustainable-12-gw-it-capacity-as-europes-largest-colocation-campus",
     "note": "Data Center Frontier confirms Start Campus Sines DC's total planned capacity at 1.2GW (SIN01 26MW + SIN02-06 ~240MW each) with SIN01 already operational, matching the row's mw_planned=1200, mw_operational=26 and status=operating; Sines, Por"
    }
   ],
   "verified": true
  },
  {
   "name": "YTL Green Data Center Park (Kulai) incl. YTL AI Cloud",
   "operator": "YTL Power International / YTL Data Center Holdings",
   "tenant": "Sea Ltd (72 MW anchor); YTL AI Cloud (Nvidia GB200 NVL72); others",
   "city": "Kulai",
   "region": "Johor",
   "country": "Malaysia",
   "lat": 1.657,
   "lng": 103.6,
   "coord_precision": "town",
   "mw_planned": 1200,
   "mw_operational": 150,
   "status": "operating",
   "timeline": "Ground broken Aug 2022 (500 MW park, RM1.5bn phase 1 72 MW, Sea DC done 2024); Nvidia AI DC commissioned Oct 2025; park described as 600 MW (2025) and 'up to 1.2 GW' (Aug 2026)",
   "capex_usd_b": 4.3,
   "power_notes": "Co-located 500 MW solar plant plus 600 MW TNB grid supply; 1,640-acre / 275-acre figures cited for park",
   "chips_notes": "Nvidia GB200 NVL72 liquid-cooled racks (YTL AI Cloud); unit count not disclosed",
   "notes": "Operational MW not disclosed: Sea building (72 MW) plus Nvidia AI facility are live. Capex shown is the DCD-reported $4.3bn YTL-Nvidia program; total park capex not published.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.mida.gov.my/media-release/ytl-data-centers-and-sea-break-ground-with-the-rm1-5bil-first-phase-of-the-500mw-ytl-green-data-center-park-in-johor/",
     "title": "MIDA: YTL Data Centers and Sea break ground on 500MW YTL Green Data Center Park",
     "date": "2022-08-25",
     "tier": 1
    },
    {
     "url": "https://www.edgeprop.my/content/1914263/ytl-power-completes-first-nvidia-powered-ai-data-centre-johor-ytl-ai-cloud-now-operational",
     "title": "YTL Power completes first Nvidia-powered AI data centre in Johor (600 MW park, GB200)",
     "date": "2025-10-31",
     "tier": 2
    },
    {
     "url": "https://w.media/ytl-power-and-jland-to-partner-to-build-up-to-1-5gw-data-center-in-johor/",
     "title": "YTL Power and JLand to partner to build up to 1.5GW data center in Johor (Kulai up to 1.2 GW)",
     "date": "2026-08-20",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/nvidia-ytl-power-partner-for-43bn-ai-data-centers-in-malaysia/",
     "title": "Nvidia & YTL Power partner for $4.3bn AI data centers in Malaysia",
     "date": "2023-12",
     "tier": 2
    }
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://www.thestar.com.my/business/business-news/2026/06/29/ytl-power-stamping-its-mark-on-dc-sector",
     "note": "Confirmed via direct fetch: The Star (Malaysia, Jun 29 2026) reports delivered/operational capacity at Kulai reached 150MW (up from 110MW the prior quarter) against a doubled 1.2GW target, so mw_operational should be updated from null to 15"
    }
   ],
   "verified": true
  },
  {
   "name": "Brookfield / NextEra Paducah AI Campus",
   "operator": "Brookfield (developer/operator)",
   "tenant": "NextEra Energy (dedicated generation partner)",
   "city": "Paducah (former DOE Paducah Gaseous Diffusion Plant)",
   "region": "Kentucky",
   "country": "USA",
   "lat": 37.101,
   "lng": -88.8203,
   "coord_precision": "site",
   "mw_planned": 1200,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Announced Jul 29, 2026; construction completion targeted 2031; full build-out by 2032",
   "capex_usd_b": 100,
   "power_notes": "Up to 2GW new natural-gas generation plus up to 2.6GW battery storage (4.6GW total generation) to deliver up to 1.8GW utility-delivered capacity supporting 1.2GW+ IT compute load; served via Big Rivers Electric Corp / Jackson Purchase Energy Cooperative with Paducah Power System support",
   "chips_notes": null,
   "notes": "3,556-acre former DOE Paducah Gaseous Diffusion Plant (uranium enrichment) site in western Kentucky; second former DOE nuclear-enrichment site (after Piketon, OH) repurposed for an AI mega-campus in 2026.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterknowledge.com/data-center-construction/brookfield-nextera-launch-100b-ai-campus-at-doe-s-paducah-site",
     "title": "Brookfield, NextEra Launch $100B AI Campus at DOE's Kentucky Site",
     "date": "2026-07-29",
     "tier": 2
    },
    {
     "url": "https://www.powermag.com/brookfield-nextera-to-develop-100b-data-center-campus-at-does-paducah-site-paired-with-4-6-gw-of-dedicated-generation/",
     "title": "Brookfield, NextEra to Develop $100B Data Center Campus at DOE's Paducah Site",
     "date": "2026-07-29",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Project Marvel (Logistics Land Investments / TPA Group)",
   "operator": "Logistics Land Investments LLC (TPA Group)",
   "tenant": "Undisclosed",
   "city": "Bessemer",
   "region": "Alabama",
   "country": "USA",
   "lat": 33.4018,
   "lng": -86.9544,
   "coord_precision": "town",
   "mw_planned": 1200,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "$14-14.5B, 18 buildings on ~700 acres; council approved 5-2 Nov 18, 2025; revised plan Feb 2026; ~900 additional acres rezoned Apr 21, 2026 (campus ~1,600 acres); ongoing community opposition",
   "capex_usd_b": 14.5,
   "power_notes": "Alabama Power; 1 GW",
   "chips_notes": "Not disclosed",
   "notes": "",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/project-marvel-data-center-could-come-to-bessemer-alabama/",
     "title": "'Project Marvel' data center could come to Bessemer, Alabama",
     "date": "2025",
     "tier": 2
    },
    {
     "url": "https://www.waff.com/2026/02/18/alabama-data-centers-multiply-artificial-intelligence-fuels-growth/",
     "title": "WAFF - Alabama data centers multiply as AI fuels growth ($14B, 1 GW)",
     "date": "2026-02-18",
     "tier": 3
    },
    {
     "url": "https://www.wbrc.com/2026/04/22/this-project-feels-like-an-invasion-bessemer-council-approves-major-data-center-rezoning-amid-community-divide/",
     "title": "WBRC - Bessemer council approves major data center rezoning (~900 acres)",
     "date": "2026-04-22",
     "tier": 3
    }
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/alabamas-planned-14bn-project-marvel-data-center-could-double-in-size/",
     "note": "DCD reports Project Marvel's full build-out capacity as 1.2GW rather than 1,000MW, while location, capex, and rezoning history are otherwise confirmed as announced (no groundbreaking yet)."
    }
   ],
   "verified": true
  },
  {
   "name": "EdgeCore Louisa County Campus",
   "operator": "EdgeCore Digital Infrastructure",
   "tenant": null,
   "city": "Louisa County (Shannon Hill Regional Business Park)",
   "region": "Virginia",
   "country": "USA",
   "lat": 37.95,
   "lng": -77.92,
   "coord_precision": "site",
   "mw_planned": 1100,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Announced 2025; phased build over several years depending on customer demand",
   "capex_usd_b": 17,
   "power_notes": "697 acres (~$42M land purchase) for ~3.9-4M sq ft; powered by Rappahannock Electric Cooperative; closed-loop air-cooled system; brings EdgeCore's total Virginia portfolio to 1.6GW+",
   "chips_notes": null,
   "notes": "Distinct from EdgeCore's existing Culpeper Tech Zone and Loudoun County campuses (already tracked in this dataset).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://edgecore.com/new-louisa-county-virginia-data-center-campus/",
     "title": "EdgeCore Digital Infrastructure Announces Plans to Invest $17B+ in Louisa County, VA",
     "date": "2025-06-25",
     "tier": 1
    },
    {
     "url": "https://www.bisnow.com/national/news/data-center/17b-campus-continues-data-center-surge-in-small-virginia-county-129918",
     "title": "New $17B Project Continues Data Center Surge In Small Virginia County",
     "date": "2025",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Meta El Paso ('Project Seafox')",
   "operator": "Meta / BlackRock JV (BlackRock funds 80%, Meta 20%)",
   "tenant": "Meta",
   "city": "El Paso",
   "region": "Texas",
   "country": "USA",
   "lat": 31.92,
   "lng": -106.36,
   "coord_precision": "town",
   "mw_planned": 1000,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Groundbreaking Oct 2025; construction began Nov 2025; 366 MW on-site gas online by 2027; capacity begins coming online 2028 (CNBC/JV); 12-building expansion filing completion Feb 2029",
   "capex_usd_b": 10,
   "power_notes": "El Paso Electric; 366 MW behind-the-meter from 813 modular gas generators (~$473M) for initial ~5-year bridge off-grid; Meta says 100% matched with renewables and 5,000+ MW clean energy under contract in Texas",
   "chips_notes": "Not disclosed",
   "notes": "Meta capex commitment raised from $1.5B to >$10B (Mar 2026); JV total development cost reported at $14B (w.media, tier 3). Address 7001 Stan Roberts Sr Ave, NE El Paso; ~600 acres, 1.2M sq ft initial.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/",
     "title": "Breaking Ground on Our New AI-Optimized Data Center in El Paso",
     "date": "2026-03-26",
     "tier": 1
    },
    {
     "url": "https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html",
     "title": "Meta to spend $10 billion on AI data center in El Paso, 1GW by 2028",
     "date": "2026-03-26",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/meta-to-deploy-366mw-of-modular-gas-units-to-power-1gw-data-center-in-el-paso-texas/",
     "title": "Meta to deploy 366MW of modular gas units to power 1GW data center in El Paso",
     "date": "2026-02-23",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/meta-files-to-expand-campus-in-el-paso-texas-with-12-new-buildings/",
     "title": "Meta files to expand campus in El Paso with 12 new buildings",
     "date": "2026-04-21",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 1,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/",
     "note": "Meta's own July 2026 press release confirms the Meta/BlackRock JV (BlackRock 80%/Meta 20%) for a 1GW 'Project Seafox' campus in Northeast El Paso, TX, under construction with capacity coming online starting 2028, matching mw_planned=1000, m"
    }
   ],
   "verified": true
  },
  {
   "name": "Stargate UAE (UAE–US AI Campus, Phase 1)",
   "operator": "Khazna Data Centers (G42)",
   "tenant": "OpenAI / Oracle (operators); NVIDIA, Cisco, SoftBank partners",
   "city": "Abu Dhabi",
   "region": "Abu Dhabi Emirate",
   "country": "United Arab Emirates",
   "lat": 24.4539,
   "lng": 54.3773,
   "coord_precision": "town",
   "mw_planned": 1000,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Announced May 2025; first 200MW targeted Q3 2026 (as of Dec 2025); full 1GW within ~3 years of Oct 2025; sits inside a 5GW / 10 sq mi UAE–US AI Campus",
   "capex_usd_b": null,
   "power_notes": "Campus to be powered by nuclear, solar and natural gas (G42). No utility/PPA detail disclosed.",
   "chips_notes": "NVIDIA Grace Blackwell GB300 systems; G42 approved to buy up to 35,000 GB300 chips, operating 'a couple of thousand' as of Dec 2025 (The National)",
   "notes": "Exact site within Abu Dhabi not published; plotted at city centroid. Dec 2025: 5,000+ workers, 100,000+ m3 concrete poured. Energization of first 200MW not confirmed by a primary source as of 2026-09-01.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.g42.ai/resources/news/global-tech-alliance-launches-stargate-uae",
     "title": "G42: Global tech alliance launches Stargate UAE",
     "date": "2025-05-22",
     "tier": 1
    },
    {
     "url": "https://www.prnewswire.com/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html",
     "title": "G42 provides update on construction of Stargate UAE",
     "date": "2025-10-16",
     "tier": 1
    },
    {
     "url": "https://www.thenationalnews.com/business/2025/12/05/stargate-uaes-first-phase-to-be-completed-in-third-quarter-of-2026/",
     "title": "The National: Stargate UAE first phase to be completed in Q3 2026",
     "date": "2025-12-05",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.prnewswire.com/news-releases/g42-provides-update-on-construction-of-stargate-uae-ai-infrastructure-cluster-302586430.html",
     "note": "G42's own press release and The National confirm Stargate UAE is under construction with the first 200MW phase targeted for Q3 2026 en route to 1GW, matching operator, location, and status."
    }
   ],
   "verified": true
  },
  {
   "name": "Brookfield / Data4 Cambrai (E-Valley) AI campus",
   "operator": "Data4 (Brookfield)",
   "tenant": "",
   "city": "Cambrai (former Cambrai-Épinoy airbase)",
   "region": "Hauts-de-France",
   "country": "France",
   "lat": 50.1758,
   "lng": 3.2346,
   "coord_precision": "town",
   "mw_planned": 1000,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Announced Feb 2025 (1GW); construction could begin 2026; Jun 2026 Brookfield raised France AI pledge to €30bn and described a 700MW 'AI factory' across Cambrai and Escaudain sites",
   "capex_usd_b": null,
   "power_notes": "Nuclear-heavy French grid; no PPA disclosed",
   "chips_notes": "Not disclosed",
   "notes": "1GW figure from Sept 2025 DCD; Jun 2026 700MW figure covers two sites. Brookfield France total €20bn→€30bn (€15bn via Data4) not entered as site capex.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/analysis/france-ai-data-center-build-out-emmanuel-macron/",
     "title": "DCD analysis: French AI data center build-out",
     "date": "2025-09-11",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/brookfield-ups-french-data-center-investment-by-10-billion/",
     "title": "DCD: Brookfield ups French data center investment by €10 billion",
     "date": "2026-06-02",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/brookfield-ups-french-data-center-investment-by-10-billion/",
     "note": "DCD confirms Data4/Brookfield's Cambrai E-Valley campus remains a real, still-announced 1GW project in Hauts-de-France, distinct from the newer 700MW Escaudain site."
    }
   ],
   "verified": true
  },
  {
   "name": "Fluidstack 1GW France AI supercomputer (Le Bosquel)",
   "operator": "Fluidstack",
   "tenant": "",
   "city": "Le Bosquel (Bosquel Business Park), Somme",
   "region": "Hauts-de-France",
   "country": "France",
   "lat": 49.79,
   "lng": 2.25,
   "coord_precision": "town",
   "mw_planned": 1000,
   "mw_operational": null,
   "status": "cancelled",
   "timeline": "MoU with French government Feb 2025; phase 1 €10bn, targeted operational 2026 scaling >1GW by 2028; Mar 2026 Bloomberg reported Fluidstack dropped its French projects to focus on the US",
   "capex_usd_b": 10.4,
   "power_notes": "Was to leverage French nuclear power",
   "chips_notes": "Planned ~500,000 next-generation AI chips in phase 1",
   "notes": "Capex is planned phase-1 figure, not spent. Status per Bloomberg report relayed by DCD; no company confirmation fetched.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.businesswire.com/news/home/20250210579531/en/Fluidstack-to-Build-1GW-AI-Supercomputer-in-France",
     "title": "Fluidstack to build 1GW AI supercomputer in France",
     "date": "2025-02-10",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/fluidstack-drops-projects-in-france-to-focus-on-us-report/",
     "title": "DCD: Fluidstack drops data center projects in France – report",
     "date": "2026-03-20",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/fluidstack-drops-projects-in-france-to-focus-on-us-report/",
     "note": "DCD and Bloomberg-sourced reporting confirm Fluidstack abandoned its 1GW Le Bosquel project in France around March 2026 to refocus on US partnerships, corroborating the 'cancelled' status."
    }
   ],
   "verified": true
  },
  {
   "name": "Google AI Hub Visakhapatnam (Rambilli / Adavivaram / Tarluwada)",
   "operator": "AdaniConneX (Adani-EdgeConneX JV) with Bharti Airtel (connectivity/CLS)",
   "tenant": "Google",
   "city": "Visakhapatnam",
   "region": "Andhra Pradesh",
   "country": "India",
   "lat": 17.6868,
   "lng": 83.2185,
   "coord_precision": "town",
   "mw_planned": 1000,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Announced 14 Oct 2025; foundation laid 28 Apr 2026; ~$15B over 2026-2030; first phase targeted late 2028 (Aug 2026 reports); full build ~5 years",
   "capex_usd_b": 15,
   "power_notes": "Google/Adani to co-invest in new transmission lines, clean-energy generation and storage in Andhra Pradesh; grid via APTRANSCO; 100% renewable claimed",
   "chips_notes": "Not disclosed (Google says infrastructure comparable to that behind Search/YouTube/Gemini, i.e., TPU-based)",
   "notes": "~600 acres across three sites (Rambilli, Adavivaram, Tarluwada); includes new subsea-cable landing station. 1 GW figure is from Andhra Pradesh government/press (Business Today, PeopleMatters); Google's own release says 'gigawatt-scale'.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://blog.google/intl/en-in/company-news/our-first-ai-hub-in-india-powered-by-a-15-billion-investment/",
     "title": "Google: Our first AI hub in India, powered by a $15 billion investment",
     "date": "2025-10-14",
     "tier": 1
    },
    {
     "url": "https://www.adani.com/newsroom/media-releases/adani-and-google-partner-to-build-indias-largest-data-centre-campus-in-visakhapatnam",
     "title": "Adani and Google partner to build India's largest data centre campus in Visakhapatnam",
     "date": "2025-10-14",
     "tier": 1
    },
    {
     "url": "https://www.businesstoday.in/technology/story/visakhapatnam-to-ai-patnam-googles-15-billion-blueprint-for-indias-ai-hub-528583-2026-05-03",
     "title": "Visakhapatnam to 'AI Patnam': Google's $15 billion blueprint (1 GW, 600 acres, foundation 28 Apr 2026)",
     "date": "2026-05-03",
     "tier": 2
    },
    {
     "url": "https://news.google.com/rss/search?q=Google+Visakhapatnam+data+centre+first+phase+2028&hl=en-IN&gl=IN&ceid=IN:en",
     "title": "Business Standard: 'Google eyes first phase of Vizag AI hub by 2028, full operations in 5 years' (via Google News index)",
     "date": "2026-08-27",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.businesstoday.in/technology/story/visakhapatnam-to-ai-patnam-googles-15-billion-blueprint-for-indias-ai-hub-528583-2026-05-03",
     "note": "Reporting confirms the AdaniConneX/Google 1GW, $15B Visakhapatnam AI hub with foundation laid April 28, 2026, matching operator, tenant, location, capacity, and status."
    }
   ],
   "verified": true
  },
  {
   "name": "Google southeast Nebraska proposal (Tenaska gas-powered)",
   "operator": "Google",
   "tenant": "Google",
   "city": "Southeast Nebraska (Gage/Lancaster/Cass/Otoe counties)",
   "region": "Nebraska",
   "country": "USA",
   "lat": 40.66,
   "lng": -96.5,
   "coord_precision": "town",
   "mw_planned": 1000,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Reported Mar 2026; Tenaska optioned 2,600+ acres; potentially operational by 2029, contingent on LB1261 private-generation legislation",
   "capex_usd_b": null,
   "power_notes": "1,000-3,000 MW demand; privately built natural gas plant by Tenaska connecting to public power grids",
   "chips_notes": "Not disclosed",
   "notes": "mw_planned uses the low end of the reported 1-3 GW range. Site not disclosed; coordinates are a regional centroid.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://journalstar.com/news/local/business/article_0dff8437-e761-4897-ba2e-fd3b8aab03ab.html",
     "title": "Google proposes Nebraska data center requiring more power than all of Lincoln (Lincoln Journal Star)",
     "date": "2026-03-13",
     "tier": 2
    },
    {
     "url": "https://flatwaterfreepress.org/google-proposes-nebraska-data-center-requiring-more-power-than-all-of-lincoln/",
     "title": "Flatwater Free Press - Google proposes Nebraska data center",
     "date": "2026-03-13",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://flatwaterfreepress.org/google-proposes-nebraska-data-center-requiring-more-power-than-all-of-lincoln/",
     "note": "Flatwater Free Press confirms Tenaska optioned 2,600+ acres across the named southeast Nebraska counties for a Google-linked gas-powered data center contingent on LB1261, matching the row's announced status and location."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Lebanon (LEAP District) AI campus",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Lebanon",
   "region": "Indiana",
   "country": "USA",
   "lat": 40.0484,
   "lng": -86.4692,
   "coord_precision": "town",
   "mw_planned": 1000,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Announced Feb 11, 2026; ~4M sq ft campus; construction began spring 2026; 4,000 construction jobs at peak",
   "capex_usd_b": 10,
   "power_notes": "Boone REMC/Wabash Valley Power Alliance; Meta covers full energy costs; 100% clean energy match; closed-loop liquid cooling",
   "chips_notes": "Not disclosed",
   "notes": "Meta's 27th US data center; second in Indiana.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
     "title": "Meta's New Data Center in Lebanon, Indiana Marks a Milestone AI Investment (1 GW, $10B+)",
     "date": "2026-02-11",
     "tier": 1
    },
    {
     "url": "https://datacenters.atmeta.com/2026/02/hello-lebanon/",
     "title": "Hello, Lebanon! - Meta Data Centers",
     "date": "2026-02-11",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/meta-announces-1gw-data-center-campus-in-indiana/",
     "title": "Meta announces 1GW data center campus in Indiana",
     "date": "2026-02",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
     "note": "Meta's own press release and DCD confirm a 1GW, $10B+ campus at the LEAP District in Lebanon, Indiana that broke ground February 11, 2026, matching operator, location, capacity, and under_construction status."
    }
   ],
   "verified": true
  },
  {
   "name": "Digital Realty Digital Dulles campus",
   "operator": "Digital Realty (with Blackstone JV on 4 buildings)",
   "tenant": "Multi-tenant hyperscale",
   "city": "Sterling, Loudoun County",
   "region": "Virginia",
   "country": "USA",
   "lat": 38.976,
   "lng": -77.444,
   "coord_precision": "site",
   "mw_planned": 1000,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Land (former MWAA 'Western Lands', 425 acres) bought 2018 for $236.5M; plans filed 2020 (7.5M sq ft, later 11.7M sq ft, 14 buildings, 6 substations); first building completed 2023; 2026 USACE application for two more buildings and substation relocation",
   "capex_usd_b": null,
   "power_notes": "Dominion Energy (PJM); six planned on-campus substations",
   "chips_notes": "",
   "notes": "Up to 1 GW per DCD (fetched via search summary). Billed as the world's largest multi-tenant campus at full build.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/digital-realty-files-to-expand-digital-dulles-campus-in-northern-virginia/",
     "title": "Digital Realty files to expand Digital Dulles campus in Northern Virginia",
     "date": "2026",
     "tier": 2
    },
    {
     "url": "https://www.datacenterfrontier.com/cloud/article/11429999/dulles-land-buy-gives-digital-realty-runway-for-data-center-expansion",
     "title": "Dulles Land Buy Gives Digital Realty Runway for Data Center Expansion",
     "date": "2018",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/digital-realty-files-to-expand-digital-dulles-campus-in-northern-virginia/",
     "note": "DCD confirms Digital Dulles is planned for up to 1GW across 14 buildings with a 2026 USACE filing for two more buildings, matching the row's operator, location, and under_construction status."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Prometheus",
   "operator": "Meta",
   "tenant": null,
   "city": "New Albany",
   "region": "Ohio",
   "country": "USA",
   "lat": 40.0817,
   "lng": -82.8088,
   "coord_precision": "site",
   "mw_planned": 1000,
   "mw_operational": 500,
   "status": "under_construction",
   "timeline": "Zuckerberg said Prometheus will come online in 2026; Socrates South (200MW behind-the-meter gas gen) supporting early load",
   "capex_usd_b": null,
   "power_notes": "$1.6B on-site natural-gas power system and pipeline built with The Williams Companies; Socrates South is a 200MW behind-the-meter gas facility; nuclear PPAs signed with TerraPower, Oklo and Vistra",
   "chips_notes": null,
   "notes": "1500 Beech Road, New Albany, OH. Billed as the first privately funded 1GW+ single-site AI data center. Part of the same Central Ohio hyperscale hub as AWS New Albany and Vantage Silicon Heartland (both already tracked in this dataset).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.nbc4i.com/news/local-news/new-albany/meet-prometheus-worlds-highest-capacity-data-center-slated-to-open-in-ohio-in-2026/",
     "title": "Meet Prometheus: World's highest capacity data center slated to open in Ohio in 2026",
     "date": "2026",
     "tier": 2
    },
    {
     "url": "https://www.wosu.org/2026-01-09/meta-secures-supply-of-nuclear-power-to-energize-ai-data-centers-including-one-in-new-albany",
     "title": "Meta secures supply of nuclear power to energize AI data centers, including one in New Albany",
     "date": "2026-01-09",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Meta Sturgeon County Data Center",
   "operator": "Meta",
   "tenant": null,
   "city": "Sturgeon County",
   "region": "Alberta",
   "country": "Canada",
   "lat": 53.8,
   "lng": -113.35,
   "coord_precision": "town",
   "mw_planned": 1000,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Groundbreaking Jul 6-8, 2026; scalable to 1.8GW over time",
   "capex_usd_b": 9.17,
   "power_notes": "Targets 100% clean/renewable energy; closed-loop liquid cooling designed to require no operational cooling water; Meta funding new grid-generation connection and ~CAD $60M in local infrastructure",
   "chips_notes": null,
   "notes": "Meta's first Canadian data center and its 33rd globally (~CAD $13B investment). Distinct from the paused O'Leary Ventures 'Wonder Valley' project in Greenview, Alberta (already tracked) -- different operator and location.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://about.fb.com/news/2026/07/breaking-ground-on-metas-first-data-center-in-canada/",
     "title": "Breaking Ground on Meta's First Data Center in Canada",
     "date": "2026-07-08",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/meta-plans-917bn-gigawatt-scale-data-center-in-alberta-canada/",
     "title": "Meta plans $9.17bn gigawatt-scale data center in Alberta, Canada",
     "date": "2026-07",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "QTS / Lancium Hall County Campus",
   "operator": "QTS Data Centers (Blackstone)",
   "tenant": null,
   "city": "Hall County (near Turkey; Lancium 'Clean Campus')",
   "region": "Texas",
   "country": "USA",
   "lat": 34.3987,
   "lng": -100.8909,
   "coord_precision": "town",
   "mw_planned": 1000,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Announced Jul 15, 2026",
   "capex_usd_b": 10,
   "power_notes": "Up to 11 data-center buildings on ~465 acres of Lancium's 'Clean Campus'; anchored by a 1GW grid interconnection; Lancium develops electrical/civil site infrastructure while QTS designs, builds and operates the data centers",
   "chips_notes": null,
   "notes": "CoreWeave/Lancium partnership on NVIDIA GPU clusters is a separate but related Lancium initiative.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/qts-to-build-11-data-centers-on-lancium-campus-in-hall-county-texas/",
     "title": "QTS to build 11 data centers on Lancium campus in Hall County, Texas",
     "date": "2026-07-15",
     "tier": 2
    },
    {
     "url": "https://abc7amarillo.com/news/local/10-billion-data-center-campus-planned-near-turkey-in-hall-county-lancium",
     "title": "$10 billion data center campus planned near Turkey in Hall County",
     "date": "2026-07",
     "tier": 3
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Vantage Lighthouse (Stargate Wisconsin)",
   "operator": "Vantage Data Centers",
   "tenant": "Oracle / OpenAI (Stargate)",
   "city": "Port Washington",
   "region": "Wisconsin",
   "country": "USA",
   "lat": 43.3872,
   "lng": -87.8756,
   "coord_precision": "town",
   "mw_planned": 902,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Announced Oct 22, 2025; groundbreaking Dec 2025; Phase 1 ($8B) completion 2028; four single-story buildings, 2.5M sq ft on 672 acres",
   "capex_usd_b": 15,
   "power_notes": "We Energies; PSC Wisconsin Very Large Customer tariff; ~$1.4B transmission proposed; 70% zero-emission (solar/wind/storage), 100% renewable match; Oracle expects >$7B letter of credit under PSC rules",
   "chips_notes": "Not disclosed",
   "notes": "Oracle-leased campus feeding OpenAI's Stargate program.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin",
     "title": "Vantage - Port Washington (Lighthouse) 902 MW",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/",
     "title": "OpenAI, Oracle and Vantage announce Stargate site in Wisconsin",
     "date": "2025-10-22",
     "tier": 1
    },
    {
     "url": "https://www.datacenterknowledge.com/data-center-construction/vantage-breaks-ground-on-15b-stargate-campus-in-wisconsin",
     "title": "Vantage Breaks Ground on $15B Stargate Campus in Wisconsin",
     "date": "2025-12-22",
     "tier": 2
    },
    {
     "url": "https://www.theregister.com/ai-and-ml/2026/07/21/oracle-faces-100m-annual-bill-to-back-wisconsin-datacenter-power-promises/5275728",
     "title": "Oracle faces $100M annual bill to back Wisconsin datacenter power promises",
     "date": "2026-07-21",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin",
     "note": "Vantage's own site and Data Center Knowledge confirm the exact 902MW figure across four buildings in Port Washington, WI, which broke ground in December 2025 under the Oracle/OpenAI Stargate branding."
    }
   ],
   "verified": true
  },
  {
   "name": "Project Sail (Atlas Development / Prologis)",
   "operator": "Atlas Development LLC (Prologis)",
   "tenant": "Undisclosed",
   "city": "Newnan (Coweta County)",
   "region": "Georgia",
   "country": "USA",
   "lat": 33.3807,
   "lng": -84.7997,
   "coord_precision": "town",
   "mw_planned": 900,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "829-832 acres at Sargent Rd/Wagers Mill Rd; rezoning approved 3-2 on Apr 7, 2026; nine buildings, 4.34M sq ft; residents sued May 2026; no tenant or start date confirmed",
   "capex_usd_b": 17,
   "power_notes": "Georgia Power (Plant Yates nearby); up to 900 MW",
   "chips_notes": "Not disclosed",
   "notes": "Fox 5 Atlanta reported $1.7B; AJC and ConstructConnect report $17B (used).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/prologis-900mw-project-sail-gets-the-go-ahead-in-coweta-county-georgia/",
     "title": "Prologis' 900MW 'Project Sail' gets the go-ahead in Coweta County, Georgia",
     "date": "2026-04",
     "tier": 2
    },
    {
     "url": "https://www.ajc.com/business/2026/04/coweta-votes-to-turn-this-800-acre-forest-into-17b-data-center-campus/",
     "title": "AJC - $17B 'Project Sail' data center approved south of Atlanta",
     "date": "2026-04",
     "tier": 2
    },
    {
     "url": "https://www.fox5atlanta.com/news/coweta-county-approves-massive-project-sail-data-center",
     "title": "Fox 5 - Coweta County approves massive 'Project Sail' data center",
     "date": "2026-04-08",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/prologis-900mw-project-sail-gets-the-go-ahead-in-coweta-county-georgia/",
     "note": "DCD and the Atlanta Journal-Constitution confirm the 900MW Atlas Development/Prologis project near Newnan, Coweta County was rezoned 3-2 on April 7, 2026, with no tenant yet confirmed."
    }
   ],
   "verified": true
  },
  {
   "name": "AWS New Albany / Central Ohio campus",
   "operator": "Amazon Web Services",
   "tenant": "",
   "city": "New Albany, Licking County",
   "region": "Ohio",
   "country": "USA",
   "lat": 40.1,
   "lng": -82.78,
   "coord_precision": "town",
   "mw_planned": 854,
   "mw_operational": 562,
   "status": "operating",
   "timeline": "Operating in New Albany for over a decade (US East Ohio region since 2016); 2023 deal for $3.5B expansion adding five buildings/1.25M sq ft technical space; $7.8B additional statewide investment announced.",
   "capex_usd_b": 3.5,
   "power_notes": "AEP Ohio (PJM); AEP data-center tariff (85% minimum demand) adopted 2025.",
   "chips_notes": "Not disclosed in fetched sources.",
   "notes": "capex = New Albany expansion only; $7.8B statewide figure covers other Central Ohio counties. MW not disclosed in tier-1/2 sources fetched. Primary Amazon/Ohio Governor releases could not be fetched (guessed URLs 404).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/ohio-regulators-approve-construction-of-200mw-gas-power-plant-to-serve-meta-data-center-in-new-albany-ohio/",
     "title": "Ohio regulators approve construction of 200MW gas power plant to serve Meta data center in New Albany",
     "date": "2025-06-10",
     "tier": 2
    },
    {
     "url": "https://www.nbc4i.com/news/local-news/new-albany/meet-prometheus-worlds-highest-capacity-data-center-slated-to-open-in-ohio-in-2026/",
     "title": "Meet Prometheus: World's highest capacity data center slated to open in Ohio in 2026",
     "date": "2025-09-23",
     "tier": 3
    },
    {
     "url": "https://www.datacenterfrontier.com/site-selection/article/33035576/data-centers-are-booming-in-ohios-digital-heartland",
     "title": "Data Centers Are Booming In Ohio's Digital Heartland",
     "date": "2024-01-31",
     "tier": 2
    },
    {
     "url": "https://www.datacenterfrontier.com/site-selection/article/55091801/vantage-data-centers-augments-new-albany-ohio-data-center-boom",
     "title": "Vantage Data Centers Augments New Albany, Ohio Data Center Boom",
     "date": "2024-07-12",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-to-build-420m-data-center-in-new-albany-ohio/",
     "title": "Microsoft to build $420m data center in New Albany, Ohio",
     "date": "2024-10-07",
     "tier": 2
    },
    {
     "url": "https://www.enr.com/articles/59633-microsoft-announces-1b-ohio-data-center-spend-despite-utility-tariffs",
     "title": "Microsoft Announces $1B Ohio Data Center Spend, Despite Utility Tariffs",
     "date": "2024-10-30",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-backs-away-from-1bn-data-center-plans-in-licking-county-ohio/",
     "title": "Microsoft pauses $1bn data center plans in Licking County, Ohio",
     "date": "2025-04-07",
     "tier": 2
    },
    {
     "url": "https://www.nbc4i.com/news/local-news/licking-county/microsoft-breaks-ground-on-two-licking-county-data-centers/",
     "title": "Microsoft breaks ground on two Licking County data centers",
     "date": "2026-03-04",
     "tier": 3
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": false,
     "evidence_url": "https://epoch.ai/data/ai-data-centers/directory/meta-prometheus",
     "note": "Epoch AI directory (originating research firm, tier 1; updated Sep 1 2026) shows Meta Prometheus (New Albany) with buildings 1-12 operational: 562 MW IT power as of Aug 1 2026 (phases Oct 2025, Jan 2026, May 2026, Aug 2026), projected 854 MW IT by Q1 2027 (value_type=estimate; Meta itself publicly d"
    },
    {
     "lens": "existence+capacity",
     "ok": false,
     "evidence_url": "https://epoch.ai/data/ai-data-centers/directory/google-new-albany",
     "note": "DCF (tier 2, Jan 2024) confirms $600M original + $1.7B trio = $2.3B announced building investment. Epoch AI (tier 1 research, updated Sep 1 2026) tracks Google New Albany at 453 MW IT power operational as of Aug 16 2026 across five buildings (B1 Apr 2024 … B5 Aug 2026), no further expansion listed; "
    },
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://www.datacenterfrontier.com/site-selection/article/33035576/data-centers-are-booming-in-ohios-digital-heartland",
     "note": "Data Center Frontier (tier 2, Jan 31 2024) confirms $3.5B expansion adding five buildings/1.25M sq ft technical space and an additional $7.8B potential statewide; no MW disclosed anywhere retrievable, so null is correct. capex 3.5 is the 2023 expansion only, not cumulative campus spend. No Epoch ent"
    },
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/microsoft-to-build-420m-data-center-in-new-albany-ohio/",
     "note": "DCD (tier 2, Oct 7 2024): $420M, 245,000 sq ft, 200 acres between Beech Rd and county line, construction was to start Jul 2025, completion end-2027, 15-yr abatement. DCD (Apr 8 2025) confirms pause of all three Licking County sites. The 'resumed early 2026 / active site prep' claim rests on NBC4i, w"
    }
   ],
   "verified": true,
   "corrected": true,
   "tier": "verified"
  },
  {
   "name": "PowerHouse Spotsylvania campus",
   "operator": "PowerHouse Data Centers",
   "tenant": "",
   "city": "Spotsylvania County",
   "region": "Virginia",
   "country": "USA",
   "lat": 38.2,
   "lng": -77.59,
   "coord_precision": "town",
   "mw_planned": 800,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Planned: up to eight three-story buildings, 3.5M sq ft on 145 acres.",
   "capex_usd_b": null,
   "power_notes": "Dominion (PJM).",
   "chips_notes": "",
   "notes": "From DCD's Virginia-beyond-Loudoun analysis (undated on page). Spotsylvania shows 0 operational / 7 pipeline sites in tier-3 tracker (Aug 2026).",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/analysis/the-future-of-virginia-post-loudoun/",
     "title": "The future of data centers in Virginia, post-Loudoun (DCD analysis)",
     "date": "",
     "tier": 2
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://www.datacenterdynamics.com/en/analysis/the-future-of-virginia-post-loudoun/",
     "note": "DCD (tier 2, Nov 4 2024) confirms PowerHouse 'developing an 800MW campus in Spotsylvania County', 145 acres, up to eight three-story buildings, 3.5M sq ft. No newer tier-1/2 status found; 'announced' stands. value_type=projection."
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "IREN Bundey AI data centre campus",
   "operator": "IREN Ltd",
   "tenant": "TBD (IREN has separate Microsoft GB300 cloud deal at Childress, Texas)",
   "city": "Bundey (near Robertstown)",
   "region": "South Australia",
   "country": "Australia",
   "lat": -33.87,
   "lng": 139.44,
   "coord_precision": "town",
   "mw_planned": 800,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Transmission connection agreement at Bundey hub announced 4 Jun 2026; energisation from 2028",
   "capex_usd_b": null,
   "power_notes": "ElectraNet Bundey transmission hub; SA targeting 100% net renewables by 2027",
   "chips_notes": "Not disclosed for this site; IREN has Nvidia agreement for up to 5 GW of AI infrastructure globally",
   "notes": "",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://w.media/iren-targets-bundey-transmission-hub-for-800mw-australian-data-centre-campus/",
     "title": "IREN targets Bundey transmission hub for 800MW Australian data centre campus",
     "date": "2026-06-04",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.iren.com/",
     "note": "IREN's own site lists Bundey, SA as an 800MW planned facility and the given coordinates fall within about 13km of Bundey's actual location, so despite the row's single tier-3 citation the core facts are independently confirmed."
    }
   ],
   "verified": true
  },
  {
   "name": "Nebius Kansas City Campus (Eastgate Commerce Center)",
   "operator": "Nebius",
   "tenant": null,
   "city": "Kansas City metro (Eastgate Commerce Center)",
   "region": "Missouri",
   "country": "USA",
   "lat": 39.0997,
   "lng": -94.5786,
   "coord_precision": "town",
   "mw_planned": 800,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Announced Jan 2026; first 250MW power phase targeted for completion Oct 2027",
   "capex_usd_b": null,
   "power_notes": "2.5M sq ft campus at the existing Eastgate Commerce Center; dedicated power plant to be built in phases",
   "chips_notes": null,
   "notes": "Distinct from Nebius's smaller, existing Patmos-leased Kansas City facility (1601 McGee St, ~40MW) which first put Nebius in the KC market in late 2024/2025.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/nebius-plans-800mw-data-center-campus-in-kansas-city-missouri/",
     "title": "Nebius plans 800MW data center campus outside Kansas City, Missouri",
     "date": "2026-01",
     "tier": 2
    },
    {
     "url": "https://nebius.com/newsroom/nebius-expands-in-us-with-first-gpu-cluster-in-kansas-city-offices-in-san-francisco-dallas-and-new-york",
     "title": "Nebius to build first NVIDIA GPU cluster in US; expands offices",
     "date": "2025",
     "tier": 1
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "CyrusOne Freestone Energy Center Campus",
   "operator": "CyrusOne",
   "tenant": null,
   "city": "Fairfield (Freestone County)",
   "region": "Texas",
   "country": "USA",
   "lat": 31.7241,
   "lng": -96.1613,
   "coord_precision": "town",
   "mw_planned": 760,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Construction underway on two of three permitted buildings; third building construction due to start shortly after; campus targeted complete by end of Aug 2027",
   "capex_usd_b": 1.5,
   "power_notes": "Co-located with Calpine's ~1GW Freestone gas-fired combined-cycle plant; Constellation agreement covers power, grid connectivity and site infrastructure",
   "chips_notes": null,
   "notes": "Part of a broader Constellation/CyrusOne arrangement reported at 1,100+ MW under contract across CyrusOne's Texas sites (including a separate, smaller Thad Hill Energy Center campus in Bosque County, TX not itemized here).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.constellationenergy.com/news/2026/02/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas.html",
     "title": "Constellation and CyrusOne Announce Agreement to Support New Data Center Facility at Freestone Energy Center in Texas",
     "date": "2026-02",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/cyrusone-files-to-develop-three-buildings-for-15bn-data-center-campus-in-fairfield-texas/",
     "title": "CyrusOne files to develop three buildings for $1.5bn data center campus in Fairfield, Texas",
     "date": "2026",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "TeraWulf Lake Mariner",
   "operator": "TeraWulf",
   "tenant": "Fluidstack (380 MW IT, Google credit backstop) and Core42 (60 MW)",
   "city": "Barker (Somerset)",
   "region": "New York",
   "country": "USA",
   "lat": 43.34,
   "lng": -78.556,
   "coord_precision": "town",
   "mw_planned": 750,
   "mw_operational": 102,
   "status": "operating",
   "timeline": "81 MW critical IT at Jun 30, 2026; CB-3 delivered early Jul 2026 -> 102 MW; CB-4 phased delivery H2 2026; CB-5 (160 MW) from early 2027; 336 MW under construction; 750 MW gross HPC leasing capacity at full buildout.",
   "capex_usd_b": null,
   "power_notes": "NYISO grid at former Somerset coal plant interconnection; build cost guidance $8-10M per critical IT MW; Google guarantees ~$3.2B of Fluidstack leases.",
   "chips_notes": "Not disclosed (Fluidstack GPU tenant).",
   "notes": "mw_planned is TeraWulf's stated 750 MW gross HPC leasing capacity; contracted critical IT ~440 MW. TeraWulf sold its 50.1% Abernathy TX JV (168 MW) for ~$530M (Aug 2026); separate ~401 MW Anthropic lease at Justified Data Campus, Kentucky (H2 2027).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results",
     "title": "TeraWulf Q2 2026 results",
     "date": "2026-08-05",
     "tier": 1
    },
    {
     "url": "https://investors.terawulf.com/news-events/press-releases/detail/132/terawulf-reports-fourth-quarter-and-full-year-2025-results",
     "title": "TeraWulf Q4 & FY2025 results",
     "date": "2026-02-26",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results",
     "note": "TeraWulf's own Q2 2026 and Q4 2025 press releases confirm the 750MW gross capacity, the Fluidstack (380MW) and Core42 (60MW) tenancy, and 102MW operational as of early July 2026, matching the row exactly."
    }
   ],
   "verified": true
  },
  {
   "name": "IREN Childress Campus",
   "operator": "IREN",
   "tenant": "Microsoft (200MW contracted)",
   "city": "Childress",
   "region": "Texas",
   "country": "USA",
   "lat": 34.4265,
   "lng": -100.2043,
   "coord_precision": "town",
   "mw_planned": 750,
   "mw_operational": 350,
   "status": "under_construction",
   "timeline": "Horizon 1 (50MW IT / ~75MW gross, direct-to-chip liquid cooled) energized Q4 2025; additional ~400MW under construction toward 750MW total",
   "capex_usd_b": null,
   "power_notes": "576-acre freehold site; direct ERCOT interconnection via on-site substations and a 345kV transmission line; 100% renewable-energy powered",
   "chips_notes": null,
   "notes": "Distinct from IREN's existing Sweetwater, TX campus (already tracked).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://iren.com/data-centers/childress",
     "title": "Childress Data Center",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://www.newschannel10.com/2026/05/18/iren-continues-developing-data-center-campus-childress/",
     "title": "IREN continues developing data center campus in Childress",
     "date": "2026-05-18",
     "tier": 3
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Jurong Island Green Data Centre Park",
   "operator": "JTC Corporation / Singapore EDB (government land; operators TBD)",
   "tenant": "TBD",
   "city": "Jurong Island",
   "region": "Singapore",
   "country": "Singapore",
   "lat": 1.266,
   "lng": 103.7,
   "coord_precision": "town",
   "mw_planned": 700,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Announced 27 Oct 2025 (up to 700 MW, 20 ha); NUS/JTC green DC testbed study from 2026; EDB reaffirmed Aug 2026; no build dates",
   "capex_usd_b": null,
   "power_notes": "Low-carbon focus: biomethane import pilot, hydrogen-ready; separate Aug-2026 DC-CFA allocated 200 MW to Digital Realty, Equinix, Keppel, STT GDC (50 MW each)",
   "chips_notes": "Not disclosed",
   "notes": "Singapore's only GW-adjacent new-build program; 10% of park land reserved for new-energy uses. No hyperscaler-named AI campus with MW exists in Singapore beyond CFA allocations.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://news.google.com/rss/search?q=Jurong+Island+green+data+centre+park+700MW&hl=en-SG&gl=SG&ceid=SG:en",
     "title": "The Business Times: 'Singapore to build 700MW data centre park on Jurong Island' and EDB Aug-2026 update (via Google News index)",
     "date": "2025-10-27",
     "tier": 2
    },
    {
     "url": "https://w.media/?s=Jurong+Island+data+centre",
     "title": "W.Media: Singapore mulls allocating land on Jurong Island for data center park up to 700 MW; DC-CFA2 50 MW awards",
     "date": "2025-10-27",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/singapore-to-host-700mw-data-center-park-on-jurong-island/",
     "note": "DCD confirms the roughly 700MW, ~20-hectare Jurong Island green data centre park was announced October 27, 2025 with no operator yet selected, matching the row's announced/TBD framing despite its own invalid aggregator/search-page sources."
    }
   ],
   "verified": true
  },
  {
   "name": "Google Project Mica (Kansas City Northland)",
   "operator": "Google",
   "tenant": null,
   "city": "Kansas City (Northland, I-435/US-169 interchange)",
   "region": "Missouri",
   "country": "USA",
   "lat": 39.228,
   "lng": -94.575,
   "coord_precision": "site",
   "mw_planned": 700,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Construction began Feb 2026",
   "capex_usd_b": null,
   "power_notes": "500-acre site, five data centers totaling ~1.56M sq ft; received $10B taxable revenue bond authorization from Port KC in Jul 2025; power partly via Evergy/Ranger Power/DESRI carbon-free PPA capacity",
   "chips_notes": null,
   "notes": "Google's second Kansas City-metro campus; the first, a ~$1B facility near Worlds of Fun/Hunt Midwest Business Center, broke ground in March 2024 and remains under construction but is not separately itemized here due to the row cap.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/construction-begins-at-googles-second-data-center-campus-in-kansas-city-missouri/",
     "title": "Construction begins at Google's second data center campus in Kansas City, Missouri",
     "date": "2026",
     "tier": 2
    },
    {
     "url": "https://www.kshb.com/news/local-news/missouri/kansas-city/google-announces-construction-underway-for-second-data-center-campus-in-kansas-city",
     "title": "Google announces construction underway for second data center campus in Kansas City",
     "date": "2026",
     "tier": 3
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Switch The Citadel Campus (Tahoe Reno)",
   "operator": "Switch",
   "tenant": "Multi-tenant colocation (enterprise, cloud, AI)",
   "city": "McCarran / Tahoe Reno Industrial Center (Storey County)",
   "region": "Nevada",
   "country": "USA",
   "lat": 39.55,
   "lng": -119.45,
   "coord_precision": "town",
   "mw_planned": 650,
   "mw_operational": null,
   "status": "operating",
   "timeline": "TAHOE RENO 1 opened 2017 (up to 1.3M sq ft, up to 130 MW); TR2/TR3 construction announced 2020; campus up to 7.2M sq ft / 650 MW at full build",
   "capex_usd_b": null,
   "power_notes": "NV Energy; Switch claims 100% renewable incl. large behind-the-meter solar + storage",
   "chips_notes": "Not disclosed",
   "notes": "Operational MW not disclosed by Switch (TR1 rated 'up to 130 MW'). Adjacent to Tesla Gigafactory in TRIC.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.switch.com/switch-tahoe-reno-data-center-now-open/",
     "title": "Switch TAHOE RENO Now Open",
     "date": "2017",
     "tier": 1
    },
    {
     "url": "https://www.switch.com/switch-breaks-ground-on-second-and-third-tahoe-reno-data-centers-following-multi-megawatt-expansions-with-global-e-commerce-and-semiconductor-clients/",
     "title": "Switch Breaks Ground on Second and Third Tahoe Reno Data Centers",
     "date": "2020",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.switch.com/tahoe-reno/",
     "note": "Switch's own current Tahoe Reno page confirms the campus is open and describes 'gigawatts' of ultimate capacity, which is directionally consistent with, though less precise than, the row's 650MW figure sourced from Switch's original 2017/20"
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft Fairwater Atlanta (QTS Fayetteville)",
   "operator": "QTS (builder/landlord); Microsoft",
   "tenant": "Microsoft (likely OpenAI training per Epoch)",
   "city": "Fayetteville",
   "region": "Georgia",
   "country": "USA",
   "lat": 33.4487,
   "lng": -84.4549,
   "coord_precision": "town",
   "mw_planned": 636,
   "mw_operational": 636,
   "status": "operating",
   "timeline": "Buildings 1-2 operational Oct 2025 (announced Nov 12, 2025); Buildings 3-4 operational Jun 2026 (Epoch).",
   "capex_usd_b": 24.1,
   "power_notes": "Georgia Power grid-only design ('4x9 availability at 3x9 cost'); ~140 kW/rack. Capex is Epoch estimate.",
   "chips_notes": "Microsoft: 'hundreds of thousands' of GB200/GB300 GPUs; Epoch: ~304k B200 (~769k H100e).",
   "notes": "Second Fairwater site, linked to Wisconsin via AI WAN. Microsoft has named no further Fairwater sites in fetched sources.",
   "value_type": "estimate",
   "sources": [
    {
     "url": "https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-atlanta",
     "title": "Epoch AI - Microsoft Fairwater Atlanta",
     "date": "2026-09-01",
     "tier": 1
    },
    {
     "url": "https://blogs.microsoft.com/blog/2025/11/12/infinite-scale-the-architecture-behind-the-azure-ai-superfactory/",
     "title": "Microsoft - Infinite scale: the architecture behind the Azure AI superfactory",
     "date": "2025-11-12",
     "tier": 1
    },
    {
     "url": "https://www.constructconnect.com/construction-economic-news/ai-fueling-data-center-construction-boom-in-georgia",
     "title": "ConstructConnect - AI Fueling Data Center Construction Boom in Georgia",
     "date": "2025-02-17",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/project-excalibur-qts-planning-16-building-66-million-sq-ft-development-in-fayetteville-georgia/",
     "title": "Project Excalibur: QTS planning 16-building, 6.6 million sq ft development in Fayetteville",
     "date": "2022",
     "tier": 2
    }
   ],
   "verified": true,
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://blogs.microsoft.com/blog/2025/11/12/infinite-scale-the-architecture-behind-the-azure-ai-superfactory/",
     "note": "Microsoft's own blog and Epoch AI's tracker confirm the Fairwater Atlanta (QTS Fayetteville) site's 636MW capacity and full operational status as of June 2026, matching the row."
    }
   ],
   "tier": "verified"
  },
  {
   "name": "Project Blue (Beale Infrastructure)",
   "operator": "Beale Infrastructure (Blue Owl)",
   "tenant": "None confirmed (AWS withdrew; Meta reportedly in talks)",
   "city": "Tucson (Pima County)",
   "region": "Arizona",
   "country": "USA",
   "lat": 32.2226,
   "lng": -110.9747,
   "coord_precision": "town",
   "mw_planned": 600,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Tucson council rejected annexation 2025; ACC approved TEP power agreement Dec 2025 (4-1); developer targets online 2027, ramping to ~286 MW by 2028 (tier 3)",
   "capex_usd_b": null,
   "power_notes": "Tucson Electric Power; switched from reclaimed-water cooling to air cooling after water denial; ACC pledged 100% renewable matching",
   "chips_notes": "Not disclosed",
   "notes": "290 acres of Pima County land, up to 10 buildings / 2M sq ft. AWS exit reported Dec 2025; Beale says it never had a signed agreement. Coordinates are city center; site is SE Tucson.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/amazon-backs-out-of-project-blue-data-center-campus-in-arizona-report/",
     "title": "Amazon backs out of Project Blue data center campus in Arizona - report",
     "date": "2025-12-05",
     "tier": 2
    },
    {
     "url": "https://www.kjzz.org/the-show/2025-12-09/rejected-by-tucson-and-abandoned-by-amazon-project-blue-data-center-moves-forward",
     "title": "Rejected by Tucson and abandoned by Amazon, Project Blue moves forward",
     "date": "2025-12-09",
     "tier": 3
    }
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://tucson.com/news/local/subscriber/article_388dce5f-140e-474d-93b0-bb78d0aa9f57.html",
     "note": "The Arizona Daily Star and other Tucson outlets report active on-site construction at Project Blue since April 2026, so the row's 'announced' status is stale and should read under_construction, though the no-confirmed-tenant framing still h"
    }
   ],
   "verified": true
  },
  {
   "name": "Google West Memphis Data Center (Project Pyramid)",
   "operator": "Google",
   "tenant": null,
   "city": "West Memphis",
   "region": "Arkansas",
   "country": "USA",
   "lat": 35.1465,
   "lng": -90.1848,
   "coord_precision": "site",
   "mw_planned": 600,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Groundbreaking Oct 2, 2025 for the first ($4B) phase, running through 2027",
   "capex_usd_b": 4,
   "power_notes": "Supported by a 600MW solar project plus 350MW battery energy storage system in Jefferson County, AR; Entergy Arkansas to serve the campus",
   "chips_notes": null,
   "notes": "1,000-1,178 acre site south of Bollinger Rd, near the TN state line. Widely reported as a potential ~$10B eventual investment (described as the largest private investment in Arkansas history), though the initial committed phase is $4B through 2027.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.arkansasedc.com/news-events/newsroom/detail/2025/10/02/google-locating-new-data-center-in-west-memphis--arkansas-with-multi-billion-dollar-investment",
     "title": "Google Locating New Data Center in West Memphis, Arkansas with Multi-Billion Dollar Investment",
     "date": "2025-10-02",
     "tier": 1
    },
    {
     "url": "https://pv-magazine-usa.com/2025/10/03/arkansas-to-build-600-mw-solar-project-for-googles-4b-data-center/",
     "title": "Arkansas to build 600 MW solar project for Google's $4B data center",
     "date": "2025-10-03",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Vantage Ashburn campuses (VA1 / VA2 / VA3)",
   "operator": "Vantage Data Centers",
   "tenant": "Multi-tenant hyperscale",
   "city": "Ashburn, Loudoun County",
   "region": "Virginia",
   "country": "USA",
   "lat": 39.0437,
   "lng": -77.4875,
   "coord_precision": "town",
   "mw_planned": 590,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "VA1 (Ashburn I), not VA2, is the 206 MW / 6-building campus whose fifth building topped out (Jul 2025 per DCD); VA2 (Ashburn II, Sterling VA) is a separate ~96 MW / 3-building campus under construction; VA3 (134 acres, 7 buildings, 288 MW) is in development. Aggregate 590 MW across VA1+VA2+VA3 is confirmed correct.",
   "capex_usd_b": null,
   "power_notes": "Dominion Energy (PJM)",
   "chips_notes": "",
   "notes": "590 MW = combined Virginia portfolio per Vantage. Operational MW not broken out.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://vantage-dc.com/data-center-locations/north-america/ashburn-iii-virginia/",
     "title": "Vantage Ashburn III, Virginia Data Center Campus",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/vantage-tops-out-fifth-building-of-206mw-data-center-in-ashburn-virginia/",
     "title": "Vantage tops out fifth building of 206MW data center in Ashburn, Virginia",
     "date": "2025",
     "tier": 2
    }
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/vantage-tops-out-fifth-building-of-206mw-data-center-in-ashburn-virginia/",
     "note": "DCD's own article shows the 206MW/fifth-building-topped-out milestone belongs to VA1, not VA2 as the row's timeline states, though the aggregate 590MW total and under_construction status remain correct."
    }
   ],
   "verified": true
  },
  {
   "name": "Aligned Project Caprock",
   "operator": "Aligned Data Centers",
   "tenant": null,
   "city": "Hale County (near Abernathy)",
   "region": "Texas",
   "country": "USA",
   "lat": 33.8459,
   "lng": -101.846,
   "coord_precision": "town",
   "mw_planned": 540,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Broke ground Apr 2026; first building (LBB-01) targeted for service in Q1 2027",
   "capex_usd_b": null,
   "power_notes": "313-acre site, six planned buildings totaling ~1.65M sq ft; uses Aligned's proprietary DeltaFlow liquid-cooling technology; projected ~$5B regional economic impact",
   "chips_notes": null,
   "notes": "Near, but a separate project and operator from, the existing Fluidstack/Anthropic Abernathy (Hale County) entry already tracked in this dataset.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://markets.financialcontent.com/stocks/article/gnwcq-2026-4-9-aligned-data-centers-breaks-ground-on-project-caprock-a-sustainable-540-mw-next-generation-data-center-campus-in-northwest-texas",
     "title": "Aligned Data Centers Breaks Ground on 'Project Caprock,' a Sustainable 540 MW Data Center Campus in Northwest Texas",
     "date": "2026-04-09",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Stargate Norway – Kvandal (Narvik)",
   "operator": "Aker Nscale (50/50 JV of Nscale and Aker)",
   "tenant": "Microsoft is the confirmed tenant (contracted for Nvidia GPUs) after OpenAI withdrew as anchor offtaker around April 2026 without finalizing a capacity agreement at this site.",
   "city": "Kvandal, Narvik",
   "region": "Nordland",
   "country": "Norway",
   "lat": 68.4753,
   "lng": 17.4362,
   "coord_precision": "town",
   "mw_planned": 520,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Announced Jul 31, 2025; 230MW initial phase with 290MW expansion option; target 100,000 NVIDIA GPUs by end-2026; construction mobilization began 2025; no 2026 energization confirmed by primary source",
   "capex_usd_b": 1,
   "power_notes": "100% renewable, primarily hydropower; closed-loop direct-to-chip liquid cooling; Statnett grid",
   "chips_notes": "100,000 NVIDIA GPUs targeted by end-2026; Microsoft contract for ~52,000 GB300 at Narvik (multi-year)",
   "notes": "~$1B committed to initial phase incl. >$250M equity split equally. Site can scale 'tenfold' per DCD. Plotted at Kvandal village.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.nscale.com/press-releases/stargate-norway-nscale-aker-openai",
     "title": "Nscale, Aker and OpenAI to establish Stargate Norway",
     "date": "2025-07-31",
     "tier": 1
    },
    {
     "url": "https://www.nscale.com/press-releases/nscale-microsoft-2025",
     "title": "Nscale–Microsoft contract (Narvik ~52,000 GB300)",
     "date": "2025-10-15",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/openai-partners-with-nscale-and-aker-for-stargate-norway-data-center-with-100k-gpus/",
     "title": "DCD: OpenAI partners with Nscale and Aker for Stargate Norway",
     "date": "2025-07-31",
     "tier": 2
    }
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/nscale-secures-790m-in-financing-for-norway-data-center-project/",
     "note": "DCD's May 2026 financing coverage reports OpenAI pulled back from finalizing capacity at Kvandal/Narvik around April 2026 with Microsoft taking over as the confirmed tenant, reversing the row's OpenAI-as-initial-offtaker framing."
    }
   ],
   "verified": true
  },
  {
   "name": "Compass Datacenters Meridian campus",
   "operator": "Compass Datacenters",
   "tenant": "Single hyperscale tenant (undisclosed)",
   "city": "Meridian (Lauderdale County)",
   "region": "Mississippi",
   "country": "USA",
   "lat": 32.36,
   "lng": -88.7,
   "coord_precision": "town",
   "mw_planned": 500,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Announced Jan 2025; groundbreaking Feb 2025; 8 buildings over ~8 years; first building targeted 2026",
   "capex_usd_b": 10,
   "power_notes": "Mississippi Power (Southern Co.) ~500 MW",
   "chips_notes": "Not disclosed",
   "notes": "I-20/59 Industrial Park. $10B includes tenant IT equipment at full fit-out. Tier-3 lists 40 MW IT per building.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.compassdatacenters.com/news/compass-10b-investment-lauderdale-county-mississippi/",
     "title": "Compass Project Generates $10B Investment in Lauderdale County",
     "date": "2025-01-09",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/compass-to-invest-10-billion-in-mississippi-data-center-campus/",
     "title": "Compass to develop $10 billion data center campus in Mississippi",
     "date": "2025-01-09",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/compass-to-invest-10-billion-in-mississippi-data-center-campus/",
     "note": "DCD and Compass's own release confirm the $10B, 500MW, 8-building Meridian, Mississippi campus, and later 2026 coverage shows continued active progress consistent with under_construction."
    }
   ],
   "verified": true
  },
  {
   "name": "Eni–Khazna AI Data Center Campus, Ferrera Erbognone",
   "operator": "Eni–Khazna Data Centers JV (MGX/G42 framework)",
   "tenant": "",
   "city": "Ferrera Erbognone",
   "region": "Lombardy (Pavia)",
   "country": "Italy",
   "lat": 45.115,
   "lng": 8.865,
   "coord_precision": "town",
   "mw_planned": 500,
   "mw_operational": null,
   "status": "announced",
   "timeline": "LoI Feb 2025 (up to 1GW in two ~500MW phases); Heads of Terms Jul 11, 2025; EU merger clearance Aug 2026; development/construction over ~4 years",
   "capex_usd_b": null,
   "power_notes": "Eni 'blue power' from new high-efficiency gas plant with CO2 capture (Ravenna CCS hub)",
   "chips_notes": "Not disclosed",
   "notes": "Phase 1 = 500MW; total potential 1GW.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.eni.com/en-IT/media/press-release/2025/07/pr-khazna-data-centers-eni-partner-develop-i-data-center-campus.html",
     "title": "Eni: Khazna Data Centers and Eni partner to develop AI data center campus",
     "date": "2025-07-11",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/eni-partners-with-saudis-mgx-and-g42-to-develop-1gw-of-data-centers-in-italy/",
     "title": "DCD: Eni partners with MGX and G42 to develop 1GW in Italy",
     "date": "2025-02-24",
     "tier": 2
    },
    {
     "url": "https://en.ilsole24ore.com/art/data-centre-eu-gives-green-light-to-eni-khazna-joint-venture-lombardy-hub-to-be-accelerated-AJl2Zcj",
     "title": "Il Sole 24 Ore: EU green light to Eni-Khazna JV",
     "date": "2026-08-10",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.eni.com/en-IT/media/press-release/2025/07/pr-khazna-data-centers-eni-partner-develop-i-data-center-campus.html",
     "note": "Eni's own press release and DCD/EU sources confirm the 500MW Ferrera Erbognone campus and its EU merger clearance on August 10, 2026, matching the row exactly."
    }
   ],
   "verified": true
  },
  {
   "name": "Digital Edge GIIC Bekasi hyperscale campus",
   "operator": "Digital Edge (Stonepeak-backed)",
   "tenant": "Hyperscale/AI (undisclosed)",
   "city": "Bekasi (Cikarang / GIIC Deltamas)",
   "region": "West Java",
   "country": "Indonesia",
   "lat": -6.35,
   "lng": 107.16,
   "coord_precision": "town",
   "mw_planned": 500,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Announced 28 Jan 2026; phase 1 buildings: Q4 2026, Q1 2027, Q2 2027; 500 MW IT at full build, scalable to 1 GW",
   "capex_usd_b": 4.5,
   "power_notes": "PLN grid; renewable integration planned; PUE target 1.25; direct-to-chip liquid cooling",
   "chips_notes": "Not disclosed",
   "notes": "$325M credit facility Oct 2025.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterknowledge.com/data-center-construction/digital-edge-to-develop-500-mw-data-center-campus-in-indonesia",
     "title": "Digital Edge to Develop 500 MW Data Center Campus in Indonesia",
     "date": "2026-01-28",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterknowledge.com/data-center-construction/digital-edge-to-develop-500-mw-data-center-campus-in-indonesia",
     "note": "Data Center Knowledge and Digital Edge's own newsroom confirm the January 28, 2026 announcement of the $4.5B, 500MW Bekasi campus, with a May 2026 update showing Building 1 already topped out."
    }
   ],
   "verified": true
  },
  {
   "name": "Stargate Argentina (Sur Energy / OpenAI)",
   "operator": "Sur Energy (lead developer)",
   "tenant": "OpenAI (offtaker; Stargate)",
   "city": "Patagonia (site TBD; Neuquén/Río Negro/Chubut under evaluation)",
   "region": "Neuquén (placeholder)",
   "country": "Argentina",
   "lat": -38.95,
   "lng": -68.06,
   "coord_precision": "town",
   "mw_planned": 500,
   "mw_operational": 0,
   "status": "paused",
   "timeline": "LOI 10 Oct 2025 (up to 500 MW, US$25B under RIGI); reported plan: construction 2026, first 100 MW 2027; as of May 2026 project not yet submitted to government, no site chosen",
   "capex_usd_b": 25,
   "power_notes": "Renewable-powered (Patagonia wind/hydro); Central Puerto MoU to supply power (reported)",
   "chips_notes": "Not disclosed",
   "notes": "Included as the only Stargate-branded South American project; effectively stalled. Coordinates are a placeholder (Neuquén city).",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://w.media/stargate-argentina-openai-announces-us-25-billion-ai-dc-project-in-patagonia/",
     "title": "Stargate Argentina: OpenAI announces US$25 billion AI DC project in Patagonia (500 MW)",
     "date": "2025-10-14",
     "tier": 2
    },
    {
     "url": "https://batimes.com.ar/news/economy/chau-gpt-no-trace-of-mega-billion-dollar-ai-project-announced-before-elections.phtml",
     "title": "Buenos Aires Times: No trace of mega-billion-dollar AI project announced before elections",
     "date": "2026-05-28",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/openai-plans-500mw-data-center-in-argentina/",
     "title": "OpenAI plans 500MW data center in Argentina",
     "date": "2025-10",
     "tier": 2
    }
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://batimes.com.ar/news/economy/chau-gpt-no-trace-of-mega-billion-dollar-ai-project-announced-before-elections.phtml",
     "note": "Buenos Aires Times reports Argentina's own Economy Ministry confirmed as of May 2026 the project has not been formally presented and has no site, financing, or timeline nearly eight months after the LOI, so 'paused' better reflects its stal"
    }
   ],
   "verified": true
  },
  {
   "name": "DayOne Batam campuses (Nongsa Digital Park + Kabil KITP) incl. Firmus 360 MW AI Factory",
   "operator": "DayOne Data Centers",
   "tenant": "Firmus Technologies (360 MW Nvidia AI factory, 170k GPUs); cloud/AI hyperscalers",
   "city": "Batam",
   "region": "Riau Islands",
   "country": "Indonesia",
   "lat": 1.185,
   "lng": 104.09,
   "coord_precision": "town",
   "mw_planned": 450,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "450 MW (511 MVA) PPA with PLN Batam signed Apr 2026, power delivered in phases 2026-2027; Firmus-Nvidia 360 MW campus announced Jun 2026, accelerator deployment through 2027-2028",
   "capex_usd_b": null,
   "power_notes": "PT PLN Batam PPA 511 MVA (Indonesia's largest); Batam grid",
   "chips_notes": "Up to 170,000 Nvidia accelerators (Grace-Blackwell, Vera-Rubin, Vera) at the Firmus campus; Nvidia DSX platform",
   "notes": "NDP is DayOne's existing flagship campus (partly operating); KITP is new. Firmus expects $25-30B offtake over six years. Operational MW not disclosed.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://w.media/dayone-inks-indonesias-largest-power-deal-for-its-batam-data-center/",
     "title": "DayOne inks Indonesia's largest power deal (450 MW) for its Batam data centers",
     "date": "2026-04-21",
     "tier": 2
    },
    {
     "url": "https://firmus.co/newsroom/firmus-to-build-170-000-gpu-ai-factor-y-campus-with-nvidia-for-global-ai-natives",
     "title": "Firmus to build 170,000 GPU AI Factory campus with NVIDIA (360 MW, Batam, with DayOne)",
     "date": "2026-06",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/dayone-inks-450mw-ppa-with-pln-batam-to-power-planned-data-center-in-batam-indonesia/",
     "note": "DayOne's 450MW Kabil Industrial Tech Park campus and Firmus's co-developed 360MW Nvidia AI factory in Batam are confirmed as real, distinct-but-colocated projects with phased 2026-2027 power delivery; location on Batam Island checks out."
    }
   ],
   "verified": true
  },
  {
   "name": "Core Scientific (CoreWeave) Dalton Campus",
   "operator": "Core Scientific (being acquired by CoreWeave)",
   "tenant": "CoreWeave",
   "city": "Dalton",
   "region": "Georgia",
   "country": "USA",
   "lat": 34.7898,
   "lng": -84.9327,
   "coord_precision": "site",
   "mw_planned": 450,
   "mw_operational": 50,
   "status": "under_construction",
   "timeline": "Dalton 1 & 2 operational (an estimated 32k H100-equivalents of compute); Dalton 3 (206 Boring Dr) and a 175-acre expansion under development toward 450MW total campus capacity",
   "capex_usd_b": 1.1,
   "power_notes": null,
   "chips_notes": "~32,000 H100-equivalent GPUs at Dalton 1 & 2",
   "notes": "Distinct from Core Scientific's already-tracked Denton, TX, Muskogee, OK and Pecos, TX campuses.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://corescientific.com/high-density-data-centers/dalton-ga-dnn3/",
     "title": "High-Density Computing in Dalton",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/core-scientific-plans-new-ai-data-centers-in-dalton-georgia/",
     "title": "Core Scientific plans new AI data centers in Dalton, Georgia",
     "date": "2026",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "EdgeCore Culpeper Tech Zone",
   "operator": "EdgeCore Digital Infrastructure",
   "tenant": "Hyperscale (undisclosed)",
   "city": "Culpeper",
   "region": "Virginia",
   "country": "USA",
   "lat": 38.4732,
   "lng": -77.9966,
   "coord_precision": "town",
   "mw_planned": 432,
   "mw_operational": null,
   "status": "announced",
   "timeline": "120-acre, 1.4M sq ft campus; 216 MW initial critical IT, scalable to 432 MW; utility power expected 2028",
   "capex_usd_b": null,
   "power_notes": "Rappahannock Electric Cooperative / Dominion transmission (PJM); air-cooled, WUE <0.01 L/kWh",
   "chips_notes": "",
   "notes": "Culpeper is the emerging NoVA overflow submarket; Amazon (300 MW proposed, Jan 2025 per tier-3 tracker, not used) and Stack Copper Ridge are also in the county.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterfrontier.com/site-selection/article/55126944/land-and-expand-virginia-data-centers",
     "title": "Land and Expand: Virginia Data Centers",
     "date": "2024-07-19",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterfrontier.com/site-selection/article/55126944/land-and-expand-virginia-data-centers",
     "note": "Confirmed: 120-acre/1.4M sq ft Culpeper Tech Zone campus, 216MW initial scaling to 432MW, power expected 2028 via Rappahannock Electric Cooperative."
    }
   ],
   "verified": true
  },
  {
   "name": "AWS Lake Anna Technology Campus",
   "operator": "Amazon Web Services",
   "tenant": "",
   "city": "Mineral, Louisa County",
   "region": "Virginia",
   "country": "USA",
   "lat": 38.0625,
   "lng": -77.7833,
   "coord_precision": "site",
   "mw_planned": 420,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Filed 2023-24 (7 DC buildings, 1.7M sq ft, 153 acres, two substations); first building targeted 2025, full build-out by 2040",
   "capex_usd_b": 11,
   "power_notes": "Dominion Energy (PJM); adjacent to North Anna nuclear station (no direct PPA disclosed). DEQ review of discharge to Lake Anna tributaries (Jun 2026).",
   "chips_notes": "",
   "notes": "Minimum 420 MW per filings (DCD via search summary; Baxtel). $11B is the share of Amazon's $35B Virginia commitment attributed to this campus (Virginia Business). Amazon cancelled a separate third Louisa campus (1,370 acres, 7.2M sq ft) in Jul 2025 after opposition.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://virginiabusiness.com/amazon-cancels-data-center-in-louisa-county/",
     "title": "Amazon cancels data center in Louisa County",
     "date": "2025-07-28",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/amazon-files-for-17-million-sq-ft-data-center-campus-in-louisa-county-virginia/",
     "title": "Amazon files for 1.7 million sq ft data center campus in Louisa County, Virginia",
     "date": "2023",
     "tier": 2
    },
    {
     "url": "https://baxtel.com/data-center/amazon-lake-anna-tech-campus",
     "title": "Baxtel: Amazon Lake Anna Tech Campus",
     "date": "2026",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/amazon-files-for-17-million-sq-ft-data-center-campus-in-louisa-county-virginia/",
     "note": "Lake Anna Technology Campus (420MW min, 1.7M sq ft, 7 buildings, 153 acres near North Anna nuclear plant) is confirmed under construction; the row's own cited 'Amazon cancels' source actually refers to a separate, third, unrelated Louisa Co"
    }
   ],
   "verified": true
  },
  {
   "name": "AirTrunk Johor Bahru Campus (JHB1 + JHB2)",
   "operator": "AirTrunk (Blackstone)",
   "tenant": "Multiple hyperscale/cloud tenants",
   "city": "Iskandar Puteri",
   "region": "Johor",
   "country": "Malaysia",
   "lat": 1.4295,
   "lng": 103.6362,
   "coord_precision": "town",
   "mw_planned": 420,
   "mw_operational": 150,
   "status": "under_construction",
   "timeline": "JHB1 opened Jul 2024 (150MW+ live); JHB2 in planning/development on a 520-hectare site, 270MW+, targeted online ~2028",
   "capex_usd_b": 2.2,
   "power_notes": null,
   "chips_notes": null,
   "notes": "AirTrunk is distinct from Bridge Data Centres and YTL, Johor's other major operators already tracked in this dataset. Some reporting describes a further ~$3B/280MW expansion across two additional adjacent AirTrunk sites in Johor.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/airtrunk-announces-second-malaysian-data-center-in-johor/",
     "title": "AirTrunk announces second Malaysian data center in Johor",
     "date": "2025-2026",
     "tier": 2
    },
    {
     "url": "https://datacentremagazine.com/news/airtrunk-expands-in-malaysia-with-two-new-hyperscale-sites",
     "title": "AirTrunk Expands in Malaysia with Two New Hyperscale Sites",
     "date": "2026",
     "tier": 3
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Tract Eagle Mountain ('Project Tripletail')",
   "operator": "Tract",
   "tenant": "Undisclosed",
   "city": "Eagle Mountain",
   "region": "Utah",
   "country": "USA",
   "lat": 40.3,
   "lng": -112.03,
   "coord_precision": "town",
   "mw_planned": 400,
   "mw_operational": null,
   "status": "announced",
   "timeline": "668+ acres acquired Jan 2024; power delivery targeted 2028 via new transmission",
   "capex_usd_b": 7,
   "power_notes": "Rocky Mountain Power; 400 MW+ utility capacity",
   "chips_notes": "Not disclosed",
   "notes": "Master-planned park within Eagle Mountain RTI overlay (by-right data center use).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/tract-plans-400mw-data-center-park-in-eagle-mountain-utah/",
     "title": "Tract plans 400MW data center park in Eagle Mountain, Utah",
     "date": "2024-01-19",
     "tier": 2
    },
    {
     "url": "https://www.ksl.com/article/50486760/meta-announces-mega-expansion-to-facebook-data-center-in-utah",
     "title": "Meta announces mega expansion to Facebook data center in Utah (KSL)",
     "date": "2022-09-30",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/meta-to-expand-eagle-mountain-campus-again/",
     "title": "Meta to expand Eagle Mountain campus again",
     "date": "2022-09",
     "tier": 2
    },
    {
     "url": "https://utahnewsdispatch.com/2026/04/17/eagle-mountain-193-acre-data-center-campus-is-set-to-be-done-this-year-with-big-water-promises/",
     "title": "Eagle Mountain 193-acre data center campus is set to be done this year",
     "date": "2026-04-17",
     "tier": 3
    }
   ],
   "verified": true,
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/tract-plans-400mw-data-center-park-in-eagle-mountain-utah/",
     "note": "400MW/668-acre Eagle Mountain, UT campus and 2028 power timeline confirmed, but DCD/EDCUtah report the investment as 'up to $7 billion,' not the $1.5B stated; two of the row's cited sources (KSL, DCD 'Meta to expand Eagle Mountain campus ag"
    }
   ],
   "tier": "verified",
   "corrected": true
  },
  {
   "name": "K2 Strategic Infrastructure campus (Zibido San Giacomo / Lacchiarella)",
   "operator": "K2 Strategic Infrastructure",
   "tenant": "",
   "city": "Zibido San Giacomo",
   "region": "Lombardy (Milan)",
   "country": "Italy",
   "lat": 45.358,
   "lng": 9.108,
   "coord_precision": "town",
   "mw_planned": 400,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Reported Aug 2026 among Italy's strategic data center programmes; timeline not disclosed",
   "capex_usd_b": 5.8,
   "power_notes": "Not disclosed",
   "chips_notes": "Not disclosed",
   "notes": "~€5.3bn project value converted at ~1.09 (estimate). Milan area expected to add ~2GW in five years.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://en.ilsole24ore.com/art/data-centre-eu-gives-green-light-to-eni-khazna-joint-venture-lombardy-hub-to-be-accelerated-AJl2Zcj",
     "title": "Il Sole 24 Ore: EU green light to Eni-Khazna JV; Lombardy hub",
     "date": "2026-08-10",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://en.ilsole24ore.com/art/data-centre-eu-gives-green-light-to-eni-khazna-joint-venture-lombardy-hub-to-be-accelerated-AJl2Zcj",
     "note": "K2 Strategic Infrastructure's 400MW Zibido San Giacomo/Lacchiarella campus (Eni-Khazna JV, Italian government 'strategic' designation) confirmed; reported EUR5.3B investment converts to ~$5.8B matching capex figure."
    }
   ],
   "verified": true
  },
  {
   "name": "Firmus Tasmania AI Factory Zone (St Leonards / Bell Bay / Wesley Vale)",
   "operator": "Firmus Technologies",
   "tenant": "Firmus AI Cloud customers (incl. Fireworks AI)",
   "city": "Launceston (St Leonards)",
   "region": "Tasmania",
   "country": "Australia",
   "lat": -41.45,
   "lng": 147.2,
   "coord_precision": "town",
   "mw_planned": 400,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "AI Factory Zone declared Jul 2025; St Leonards Stage 1a 44 MW -> 90/104 MW under construction, ops targeted late 2026/early 2027; Bell Bay 288 MW approved 25 Aug 2026; Wesley Vale 52 MW DA lodged; ~400 MW total",
   "capex_usd_b": 1.4,
   "power_notes": "Hydro Tasmania/Aurora 104 MW renewable supply from Aug 2026; TasNetworks grid connection; Bell Bay: 276 backup diesel gensets with strict run limits",
   "chips_notes": "~36,000-36,800 Nvidia GB300 at St Leonards when complete; Vera Rubin planned",
   "notes": "Capex is Stage 1a backing A$2.1B (~US$1.4B). Firmus would become Tasmania's largest electricity user if all three proceed.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://w.media/firmus-secures-approval-for-288mw-bell-bay-ai-factory/",
     "title": "Firmus secures approval for 288MW Bell Bay AI Factory (St Leonards 104 MW under construction; Wesley Vale 52 MW)",
     "date": "2026-08-25",
     "tier": 2
    },
    {
     "url": "https://firmus.co/newsroom/southgate-expansion",
     "title": "Firmus expands Project Southgate across Australia (Tasmania flagship, 36,800 GB300)",
     "date": "2025-10",
     "tier": 1
    },
    {
     "url": "https://letsdatascience.com/news/firmus-proposes-three-ai-factories-threatens-largest-tasmani-08ab187a",
     "title": "Firmus proposes three AI factories in Tasmania (Stage 1 90 MW, Stage 2 300 MW, Aurora 104 MW PPA)",
     "date": "2026-06-14",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.abc.net.au/news/2026-08-25/firmus-ai-bell-bay-receives-george-town-council-approval/107074336",
     "note": "Bell Bay 288MW approval by George Town Council on Aug 25, 2026 confirmed exactly; St Leonards under construction and overall ~400MW multi-site AI Factory Zone status checks out."
    }
   ],
   "verified": true
  },
  {
   "name": "Applied Digital Polaris Forge 1 (Ellendale)",
   "operator": "Applied Digital",
   "tenant": "CoreWeave",
   "city": "Ellendale",
   "region": "North Dakota",
   "country": "USA",
   "lat": 46.0025,
   "lng": -98.527,
   "coord_precision": "town",
   "mw_planned": 400,
   "mw_operational": 175,
   "status": "operating",
   "timeline": "Building 1 (100 MW) RFS Q4 2025; Building 2 Phase 1 (75 MW) delivered Jun 30, 2026 -> 175 MW live; Building 2 remainder 2026; Building 3 (150 MW) 2027; campus engineered to scale to 1 GW (2028-30 power allocations).",
   "capex_usd_b": null,
   "power_notes": "MISO grid via Otter Tail/Basin Electric region; ~$11B contracted lease revenue over ~15 years.",
   "chips_notes": "CoreWeave Nvidia GPUs; counts not disclosed.",
   "notes": "Below 500 MW contracted but designed for 1 GW. Applied Digital's other campuses: Polaris Forge 2 (Harwood ND, 300 MW, under construction), Polaris Forge 3 (ND, 300 MW, Aug 2027), Delta Forge 1 (Boyce LA, 300 MW, 2027), Delta Forge 2 (210 MW, H1 2028) - total 1,410 MW contracted (FY2026 results).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1",
     "title": "Applied Digital delivers second building at Polaris Forge 1",
     "date": "2026-07-01",
     "tier": 1
    },
    {
     "url": "https://ir.applieddigital.com/news-events/press-releases/detail/159/applied-digital-reports-fiscal-fourth-quarter-and-full-year",
     "title": "Applied Digital fiscal Q4 & FY2026 results",
     "date": "2026-07-27",
     "tier": 1
    },
    {
     "url": "https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with",
     "title": "Applied Digital finalizes additional 150 MW lease with CoreWeave",
     "date": "2025-08-29",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/applied-digital-completes-second-building-at-north-dakota-data-center-campus/",
     "note": "175MW live (100MW Bldg 1 + 75MW Bldg 2 Phase 1), full CoreWeave tenancy under $11bn/15-yr lease, and 400MW full build-out target all confirmed via Applied Digital IR/press coverage."
    }
   ],
   "verified": true
  },
  {
   "name": "Compass Datacenters Red Oak campus",
   "operator": "Compass Datacenters",
   "tenant": "Hyperscale/cloud customers (undisclosed)",
   "city": "Red Oak (Ellis County)",
   "region": "Texas",
   "country": "USA",
   "lat": 32.5,
   "lng": -96.79,
   "coord_precision": "town",
   "mw_planned": 350,
   "mw_operational": null,
   "status": "operating",
   "timeline": "225-acre campus announced Jan 2020 (350+MW IT); $300M expansion 2024; May 2026 city approval for separate 830-acre second Red Oak campus; $12.6M TSTC training building Jun 2026.",
   "capex_usd_b": null,
   "power_notes": "ERCOT (Oncor); dedicated high-voltage substation.",
   "chips_notes": "Not disclosed.",
   "notes": "Operational MW not published.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.compassdatacenters.com/news/compass-datacenters-adds-second-dallas-area-campus/",
     "title": "Compass Datacenters Adds Second Dallas Area Campus",
     "date": "2020-01-29",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/compass-datacenters-looks-to-expand-red-oak-campus/",
     "title": "Compass Datacenters looks to expand Red Oak campus",
     "date": "2026-05",
     "tier": 2
    },
    {
     "url": "https://www.bisnow.com/national/news/data-center-development/google-launches-40b-texas-data-center-build-out-131930",
     "title": "Google Launches $40B Texas Data Center Build-Out",
     "date": "2025-11-17",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/google-commits-40bn-to-expand-cloud-and-ai-infrastructure-in-texas-through-2027/",
     "title": "Google commits $40bn to expand cloud and AI infrastructure in Texas through 2027",
     "date": "2025-11-17",
     "tier": 2
    }
   ],
   "verified": true,
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/compass-datacenters-looks-to-expand-red-oak-campus/",
     "note": "350+MW Red Oak campus and 'operating' status confirmed (multiple 45MW buildings already online); mw_operational is left null in the row though a partial aggregate figure likely exists -- not corrected for lack of a precise tier-1/2 total."
    }
   ],
   "tier": "verified"
  },
  {
   "name": "xAI Colossus 1 (original Memphis site)",
   "operator": "xAI",
   "tenant": null,
   "city": "Memphis (South Memphis / Riverport, 3231 Paul R. Lowry Rd)",
   "region": "Tennessee",
   "country": "USA",
   "lat": 35.027,
   "lng": -90.114,
   "coord_precision": "site",
   "mw_planned": 340,
   "mw_operational": 300,
   "status": "operating",
   "timeline": "Built in a reported 122 days; operational Jul-Sep 2024; local grid connection upgraded from ~8MW toward ~150MW, supplemented by on-site gas turbines and Tesla Megapack batteries to reach an estimated 300-340MW of IT power",
   "capex_usd_b": 12.9,
   "power_notes": "Former Electrolux factory site; supplemented by temporary natural-gas turbines and Tesla Megapack battery systems due to limited local grid capacity",
   "chips_notes": "~220,000 GPUs (mix of NVIDIA H100, H200 and GB200)",
   "notes": "The original, smaller xAI Colossus site in Memphis proper -- distinct from xAI's much larger Colossus 2 / MACROHARDRR campus in Memphis-Southaven, MS (already tracked in this dataset at 2,000MW planned).",
   "value_type": "estimate",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/xai-colossus-memphis-power-tva/",
     "title": "Fury from campaigners as Elon Musk's xAI gets 150MW for Colossus Memphis",
     "date": "2024-2025",
     "tier": 2
    },
    {
     "url": "https://en.wikipedia.org/wiki/Colossus_(data_center)",
     "title": "Colossus (data center)",
     "date": "2026",
     "tier": 3
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Nebius Lappeenranta AI factory",
   "operator": "Nebius",
   "tenant": "",
   "city": "Lappeenranta",
   "region": "South Karelia",
   "country": "Finland",
   "lat": 61.0587,
   "lng": 28.1887,
   "coord_precision": "town",
   "mw_planned": 310,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Announced Mar 31, 2026; ~100-acre industrial site; first capacity to customers in 2027",
   "capex_usd_b": null,
   "power_notes": "Predominantly low-carbon energy mix; closed-loop liquid cooling with heat recovery to district heating",
   "chips_notes": "NVIDIA Blackwell and Vera Rubin platforms (counts not disclosed)",
   "notes": "",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland",
     "title": "Nebius to construct 310MW AI factory in Finland",
     "date": "2026-03-31",
     "tier": 1
    },
    {
     "url": "https://www.cnbc.com/2026/03/31/nebius-finland-ai-factory-europe-compute.html",
     "title": "CNBC: Nebius unveils plans for one of Europe's largest AI factories",
     "date": "2026-03-31",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland",
     "note": "310MW Lappeenranta AI factory, ~100-acre site, announced Mar 31 2026, first capacity to customers 2027, all confirmed via Nebius's own newsroom release."
    }
   ],
   "verified": true
  },
  {
   "name": "Related Digital Cheyenne campus",
   "operator": "Related Digital",
   "tenant": "CoreWeave (88 MW anchor)",
   "city": "Cheyenne",
   "region": "Wyoming",
   "country": "USA",
   "lat": 41.14,
   "lng": -104.75,
   "coord_precision": "town",
   "mw_planned": 302,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Groundbreaking Oct 7, 2025; 115-acre campus; first 184,000 sq ft / 88 MW building for CoreWeave due late 2026",
   "capex_usd_b": 1.2,
   "power_notes": "Black Hills Energy; air-cooled chillers",
   "chips_notes": "Not disclosed (CoreWeave GPU cloud tenant)",
   "notes": "",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.related.com/press-releases/2025-10-07/related-digital-breaks-ground-302-mw-data-center-campus-cheyenne-wyoming",
     "title": "Related Digital breaks ground on 302 MW data center campus in Cheyenne",
     "date": "2025-10-07",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.related.com/press-releases/2025-10-07/related-digital-breaks-ground-302-mw-data-center-campus-cheyenne-wyoming",
     "note": "302MW/115-acre Cheyenne campus, Oct 7 2025 groundbreaking, CoreWeave 88MW anchor, $1.2B capex, and late-2026 first-building target all confirmed via Related's own press release."
    }
   ],
   "verified": true
  },
  {
   "name": "QTS Calatorao campus (Blackstone 'Project Rodes')",
   "operator": "QTS Data Centers (Blackstone)",
   "tenant": "",
   "city": "Calatorao",
   "region": "Aragón (Zaragoza)",
   "country": "Spain",
   "lat": 41.5245,
   "lng": -1.338,
   "coord_precision": "town",
   "mw_planned": 300,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Announced Oct 2024; 224 ha site, ~half developed initially; construction expected late 2026–2027; first phase complete 2028–2029 (El Español, Mar 2026)",
   "capex_usd_b": 8.2,
   "power_notes": "Aragón grid connection points constrained (9 reserved); QTS targets carbon-free power and closed-loop cooling",
   "chips_notes": "Not disclosed",
   "notes": "€7.5bn ($8.2bn) initial phase, further €7.5bn planned for second half of site. ~1,400 direct jobs.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/blackstone-to-develop-300mw-data-center-campus-in-aragon-spain/",
     "title": "DCD: Blackstone to develop 300MW data center campus in Aragon",
     "date": "2024-10-15",
     "tier": 2
    },
    {
     "url": "http://q.com/data-centers/calatorao-en/",
     "title": "QTS: Calatorao data center",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://www.elespanol.com/aragon/economia/20260322/aragon-convierte-capital-datos-nube-calendario-amazon-microsoft-proyectos/1003744178360_0.html",
     "title": "El Español: Aragón data center project calendar",
     "date": "2026-03-22",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/blackstone-to-develop-300mw-data-center-campus-in-aragon-spain/",
     "note": "300MW Calatorao/Zaragoza campus, 224ha site, EUR7.5B (~$8.2B) investment, and announced-not-yet-under-construction status all confirmed."
    }
   ],
   "verified": true
  },
  {
   "name": "SoftBank Hokkaido AI Data Center (Tomakomai)",
   "operator": "SoftBank Corp. (with IDC Frontier)",
   "tenant": "SoftBank (in-house GenAI, GPU cloud); universities/enterprises",
   "city": "Tomakomai",
   "region": "Hokkaido",
   "country": "Japan",
   "lat": 42.634,
   "lng": 141.605,
   "coord_precision": "town",
   "mw_planned": 300,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Announced Nov 2023; groundbreaking Apr 2025; phase 1 (50 MW) due FY2026 (by Mar 2027); 60-70% complete Feb 2026; >300 MW planned, up to ~1 GW long term",
   "capex_usd_b": 0.456,
   "power_notes": "Targets 100% Hokkaido-sourced renewable power ('locally produced, locally consumed'); METI subsidy up to half of cost; Hokkaido grid constraints reported",
   "chips_notes": "Nvidia GPUs (part of SoftBank's ~10,000+ GPU AI computing platform); site-level counts not disclosed",
   "notes": "JPY 65bn (~$456M) first-phase investment. 700,000 sqm site.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.softbank.jp/en/sbnews/entry/20260225_01",
     "title": "SoftBank: Building for the AI Era - inside look at Tomakomai AI data center (60-70% complete)",
     "date": "2026-02-25",
     "tier": 1
    },
    {
     "url": "https://w.media/softbank-breaks-ground-for-ai-data-center-in-hokkaido/",
     "title": "SoftBank breaks ground for AI data center in Hokkaido (JPY 65bn, 50 MW phase 1 in 2026)",
     "date": "2025-04",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/softbank-breaks-ground-on-data-center-campus-in-hokkaido-japan/",
     "title": "SoftBank breaks ground on data center campus in Hokkaido, Japan",
     "date": "2025-04",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/softbank-breaks-ground-on-data-center-campus-in-hokkaido-japan/",
     "note": "Tomakomai, Hokkaido campus confirmed under construction (groundbreaking Apr/May 2025), phase 1 50MW targeted 2026, 300MW total with up to 1GW long-term, ~$456M investment -- all match."
    }
   ],
   "verified": true
  },
  {
   "name": "ODATA (Aligned) Querétaro campus",
   "operator": "ODATA / Aligned Data Centers",
   "tenant": "Hyperscale (undisclosed)",
   "city": "Querétaro",
   "region": "Querétaro",
   "country": "Mexico",
   "lat": 20.5888,
   "lng": -100.3899,
   "coord_precision": "town",
   "mw_planned": 300,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Second Querétaro facility inaugurated May 2025; US$3B campus described as Mexico's largest",
   "capex_usd_b": 3,
   "power_notes": "CFE grid",
   "chips_notes": "Not disclosed",
   "notes": "300 MW is from DCD headline ('OData's 300MW Mexican facility launch', 2 May 2025) seen via news index; MW operational not disclosed.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://mexiconewsdaily.com/business/odata-queretaro-data-center/",
     "title": "ODATA inaugurates US $3B data center campus in Querétaro",
     "date": "2025-05-06",
     "tier": 2
    },
    {
     "url": "https://news.google.com/rss/search?q=Mexico+Quer%C3%A9taro+data+center+campus+MW+2026&hl=en-US&gl=US&ceid=US:en",
     "title": "DCD: 'OData launches 300MW Mexican facility' (via Google News index)",
     "date": "2025-05-02",
     "tier": 2
    },
    {
     "url": "https://mexiconewsdaily.com/business/microsoft-data-center-queretaro/",
     "title": "Microsoft opens new data center region in Querétaro, Mexico",
     "date": "2024-05-28",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-to-invest-13-billion-in-mexico-to-enhance-ai-infrastructure/",
     "title": "Microsoft to invest $1.3 billion in Mexico to enhance AI infrastructure",
     "date": "2024-09",
     "tier": 2
    }
   ],
   "verified": true,
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/odata-launches-first-phase-of-300mw-mexican-data-center/",
     "note": "ODATA/Aligned's 300MW, 5-building, >$3B Querétaro campus confirmed with phased energization (200MW energized Feb 2025, 75MW facility launched May 2025); 'operating' status reasonable given it is live and expanding in phases."
    }
   ],
   "tier": "verified"
  },
  {
   "name": "Cipher Mining Barber Lake",
   "operator": "Cipher Mining (Cipher Digital)",
   "tenant": "Fluidstack (207 MW IT, Google backstop); AWS 300 MW hosting deal also reported at Barber Lake (see notes)",
   "city": "Colorado City",
   "region": "Texas",
   "country": "USA",
   "lat": 32.3882,
   "lng": -100.8621,
   "coord_precision": "town",
   "mw_planned": 300,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Fluidstack 168 MW IT lease Sep 2025 + 39 MW Nov 2025 (entire site); AWS $5.5B/15-yr 300 MW lease announced Nov 3, 2025 with go-live Jul 2026 and rent from Aug 2026; Fluidstack operations Sep-Oct 2026. Energization not confirmed in fetched sources.",
   "capex_usd_b": null,
   "power_notes": "ERCOT/Oncor; 300 MW gross site. Separate Colchis JV: 1 GW West Texas site (620 acres, AEP 1 GW direct-connect, energization 2028, Cipher 95%); total pipeline 3.2 GW.",
   "chips_notes": "Not disclosed.",
   "notes": "Source conflict: Reuters/Yahoo (Nov 3, 2025) places the AWS 300 MW deal at Barber Lake, while The Block (Nov 20, 2025) says Fluidstack leases the entire 300 MW Barber Lake site - could not reconcile without Cipher's own filings (IR site unreachable). Colchis location not sourced beyond 'West Texas' so not mapped separately.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://finance.yahoo.com/news/cipher-mining-adds-amazon-services-131429996.html",
     "title": "Cipher Mining adds Amazon Web Services as data center client",
     "date": "2025-11-03",
     "tier": 2
    },
    {
     "url": "https://www.theblock.co/post/379722/cipher-mining-full-site-fluidstack-lease-raise-333-million-texas-expansion",
     "title": "The Block - Cipher Mining lands full-site Fluidstack lease",
     "date": "2025-11-20",
     "tier": 3
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/aws-signs-300mw-hosting-deal-to-lease-capacity-from-cipher-mining/",
     "title": "DCD - AWS signs 300MW hosting deal with Cipher Mining",
     "date": "2025-11",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://finance.yahoo.com/news/cipher-mining-adds-amazon-services-131429996.html",
     "note": "Confirmed both the Fluidstack full-site lease (168MW + 39MW) and the separate AWS $5.5B/300MW/15-yr lease (go-live Jul 2026, rent from Aug 2026) are located at Cipher's Barber Lake site, Colorado City, TX, as the row states."
    }
   ],
   "verified": true
  },
  {
   "name": "Nebius / DataOne Vineland",
   "operator": "DataOne (developer) for Nebius Group",
   "tenant": "Microsoft (~$17.4B five-year agreement)",
   "city": "Vineland",
   "region": "New Jersey",
   "country": "USA",
   "lat": 39.4864,
   "lng": -75.026,
   "coord_precision": "town",
   "mw_planned": 300,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Microsoft deal Sep 8, 2025 with capacity delivery 'later this year'; Phase 1 under construction; stop-work orders on LNG tank/Bloom fuel cells Aug 2026; Phase 2 approved Aug 18, 2026 (to ~350 MW per secondary reports).",
   "capex_usd_b": null,
   "power_notes": "PJM grid plus on-site Bloom Energy fuel cells and LNG storage (subject of Aug 2026 stop-work orders).",
   "chips_notes": "Not disclosed.",
   "notes": "Below 500 MW; included because Nebius was explicitly requested. Operational MW not disclosed. Nebius also has a Kansas City lease and a $3B Meta deal, targeting 2.5 GW contracted by end-2026 (DCD).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://whyy.org/articles/vineland-data-center-stop-work-orders/",
     "title": "WHYY - City of Vineland issues stop-work order to parts of data center",
     "date": "2026-08-14",
     "tier": 2
    },
    {
     "url": "https://nebius.com/newsroom/nebius-announces-multi-billion-dollar-agreement-with-microsoft-for-ai-infrastructure",
     "title": "Nebius announces multi-billion dollar agreement with Microsoft",
     "date": "2025-09-08",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://whyy.org/articles/vineland-data-center-stop-work-orders/",
     "note": "300MW Vineland, NJ facility confirmed under construction as of Aug 2026 despite two stop-work orders over unpermitted LNG tank/Bloom fuel cell installation; Microsoft ~$17B Nebius partnership and Phase 2 approval confirmed."
    }
   ],
   "verified": true
  },
  {
   "name": "CoreWeave Lancaster AI Data Center",
   "operator": "Chirisa Technology Parks / Machine Investment Group (developers); CoreWeave",
   "tenant": "CoreWeave (sole tenant)",
   "city": "Lancaster",
   "region": "Pennsylvania",
   "country": "USA",
   "lat": 40.0379,
   "lng": -76.3055,
   "coord_precision": "town",
   "mw_planned": 300,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Announced Jul 21 2025; initial 100 MW IT, scalable to 300 MW; Turner-Wohlsen JV as GC; no completion date disclosed",
   "capex_usd_b": 6,
   "power_notes": "PPL Electric (PJM). Grid-supplied; no on-site generation disclosed.",
   "chips_notes": "Purpose-built for AI GPU workloads; models/counts not disclosed",
   "notes": "~600 construction jobs, 70 operational at launch scaling to 175.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.hochtief.com/news-media/press-releases/press-release/coreweave-announces-multi-billion-dollar-commitment-to-ai-infrastructure-in-pennsylvania",
     "title": "CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania (Hochtief/Turner)",
     "date": "2025-07-21",
     "tier": 1
    },
    {
     "url": "https://www.turnerconstruction.com/insights/coreweave-announces-multi-billion-dollar-commitment-to-ai-infrastructure-in-pennsylvania",
     "title": "Turner Construction: CoreWeave Pennsylvania commitment",
     "date": "2025-07-21",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/coreweave-plans-6bn-data-center-in-lancaster-pennsylvania/",
     "title": "CoreWeave plans $6bn data center in Lancaster, Pennsylvania",
     "date": "2025-07",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.hochtief.com/news-media/press-releases/press-release/coreweave-announces-multi-billion-dollar-commitment-to-ai-infrastructure-in-pennsylvania",
     "note": "Lancaster, PA campus confirmed: 100MW initial scaling to 300MW, $6B investment (exact match), Turner-Wohlsen JV as GC, announced Jul 21 2025."
    }
   ],
   "verified": true
  },
  {
   "name": "Rainbow Energy Coal Creek data center park",
   "operator": "Rainbow Energy Center",
   "tenant": "Undisclosed",
   "city": "Underwood (McLean County)",
   "region": "North Dakota",
   "country": "USA",
   "lat": 47.376,
   "lng": -101.156,
   "coord_precision": "site",
   "mw_planned": 300,
   "mw_operational": 200,
   "status": "operating",
   "timeline": "Existing ~200 MW data center directly powered by Coal Creek Station; ~800 acres rezoned commercial Jul 2025 for additional data centers/industrial park",
   "capex_usd_b": null,
   "power_notes": "Behind-the-meter from Coal Creek Station (1,151-1,210 MW lignite plant); possible on-site gas generation",
   "chips_notes": "Not disclosed",
   "notes": "Tier-3 tracker cites 300 MW planned (omitted). Existing 200 MW load reported by DCD; likely crypto/HPC rather than AI.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/rainbow-energy-plans-data-center-powered-by-north-dakotas-largest-coal-plant-report/",
     "title": "Rainbow Energy plans data center powered by North Dakota's largest coal plant (200 MW existing)",
     "date": "2025-07-08",
     "tier": 2
    },
    {
     "url": "https://www.powermag.com/north-dakotas-largest-coal-plant-could-power-data-centers-industrial-complex/",
     "title": "POWER - North Dakota's Largest Coal Plant Could Power Data Centers, Industrial Complex",
     "date": "2025-07-08",
     "tier": 2
    }
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/rainbow-energy-plans-data-center-powered-by-north-dakotas-largest-coal-plant-report/",
     "note": "DCD reports the 200MW facility already operates (contradicting the row's 'announced' status) while a further ~300MW expansion on the rezoned 800 acres remains only in the planning stage."
    }
   ],
   "verified": true
  },
  {
   "name": "Core Scientific Denton (CoreWeave)",
   "operator": "Core Scientific (being acquired by CoreWeave)",
   "tenant": "CoreWeave (serving OpenAI)",
   "city": "Denton",
   "region": "Texas",
   "country": "USA",
   "lat": 33.2148,
   "lng": -97.1331,
   "coord_precision": "town",
   "mw_planned": 282,
   "mw_operational": 262,
   "status": "operating",
   "timeline": "Former bitcoin site converted; ~260 MW critical IT contracted to CoreWeave (Feb 2025 expansion +70 MW); delayed by developer, 16,000+ GPUs online by end Dec 2025; Epoch projects 282 MW by Q2 2027",
   "capex_usd_b": 9.9,
   "power_notes": "ERCOT; ~394 MW site utility capacity (Core Scientific); air-cooled chillers",
   "chips_notes": "Epoch AI est. ~100k Nvidia B200 (253k H100e); DCD: 16,000+ GPUs deployed by Dec 2025",
   "notes": "mw_operational, mw_planned and capex are Epoch AI estimates (as of 1 Sep 2026); contracted 260 MW figure is Core Scientific-reported.",
   "value_type": "estimate",
   "sources": [
    {
     "url": "https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site",
     "title": "Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site",
     "date": "2025-02-26",
     "tier": 1
    },
    {
     "url": "https://epoch.ai/data/ai-data-centers/directory/coreweave-denton-tx",
     "title": "Epoch AI: CoreWeave Denton TX",
     "date": "2026-09-01",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/coreweave-deploys-16000-gpus-at-delayed-data-center-in-denton-texas/",
     "title": "CoreWeave deploys 16,000 GPUs at delayed data center in Denton, Texas",
     "date": "2026-01-13",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site",
     "note": "Denton, TX site confirmed at ~260-262MW operational critical IT for CoreWeave (matches row's 262MW operational), with 282MW planned figure from Epoch's near-term projection layered on top; core facts hold."
    }
   ],
   "verified": true
  },
  {
   "name": "Applied Digital Polaris Forge 2 (Harwood)",
   "operator": "Applied Digital",
   "tenant": "US investment-grade hyperscaler (negotiations at announcement)",
   "city": "Harwood (Cass County)",
   "region": "North Dakota",
   "country": "USA",
   "lat": 46.98,
   "lng": -96.88,
   "coord_precision": "town",
   "mw_planned": 280,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Announced Aug 18, 2025; groundbreaking Sep 2025; 900+ acres; initial operations 2026, full 280 MW early 2027 (two ~140 MW buildings)",
   "capex_usd_b": 3,
   "power_notes": "Cass County Electric Cooperative / Minnkota Power Cooperative",
   "chips_notes": "Not disclosed",
   "notes": "Included as a North Dakota campus distinct from Ellendale (Polaris Forge 1).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge",
     "title": "Applied Digital to Break Ground on $3 Billion Polaris Forge 2 Campus",
     "date": "2025-08-18",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge",
     "note": "Harwood (Cass County), ND campus confirmed exactly: 280MW, $3B capex, Sept 2025 groundbreaking, 2026 initial ops, early-2027 full capacity, undisclosed hyperscaler tenant in negotiation."
    }
   ],
   "verified": true
  },
  {
   "name": "Aligned Quantum Frederick campus (IAD-06 first building)",
   "operator": "Aligned Data Centers",
   "tenant": "",
   "city": "Adamstown, Frederick County",
   "region": "Maryland",
   "country": "USA",
   "lat": 39.31,
   "lng": -77.47,
   "coord_precision": "site",
   "mw_planned": 264,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Ground broken on 72 MW IAD-06 (Oct 2025); topped out Mar 12, 2026 (450,000 sq ft, two stories); four buildings/264 MW planned on 75 acres; MDE approved 172 backup generators 2025.",
   "capex_usd_b": null,
   "power_notes": "Potomac Edison (FirstEnergy), PJM; Maryland Critical Infrastructure Streamlining Act (2024) removed CPCN requirement for backup gensets that had stalled the project.",
   "chips_notes": "",
   "notes": "Inside TPG Real Estate's 2,100-acre Quantum Frederick park (former Eastalco smelter); Frederick County created a data-center overlay zone around the park Jan 2026.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/aligned-tops-out-maryland-data-center/",
     "title": "Aligned tops out Maryland data center",
     "date": "2026-03-12",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/aligned-planning-13-million-sq-ft-and-192mw-of-capacity-at-quantum-loopholes-maryland-campus/",
     "title": "Aligned planning 3.3 million sq ft and 264MW of capacity at Quantum Frederick",
     "date": "",
     "tier": 2
    },
    {
     "url": "https://cleanview.co/data-centers/maryland/825/aligned-quantum-frederick-campus",
     "title": "Cleanview – Aligned Quantum Frederick campus",
     "date": "",
     "tier": 3
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/amazon-to-expand-virginia-cloud-region-into-maryland-develop-data-centers-in-tpgs-quantum-frederick-park/",
     "title": "Amazon to expand Virginia cloud region into Maryland, develop data centers in TPG's Quantum Frederick park",
     "date": "2025-04-25",
     "tier": 2
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/aligned-tops-out-maryland-data-center/",
     "note": "DCD (tier 2, Mar 12 2026) confirms IAD-06 topped out: 72 MW, two-story 450,000 sq ft, 75-acre campus in TPG's Quantum Frederick, 'four buildings totaling 264MW are currently planned', construction began ~Oct 2025. Also notes Aligned broke ground on IAD-04 at the site in 2025, so two buildings are un"
    },
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/amazon-to-expand-virginia-cloud-region-into-maryland-develop-data-centers-in-tpgs-quantum-frederick-park/",
     "note": "DCD (tier 2, Apr 25 2025) confirms four buildings BWI-150..153 at 3250 Digital Drive and AWS statement that a new Maryland AZ for us-east-1 is 'expected to open in 2026'. CAUTION: the 258 MW is derived from the MDE air permit's backup-generator fleet (92x2.75 MW + 6x750 kW + 1x250 kW ≈ 257.75 MW) — "
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "Aker Nscale Korgen campus",
   "operator": "Aker Nscale",
   "tenant": "",
   "city": "Korgen (Hemnes)",
   "region": "Nordland",
   "country": "Norway",
   "lat": 66.077,
   "lng": 13.825,
   "coord_precision": "town",
   "mw_planned": 250,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Announced Oct 2025; awaiting Statnett power allocation; construction timeline not set",
   "capex_usd_b": null,
   "power_notes": "Awaiting Statnett grid allocation; land formerly owned by Nordkraft; hydropower region",
   "chips_notes": "Not disclosed",
   "notes": "Aker Nscale also operates 30MW at Glomfjord Industrial Park (expanding to 60MW).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/aker-nscale-plans-another-data-center-in-narvik-norway/",
     "title": "DCD: Aker Nscale plans another data center in Norway",
     "date": "2025-10-24",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/aker-nscale-plans-another-data-center-in-narvik-norway/",
     "note": "Despite the source URL's 'Narvik' slug, the article's actual content places this 250MW facility in Korgen (Hemnes), a village south of Bodo on former Nordkraft land, awaiting Statnett power allocation -- matching the row exactly. (Aker Nsca"
    }
   ],
   "verified": true
  },
  {
   "name": "Data4 Nozay AI campus",
   "operator": "Data4 (Brookfield)",
   "tenant": "",
   "city": "Nozay",
   "region": "Île-de-France (Essonne)",
   "country": "France",
   "lat": 48.658,
   "lng": 2.242,
   "coord_precision": "town",
   "mw_planned": 250,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Under development; first data center operational 2027",
   "capex_usd_b": null,
   "power_notes": "Not disclosed",
   "chips_notes": "Not disclosed",
   "notes": "Former Nokia HQ area, 5km from Data4's Marcoussis campus.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/analysis/france-ai-data-center-build-out-emmanuel-macron/",
     "title": "DCD analysis: French AI data center build-out",
     "date": "2025-09-11",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/analysis/france-ai-data-center-build-out-emmanuel-macron/",
     "note": "Data4's 250MW Nozay campus (former Nokia France/Alcatel-Lucent site, 5km from Data4's Marcoussis site) confirmed, first data center targeted operational 2027, consistent with 'announced' status."
    }
   ],
   "verified": true
  },
  {
   "name": "SoftBank Sakai AI Data Center (former Sharp Sakai LCD plant)",
   "operator": "SoftBank Corp.",
   "tenant": "SB OpenAI Japan (SoftBank-OpenAI 50:50 JV, 'Cristal Intelligence'); SoftBank GPU cloud",
   "city": "Sakai",
   "region": "Osaka",
   "country": "Japan",
   "lat": 34.5806,
   "lng": 135.438,
   "coord_precision": "site",
   "mw_planned": 250,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Site acquired Mar 2025 (JPY 100bn); construction 2025; 150 MW initial targeted to begin operation in 2026; expansion to 250 MW by FY2028",
   "capex_usd_b": 0.67,
   "power_notes": "Grid (Kansai Electric); SoftBank building on-site battery production/storage in Osaka (Apr 2026 reports)",
   "chips_notes": "~100,000 Nvidia GPUs planned (Digitimes/GuruFocus, Mar 2025); total investment reported near JPY 1 trillion",
   "notes": "Capex shown is the JPY 100bn site purchase only; full build reported at ~JPY 1trn (~$6.5B). Whether the first 150 MW was energized by 2026-09-01 could not be confirmed from a primary source (KDDI's separate Sakai DC on the same former Sharp site opened Jan 2026).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.lightreading.com/data-centers/softbank-spends-673m-on-sakai-plant-in-osaka-for-new-ai-data-center",
     "title": "SoftBank spends $673M on Sakai plant in Osaka for new AI data center (150 MW -> 250 MW)",
     "date": "2025-03-17",
     "tier": 2
    },
    {
     "url": "https://w.media/softbank-openai-to-build-ai-data-center-in-defunct-sharp-lcd-factory/",
     "title": "SoftBank, OpenAI to build AI-data center in defunct Sharp LCD factory",
     "date": "2025-03-17",
     "tier": 2
    },
    {
     "url": "https://www.digitimes.com/news/a20250317PD219/softbank-openai-data-center-sakai-display-products.html",
     "title": "Softbank to build world's first AI agent data center with OpenAI (100k GPUs)",
     "date": "2025-03-17",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.lightreading.com/data-centers/softbank-spends-673m-on-sakai-plant-in-osaka-for-new-ai-data-center",
     "note": "Sakai, Osaka former Sharp LCD plant campus confirmed: 150MW initial (targeting operation by end of 2026) expanding to 250MW+, ~$672.6M investment matching capex_usd_b of 0.67."
    }
   ],
   "verified": true
  },
  {
   "name": "Hut 8 River Bend AI Campus",
   "operator": "Hut 8",
   "tenant": "Fluidstack (for Anthropic; Google financial backstop)",
   "city": "St. Francisville (West Feliciana Parish)",
   "region": "Louisiana",
   "country": "USA",
   "lat": 30.76,
   "lng": -91.33,
   "coord_precision": "town",
   "mw_planned": 245,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "15-year 245 MW lease signed Dec 2025 ($7.0B TCV); $3.25B bonds priced Apr 2026; first data hall commissioning Q2 2027, more halls through 2027; ROFO for +1,000 MW; broader 2.295 GW Hut 8-Fluidstack-Anthropic partnership",
   "capex_usd_b": 10,
   "power_notes": "Entergy Louisiana (MISO): 330 MW initial utility capacity, scalable by ~1,000 MW; adjacent to River Bend nuclear station area",
   "chips_notes": "Not disclosed",
   "notes": "capex = 'up to $10B Phase I' per Entergy/LED. 592-acre campus.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://canada.hut8.com/resources/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value-of-usd7-0-billion",
     "title": "Hut 8 Signs 15-Year 245 MW AI Data Center Lease at River Bend Campus",
     "date": "2025-12-17",
     "tier": 1
    },
    {
     "url": "https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center",
     "title": "Hut 8 selects Entergy, Southeast Louisiana for $10 billion AI data center",
     "date": "2025-12-17",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/hut-8-selling-325bn-in-bonds-to-finance-google-and-anthropic-backed-river-bend-ai-data-center-campus/",
     "title": "Hut 8 selling $3.25bn in bonds to finance Google and Anthropic-backed River Bend campus",
     "date": "2026-04-29",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://canada.hut8.com/resources/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value-of-usd7-0-billion",
     "note": "River Bend campus in West Feliciana Parish (St. Francisville), LA confirmed: 245MW leased to Fluidstack (Google as financial backstop, not tenant-operator), $7.0B TCV, Q2 2027 first data hall commissioning -- all match."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Beaver Dam Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Beaver Dam",
   "region": "Wisconsin",
   "country": "USA",
   "lat": 43.458,
   "lng": -88.837,
   "coord_precision": "town",
   "mw_planned": 220,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Announced 2025 (initially $837M report); 520 acres; under construction; opens 2027",
   "capex_usd_b": 1,
   "power_notes": "Alliant Energy; PSC-approved contract with 10-year minimum; $200M transmission line; Meta $15M to Alliant Hometown Care fund",
   "chips_notes": "Not disclosed",
   "notes": "220 MW figure from UW-Madison CROWE report (Aug 2026).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://crowe.wisc.edu/wp-content/uploads/sites/633/2026/08/DataCenters.pdf",
     "title": "UW-Madison CROWE - Who Should Pay for Wisconsin's Data Center Buildout (220 MW, $1B, opens 2027)",
     "date": "2026-08",
     "tier": 1
    },
    {
     "url": "https://datacenters.atmeta.com/asset/beaver-dam-data-center-info-sheet/",
     "title": "Meta Beaver Dam Data Center info sheet ($1B+)",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://www.wpr.org/news/4-wisconsin-communities-signed-secrecy-deals-billion-dollar-data-centers",
     "title": "WPR - four Wisconsin communities signed secrecy deals (Beaver Dam 520 acres)",
     "date": "2026-01-26",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.wpr.org/news/4-wisconsin-communities-signed-secrecy-deals-billion-dollar-data-centers",
     "note": "Meta's Beaver Dam, WI project confirmed: 520 acres, ~$1B investment, under construction as of early 2026, expected to open 2027; the 220MW figure was not independently verifiable in this source but is not contradicted."
    }
   ],
   "verified": true
  },
  {
   "name": "Vantage Silicon Heartland campus (New Albany)",
   "operator": "Vantage Data Centers",
   "tenant": "",
   "city": "New Albany, Licking County",
   "region": "Ohio",
   "country": "USA",
   "lat": 40.1,
   "lng": -82.76,
   "coord_precision": "town",
   "mw_planned": 216,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Announced Jul 2024: $185M initial investment (up to $75M equipment); 190 acres; up to six buildings at 36 MW critical load each; AEP 300 MVA N+1 substation delivery Q4 2024.",
   "capex_usd_b": 0.185,
   "power_notes": "AEP Ohio (PJM); dedicated 300 MVA N+1 substation.",
   "chips_notes": "",
   "notes": "mw_planned = 6 x 36 MW as described by DCF; Vantage did not state a single campus total. Construction status as of 2026 not sourced.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://www.datacenterfrontier.com/site-selection/article/55091801/vantage-data-centers-augments-new-albany-ohio-data-center-boom",
     "title": "Vantage Data Centers Augments New Albany, Ohio Data Center Boom",
     "date": "2024-07-12",
     "tier": 2
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://www.datacenterfrontier.com/site-selection/article/55091801/vantage-data-centers-augments-new-albany-ohio-data-center-boom",
     "note": "DCF (tier 2, Jul 12 2024) confirms $185M investment, up to six buildings at 36 MW critical load (=216 MW), 190-acre Silicon Heartland campus, AEP 300 MVA N+1 substation Q4 2024. Note 216 MW is critical IT load. Status: Vantage's newsroom (checked Sep 2 2026) has no New Albany construction/opening re"
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "AdaniConneX Visakhapatnam Integrated Data Center & Tech Park (Madhurawada)",
   "operator": "AdaniConneX",
   "tenant": "Multi-tenant hyperscale (Google is the anchor of the wider Vizag program)",
   "city": "Visakhapatnam",
   "region": "Andhra Pradesh",
   "country": "India",
   "lat": 17.82,
   "lng": 83.35,
   "coord_precision": "town",
   "mw_planned": 200,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "MoU/announcement May 2023; 60-acre site with 20 acres for the data center; no completion date published",
   "capex_usd_b": 0.85,
   "power_notes": "Adani Green renewable supply intended; Andhra grid",
   "chips_notes": "Not disclosed",
   "notes": "Rs 70 bn (~$0.85B) investment. May be partially superseded/absorbed by the Google-AdaniConneX 1 GW program; treat as overlapping.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://w.media/india-to-get-its-first-integrated-data-center-in-andhra-pradesh/",
     "title": "India to get its first Integrated Data center in Andhra Pradesh (200+ MW, Rs 70 bn)",
     "date": "2023-05-08",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/adaniconnex-to-build-200mw-data-center-campus-in-andhra-pradesh-india/",
     "title": "AdaniConneX to build 200MW data center campus in Andhra Pradesh, India",
     "date": "2023-05",
     "tier": 2
    }
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 1,
     "evidence_url": "https://www.googlecloudpresscorner.com/2026-04-28-Google-Breaks-Ground-on-India-AI-Hub,-Launching-a-National-Industrial-Ecosystem-Alongside-Indias-Digital-Infrastructure-Milestone",
     "note": "Google's own press release confirms it broke ground 28 Apr 2026 (at Tarluvada, AP) with AdaniConneX/Nxtra building the data-centre infrastructure for the ~1GW Vizag AI hub the row itself ties this campus to, so status has moved past 'announ"
    }
   ],
   "verified": true
  },
  {
   "name": "Bridge Data Centres MY07 (Ulu Tiram)",
   "operator": "Bridge Data Centres",
   "tenant": "Cloud/AI compute operators (ByteDance expected; not confirmed)",
   "city": "Ulu Tiram",
   "region": "Johor",
   "country": "Malaysia",
   "lat": 1.6,
   "lng": 103.82,
   "coord_precision": "town",
   "mw_planned": 200,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "400 MW TNB electricity supply agreement 29 Nov 2024 ('deployment within 12 months'); multi-phase build",
   "capex_usd_b": null,
   "power_notes": "400 MW TNB ESA; first partner under TNB CRESS renewable scheme",
   "chips_notes": "Not disclosed",
   "notes": "200+ MW IT load figure per DCD/BDC; 400 MW is utility supply, not IT.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://w.media/tnb-and-bridge-data-centres-ink-400mw-power-deal-to-boost-malaysias-digital-hub-status/",
     "title": "TNB and Bridge Data Centres ink 400MW power deal (MY07, Ulu Tiram)",
     "date": "2024-11-29",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/bridge-data-centres-acquires-20-acres-in-johor-malaysia/",
     "title": "Bridge Data Centres acquires 20 acres in Johor, Malaysia (MY07 >200MW IT)",
     "date": "2024",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.digitalnewsasia.com/business/bridge-data-centres-tnb-sign-my07-400mw-deal-and-green-energy-partnership-boosting-malaysia",
     "note": "MY07 in Ulu Tiram, Johor is confirmed currently under construction with the 400MW TNB electricity agreement (IT load reported elsewhere as 200MW+ across phases), matching the row's location, operator and status."
    }
   ],
   "verified": true
  },
  {
   "name": "QTS Hillsboro 2",
   "operator": "QTS Data Centers",
   "tenant": "Multi-tenant / hyperscale (Meta build-to-suit reported)",
   "city": "Hillsboro",
   "region": "Oregon",
   "country": "USA",
   "lat": 45.5475,
   "lng": -122.9335,
   "coord_precision": "site",
   "mw_planned": 180,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Four buildings on 51 acres (NE Huffman St); one of three QTS Hillsboro campuses; Hillsboro enacted 120-day data center moratorium Jul 27, 2026",
   "capex_usd_b": null,
   "power_notes": "Portland General Electric",
   "chips_notes": "Not disclosed",
   "notes": "180 MW+ is QTS's stated critical capacity for Hillsboro 2 only; tier-3 trackers cite ~300 MW across QTS Hillsboro (omitted).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://q.com/data-centers/hillsboro-2/",
     "title": "QTS - Hillsboro 2 (180 MW+, 51 acres, four buildings)",
     "date": "2026",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://q.com/data-centers/hillsboro-2/",
     "note": "QTS's own site confirms Hillsboro 2 is a 180MW+, 51-acre, four-building campus at NE Huffman St, Hillsboro OR, and independent reporting confirms it is fully operational."
    }
   ],
   "verified": true
  },
  {
   "name": "Novva Salt Lake City (West Jordan) campus",
   "operator": "Novva Data Centers",
   "tenant": "Phase 1 fully leased to an undisclosed major tech company",
   "city": "West Jordan",
   "region": "Utah",
   "country": "USA",
   "lat": 40.59,
   "lng": -112.03,
   "coord_precision": "town",
   "mw_planned": 175,
   "mw_operational": 75,
   "status": "operating",
   "timeline": "Phase 1 (~75MW) operational 2023; Phase 2 (72MW) started Dec 2023 and Phase 3 (72MW) Jan 2024, both due 2026; $2B J.P. Morgan/Starwood financing closed Mar 5 2025.",
   "capex_usd_b": null,
   "power_notes": "Rocky Mountain Power service territory (utility not confirmed by company); direct-to-chip liquid cooling, water-free ambient cooling.",
   "chips_notes": "Not disclosed.",
   "notes": "100-acre campus, ~1M sq ft. Novva's original 2020 release cited >$1B across phases.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.publicpower.org/periodical/article/companies-get-2-billion-financing-commitment-complete-utah-data-center",
     "title": "Companies Get $2 Billion Financing Commitment to Complete Utah Data Center (APPA)",
     "date": "2025-03-07",
     "tier": 2
    },
    {
     "url": "https://www.novva.com/media-center/utah-data-center/",
     "title": "Novva Announces Utah Data Center Launch",
     "date": "2020-07-20",
     "tier": 1
    },
    {
     "url": "https://www.enr.com/articles/60451-novva-secures-2b-to-complete-utah-data-center-campus-construction",
     "title": "Novva Secures $2B to Complete Utah Data Center Campus Construction (ENR)",
     "date": "2025-03",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.enr.com/articles/60451-novva-secures-2b-to-complete-utah-data-center-campus-construction",
     "note": "ENR confirms Phase 1 (~75MW, operating since 2023) plus Phases 2 and 3 (72MW each, under construction, both due 2026) giving a 175MW total campus, exactly matching the row."
    }
   ],
   "verified": true
  },
  {
   "name": "Reliance-Meta Jamnagar AI Data Centre (168 MW)",
   "operator": "Reliance Industries",
   "tenant": "Meta Platforms (built-to-suit lease)",
   "city": "Jamnagar",
   "region": "Gujarat",
   "country": "India",
   "lat": 22.4707,
   "lng": 70.0577,
   "coord_precision": "town",
   "mw_planned": 168,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Announced 10 Jun 2026; 168 MW to be delivered within two years (~mid-2028), with option to scale",
   "capex_usd_b": null,
   "power_notes": "100% renewable power supplied by RIL (Kutch solar platform per press); cooled with desalinated seawater; Meta pays full energy/water cost",
   "chips_notes": "Not disclosed",
   "notes": "Meta's first built-to-suit capacity in India; RIL provides design, build, utilities and managed services. Likely sits within the broader Jamnagar campus (row above) - do not double-count.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.ril.com/sites/default/files/2026-06/10062026_MR_Reliance_and_Meta_to_Develop_AI-Enabled_Data_Centre_in_Jamnagar_Gujarat.pdf",
     "title": "RIL press release: Reliance and Meta to Develop AI-Enabled Data Centre in Jamnagar",
     "date": "2026-06-10",
     "tier": 1
    },
    {
     "url": "https://datacenters.atmeta.com/2026/06/bringing-ai-enabled-infrastructure-to-india/",
     "title": "Meta Data Centers: Bringing AI-Enabled Infrastructure to India",
     "date": "2026-06-10",
     "tier": 1
    },
    {
     "url": "https://www.pv-magazine-india.com/2026/06/10/reliance-meta-to-develop-168-mw-ai-data-centre-powered-by-renewable-energy-in-jamnagar/",
     "title": "Reliance, Meta to develop 168 MW AI data centre powered by renewable energy",
     "date": "2026-06-10",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://about.fb.com/news/2026/06/meta-partners-with-reliance-on-ai-enabled-data-center-in-india/",
     "note": "Meta's own newsroom and RIL's press release confirm the 168MW Jamnagar, Gujarat build-to-suit deal announced 10 Jun 2026 with delivery within two years, matching the row exactly."
    }
   ],
   "verified": true
  },
  {
   "name": "Fluidstack / Anthropic Abernathy (Hale County)",
   "operator": "Fluidstack",
   "tenant": "Anthropic",
   "city": "Abernathy",
   "region": "Texas",
   "country": "USA",
   "lat": 33.8323,
   "lng": -101.8429,
   "coord_precision": "town",
   "mw_planned": 168,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Anthropic/Fluidstack $50B US plan announced Nov 2025 with Texas and New York sites 'coming online throughout 2026'; Cleanview lists Abernathy site operational 2027",
   "capex_usd_b": null,
   "power_notes": "ERCOT (Lubbock area); details not disclosed",
   "chips_notes": "Not disclosed",
   "notes": "Texas site identity (Abernathy, 240 MW, 120 acres) comes only from Cleanview (tier 3) - MW left null. $50B is Anthropic's national program, not site capex.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://fluidstack.io/blog/fluidstack-selected-by-anthropic-to-deliver-custom-data-centers-in-the-us",
     "title": "Fluidstack selected by Anthropic to deliver custom data centers in the US",
     "date": "2025-11-12",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/anthropic-plans-50bn-us-data-center-spend-starting-with-fluidstack-sites-in-texas-and-new-york/",
     "title": "Anthropic plans $50bn US data center spend, starting with Fluidstack sites in Texas and New York",
     "date": "2025-11-12",
     "tier": 2
    },
    {
     "url": "https://cleanview.co/data-centers/texas/1875/abernathy-data-center-fluidstack--anthropic",
     "title": "Cleanview: Abernathy Data Center (Fluidstack / Anthropic)",
     "date": "2026",
     "tier": 3
    }
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/anthropic-plans-50bn-us-data-center-spend-starting-with-fluidstack-sites-in-texas-and-new-york/",
     "note": "DCD identifies the Anthropic/Fluidstack Texas site as the previously announced 168MW Abernathy facility co-developed with TeraWulf, so mw_planned should be 168 rather than null."
    }
   ],
   "verified": true
  },
  {
   "name": "Vantage AZ1 Goodyear",
   "operator": "Vantage Data Centers",
   "tenant": "Hyperscale customers (undisclosed)",
   "city": "Goodyear",
   "region": "Arizona",
   "country": "USA",
   "lat": 33.452,
   "lng": -112.393,
   "coord_precision": "site",
   "mw_planned": 160,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Land 2019; Phase I complete Nov 2021; Phase II groundbreaking Oct 2022 for spring 2024; AZ15 (48 MW, 2028) in concept per city (tier 1 page not retrievable)",
   "capex_usd_b": 1.5,
   "power_notes": "APS",
   "chips_notes": "Not disclosed",
   "notes": "50-acre campus at Van Buren St & Bullard Ave; 160 MW IT across AZ11-AZ14, >1M sq ft. Operational MW not disclosed. $1.5B investment per City of Goodyear (page fetch blocked; figure also in search snippet).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-goodyear-expansion-in-arizona/",
     "title": "Vantage breaks ground on Goodyear expansion in Arizona",
     "date": "2022-10-19",
     "tier": 2
    },
    {
     "url": "https://www.goodyearaz.gov/Home/Components/News/News/12503/",
     "title": "Vantage Data Centers Phase Two in Goodyear (City of Goodyear)",
     "date": "2022",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-purchases-100-acres-next-to-existing-data-center-campus-in-goodyear-arizona/",
     "title": "Microsoft purchases 100 acres next to existing data center campus in Goodyear, Arizona",
     "date": "2026-06",
     "tier": 2
    },
    {
     "url": "https://www.aztechcouncil.org/microsoft-buys-land-el-mirage-data-center/",
     "title": "Microsoft acquires nearly 300 acres for data center growth in El Mirage (AZ Tech Council)",
     "date": "2024-05-31",
     "tier": 3
    }
   ],
   "verified": true,
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.goodyearaz.gov/Home/Components/News/News/12503/",
     "note": "City of Goodyear press release confirms Vantage's 160MW, $1.5B AZ1 campus with Phase II groundbreaking Oct 2022 targeting spring 2024 completion; campus is operating today."
    }
   ],
   "tier": "verified"
  },
  {
   "name": "Firmus Project Southgate - Melbourne AI Factory",
   "operator": "Firmus Technologies (with CDC Data Centres)",
   "tenant": "Undisclosed 'leading global technology platform' (multi-billion contract); Nvidia DGX Cloud region",
   "city": "Melbourne",
   "region": "Victoria",
   "country": "Australia",
   "lat": -37.8136,
   "lng": 144.9631,
   "coord_precision": "town",
   "mw_planned": 150,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Announced Oct 2025 (A$4.5B initial program); targeted operational by Apr 2026; hyperscale customer contract 2 Mar 2026",
   "capex_usd_b": 3,
   "power_notes": "100% renewable claimed; Southgate program linked to up to 5.1 GW of new wind/solar/storage/hydro; Blackstone-led US$10B debt facility",
   "chips_notes": "~18,400-18,500 Nvidia GB300 GPUs (Grace-Blackwell)",
   "notes": "Capex is A$4.5B (~US$3.0B) for the initial Southgate program (Melbourne + Tasmania stage). Exact Melbourne site not published. Whether 150 MW was live by Sep 2026 not confirmed.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://firmus.co/newsroom/southgate-expansion",
     "title": "Firmus expands Project Southgate across Australia (Melbourne 150 MW, 18,500 GB300, 1.6 GW by 2028)",
     "date": "2025-10",
     "tier": 1
    },
    {
     "url": "https://firmus.co/newsroom/firmus-signs-multi-year-agreement-with-global-hyperscale-customer-at-project-southgate",
     "title": "Firmus signs multi-year agreement with global hyperscale customer at Project Southgate (Melbourne, ~18,400 GB300)",
     "date": "2026-03-02",
     "tier": 1
    },
    {
     "url": "https://thenextweb.com/news/firmus-asx-ipo-blackstone-ai-data-center-australia",
     "title": "Nvidia-backed Firmus targets $2bn ASX IPO after $505m raise",
     "date": "2026-04-07",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://firmus.co/newsroom/southgate-expansion",
     "note": "Firmus's own newsroom confirms a 150MW Melbourne Southgate build under construction as part of the A$4.5B first stage, targeted operational around Q1-Apr 2026 with a signed hyperscale customer contract, matching the row."
    }
   ],
   "verified": true
  },
  {
   "name": "Vantage CWL1 Newport Campus (Nebius UK deployment)",
   "operator": "Vantage Data Centers",
   "tenant": "Nebius",
   "city": "Newport",
   "region": "Wales",
   "country": "United Kingdom",
   "lat": 51.5721,
   "lng": -3.081,
   "coord_precision": "site",
   "mw_planned": 148,
   "mw_operational": 148,
   "status": "operating",
   "timeline": "Existing 148MW campus (formerly Next Generation Data); Nebius deployment announced Aug 13, 2026 as the first announced commercial capacity commitment in the South Wales AI Growth Zone",
   "capex_usd_b": null,
   "power_notes": "46-acre site, three data centers, ~2M sq ft",
   "chips_notes": "High-density NVIDIA-powered AI infrastructure for Nebius",
   "notes": "Fulfills Nebius's UK footprint alongside its NJ, Kansas City and Finland sites (NJ and Finland already tracked in this dataset; Kansas City added above).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://vantage-dc.com/news/vantage-data-centers-and-nebius-expand-uk-ai-infrastructure-with-first-deployment-in-south-wales-ai-growth-zone/",
     "title": "Vantage Data Centers and Nebius Expand UK AI Infrastructure with First Deployment in South Wales AI Growth Zone",
     "date": "2026-08-13",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/nebius-to-lease-data-center-capacity-from-vantage-in-newport-wales/",
     "title": "Nebius to lease data center capacity from Vantage in Newport, Wales",
     "date": "2026-08",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Nebius Mäntsälä AI data centers",
   "operator": "Nebius",
   "tenant": "",
   "city": "Mäntsälä",
   "region": "Uusimaa",
   "country": "Finland",
   "lat": 60.635,
   "lng": 25.32,
   "coord_precision": "town",
   "mw_planned": 145,
   "mw_operational": 75,
   "status": "operating",
   "timeline": "Tripled to 75MW (announced Oct 2024, completed by early 2026); second 70MW data center coming online from 2027 (announced Aug 2026)",
   "capex_usd_b": null,
   "power_notes": "Low-carbon Finnish grid; PUE 1.1; ~20,000 MWh/yr heat recovered for district heating",
   "chips_notes": "Up to 60,000 GPUs at 75MW site (NVIDIA H200, Blackwell)",
   "notes": "Nebius total Finland pipeline 455MW across three sites (Mäntsälä x2 + Lappeenranta).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw",
     "title": "Nebius to triple capacity at Finland data center to 75MW",
     "date": "2024-10-08",
     "tier": 1
    },
    {
     "url": "https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland",
     "title": "Nebius to construct 310MW AI factory in Finland",
     "date": "2026-03-31",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/nebius-expands-european-presence-announces-deployment-in-estonia-and-second-data-center-in-m%C3%A4nts%C3%A4l%C3%A4-finland/",
     "title": "DCD: Nebius second data center in Mäntsälä",
     "date": "2026-08-13",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw",
     "note": "Nebius's own newsroom confirms Mäntsälä tripled to 75MW (operational), consistent with the row's 75MW operational figure and second-facility expansion plans bringing the total to 145MW."
    }
   ],
   "verified": true
  },
  {
   "name": "EdgeCore Loudoun County campus",
   "operator": "EdgeCore Digital Infrastructure",
   "tenant": "Hyperscale (undisclosed)",
   "city": "Sterling, Loudoun County",
   "region": "Virginia",
   "country": "USA",
   "lat": 39.03,
   "lng": -77.43,
   "coord_precision": "town",
   "mw_planned": 114,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Under construction as of H1 2025 per CBRE; delivery dates not stated.",
   "capex_usd_b": null,
   "power_notes": "Dominion/NOVEC (PJM).",
   "chips_notes": "",
   "notes": "CBRE identifies only 'Loudoun County'; Sterling coordinates are approximate (town precision). Same CBRE profile notes AWS bought 97 acres in Leesburg (no MW).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.cbre.com/insights/local-response/north-america-data-center-trends-h1-2025-market-profiles-northern-virginia",
     "title": "CBRE North America Data Center Trends H1 2025 – Northern Virginia",
     "date": "2025-09-08",
     "tier": 1
    },
    {
     "url": "https://www.compassdatacenters.com/why-northern-virginia/",
     "title": "Compass: Northern Virginia Still Tops Global Data Center Markets",
     "date": "2025",
     "tier": 1
    },
    {
     "url": "https://www.datacenterfrontier.com/featured/article/11430375/compass-wins-approval-for-northern-virginia-data-center-campus",
     "title": "Compass Wins Approval for Northern Virginia Data Center Campus",
     "date": "2018-01-20",
     "tier": 2
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://edgecore.com/locations/northern-virginia/",
     "note": "CBRE H1 2025 NoVA profile (tier 1 research, Sep 8 2025): 'EdgeCore began construction on a 114-MW facility in Loudoun County.' EdgeCore's own site (tier 1) lists the Sterling campus (Maries/Moran Rd) at 114 MW critical IT load, two buildings, 685,000 sq ft, 17 acres, initial delivery late 2026; Edge"
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "Bridge Data Centres MY06 (Sedenak Tech Park)",
   "operator": "Bridge Data Centres (Bain Capital / Chindata)",
   "tenant": "ByteDance (anchor)",
   "city": "Sedenak, Kulai",
   "region": "Johor",
   "country": "Malaysia",
   "lat": 1.717,
   "lng": 103.583,
   "coord_precision": "site",
   "mw_planned": 110,
   "mw_operational": 110,
   "status": "operating",
   "timeline": "Phase 1 opened 20 Oct 2022 (built in ~314 days); three buildings on 38 acres to 110 MW",
   "capex_usd_b": null,
   "power_notes": "TNB grid",
   "chips_notes": "Not disclosed",
   "notes": "ByteDance announced ~$2.1B (MYR 10bn) AI hub plus $320M DC expansion in Malaysia (Jun 2024). Full 110 MW build-out status not independently confirmed; MY06 reported 'opened with 110MW' by DCD.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.mida.gov.my/media-release/bridge-data-centres-and-bytedance-celebrate-grand-opening-of-the-first-phase-hyperscale-data-centre-my06-in-johor-malaysia/",
     "title": "MIDA: Bridge Data Centres and ByteDance celebrate grand opening of MY06 (110 MW)",
     "date": "2022-10-20",
     "tier": 1
    },
    {
     "url": "https://www.mingtiandi.com/real-estate/data-centres/bytedance-eyes-2-4b-investment-in-malaysia-data-centres-ai-hub/",
     "title": "ByteDance eyes $2.4B for Malaysia data centres, AI hub",
     "date": "2024-06-10",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/tiktok-owner-bytedance-to-expand-malaysia-data-center-footprint-in-21bn-ai-deal/",
     "title": "ByteDance to expand Malaysia data center footprint in $2.1bn AI deal",
     "date": "2024-06",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.mida.gov.my/media-release/bridge-data-centres-and-bytedance-celebrate-grand-opening-of-the-first-phase-hyperscale-data-centre-my06-in-johor-malaysia/",
     "note": "MIDA (Malaysian government) press release confirms 110MW MY06 Phase 1 opened 20 Oct 2022 in Sedenak, Kulai, Johor, built in 314 days from a Nov 2021 groundbreak, with ByteDance as anchor tenant — matches the row exactly."
    }
   ],
   "verified": true
  },
  {
   "name": "SK-AWS Ulsan AI Data Center (Mipo National Industrial Complex)",
   "operator": "SK Group (SK Telecom / SK Broadband)",
   "tenant": "Amazon Web Services (AI zone, 15-year deal)",
   "city": "Ulsan",
   "region": "Ulsan",
   "country": "South Korea",
   "lat": 35.5384,
   "lng": 129.3114,
   "coord_precision": "town",
   "mw_planned": 103,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Launch ceremony 20 Jun 2025; groundbreaking 29 Aug 2025; 41 MW by Nov 2027 (H2 2027 ops); 103 MW by Feb 2029; SKT plans expansion to >1 GW long term",
   "capex_usd_b": 5.1,
   "power_notes": "KEPCO grid; SK Gas LNG cogeneration nearby; future floating offshore wind cited",
   "chips_notes": "60,000 GPUs planned (Korea Herald)",
   "notes": "KRW 7 trn (~$5.1B) total; AWS ~$4B share. Korea's largest AI DC to date.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.koreaherald.com/article/10514856",
     "title": "SK Group teams up with AWS for Korea's largest W7tr AI data center (103 MW, 60,000 GPUs)",
     "date": "2025-06-22",
     "tier": 2
    },
    {
     "url": "https://www.sktelecom.com/en/feature/feature_detail.do?idx=32&currentPage=1&type=&keyword=",
     "title": "SKT: SK-AWS Ulsan AI Data Center to be key hub",
     "date": "2025-06",
     "tier": 1
    },
    {
     "url": "https://www.koreaherald.com/article/10798417",
     "title": "SK Telecom targets 15 GW AI data center capacity by 2035 (Ulsan ops H2 2027, >1 GW)",
     "date": "2026-07-05",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.koreaherald.com/article/10514856",
     "note": "Korea Herald confirms the SK-AWS Ulsan (Mipo) AI data center as a ~7 trillion won (~US$5.1B) project with an Aug 2025 groundbreaking and phased 41MW/103MW capacity targets, matching the row including the capex figure."
    }
   ],
   "verified": true
  },
  {
   "name": "Humain Riyadh AI Data Center",
   "operator": "Humain (PIF)",
   "tenant": "Humain cloud; AMD–Cisco–Humain JV first 100MW (MI450) expected here or Dammam",
   "city": "Riyadh",
   "region": "Riyadh Province",
   "country": "Saudi Arabia",
   "lat": 24.7136,
   "lng": 46.6753,
   "coord_precision": "town",
   "mw_planned": 100,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Ground broken Aug 2025; go-live targeted Q2 2026 (not confirmed by primary source as of 2026-09-01); Humain targets 1.9GW by 2030 and ~6–6.6GW within a decade",
   "capex_usd_b": null,
   "power_notes": "Utility/grid arrangements not disclosed. Climate researchers flag extreme-heat cooling concerns (DCD).",
   "chips_notes": "18,000 NVIDIA GB300 purchased with 'several hundred thousand' more on order (Humain CEO, Aug 2025); Qualcomm AI200 racks (1,024 accelerators) deployed Mar 2026 with Adobe as first customer",
   "notes": "Exact plot not disclosed; Humain has secured 211 plots kingdom-wide. Also STC/center3 JV targeting 1GW (250MW start).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.cnbc.com/2025/11/19/musks-xai-will-be-customer-for-nvidia-data-center-in-saudi-arabia.html",
     "title": "CNBC: xAI will be first customer for Nvidia-backed data center in Saudi Arabia",
     "date": "2025-11-19",
     "tier": 2
    },
    {
     "url": "https://w.media/elon-musks-xai-to-build-500-mw-data-center-in-saudi-arabia/",
     "title": "W.Media: xAI and HUMAIN to build 500MW data center",
     "date": "2025-11-20",
     "tier": 3
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/",
     "title": "DCD: Humain breaks ground on two data centers, first facilities Q2 2026",
     "date": "2025-08-26",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/humain-secures-211-plots-of-land-in-saudi-arabia-for-data-centers/",
     "title": "DCD: Humain secures 211 plots of land",
     "date": "2026",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/amd-cisco-and-humain-set-up-jv-for-1gw-of-ai-infrastructure-in-saudi-arabia/",
     "title": "DCD: AMD, Cisco and Humain JV for 1GW",
     "date": "2025-11-20",
     "tier": 2
    },
    {
     "url": "https://capacityglobal.com/news/humain-data-centre-construction-saudi-arabia/",
     "title": "Capacity: How Humain plans to use US chips",
     "date": "2025-08-26",
     "tier": 3
    }
   ],
   "verified": true,
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/humain-secures-211-plots-of-land-in-saudi-arabia-for-data-centers/",
     "note": "DCD reporting on the Riyadh site's August 2025 groundbreaking cites only a 100MW initial phase there, while the 500MW figure actually belongs to a separate xAI-Humain-Nvidia deal whose site location DCD says remains undisclosed."
    }
   ],
   "tier": "verified",
   "corrected": true
  },
  {
   "name": "Humain Dammam AI Data Center",
   "operator": "Humain (PIF)",
   "tenant": "Humain cloud; possible host of AMD–Cisco–Humain 100MW phase 1",
   "city": "Dammam",
   "region": "Eastern Province",
   "country": "Saudi Arabia",
   "lat": 26.4207,
   "lng": 50.0888,
   "coord_precision": "town",
   "mw_planned": 100,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Ground broken Aug 2025; go-live targeted Q2 2026 (unconfirmed as of 2026-09-01)",
   "capex_usd_b": null,
   "power_notes": "Not disclosed",
   "chips_notes": "Shares Humain's 18,000 GB300 initial allocation with Riyadh; AMD MI450 via JV",
   "notes": "Exact site not disclosed; plotted at Dammam.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/",
     "title": "DCD: Humain breaks ground on two data centers",
     "date": "2025-08-26",
     "tier": 2
    },
    {
     "url": "https://fastcompanyme.com/news/saudi-arabias-humain-begins-building-first-ai-data-centers-ahead-of-2026-launch/",
     "title": "Fast Company ME: Humain begins building first AI data centers",
     "date": "2025-08-27",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/",
     "note": "DCD confirms Humain broke ground Aug 2025 on a 100MW-initial-capacity Dammam facility targeted for Q2 2026 go-live; row's hedge that go-live is unconfirmed as of Sept 2026 is appropriate given chip-delivery uncertainty noted in the same art"
    }
   ],
   "verified": true
  },
  {
   "name": "Nscale Loughton AI Campus",
   "operator": "Nscale",
   "tenant": "Microsoft (Azure) – UK's largest supercomputer",
   "city": "Loughton",
   "region": "Essex, England",
   "country": "United Kingdom",
   "lat": 51.6452,
   "lng": 0.0553,
   "coord_precision": "town",
   "mw_planned": 90,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Site bought early 2025; 50MW initial scalable to 90MW; GPU delivery Q1 2027 (originally late 2026); 90MW grid connection reportedly not ready for 2027 opening",
   "capex_usd_b": null,
   "power_notes": "UK grid connection (90MW) delayed; Nscale exploring Bloom Energy solid-oxide fuel cells as bridge power (Data Centre Review, Jul 2026)",
   "chips_notes": "23,040 NVIDIA GB300 GPUs for Microsoft; facility described as able to host up to 45,000 GB200",
   "notes": "Guardian (via TNW, Jul 2026) reported little visible construction and land-registry ownership questions; Nscale secured $900M credit facility. £2bn project cost reported by tier-3 only (not entered).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.nscale.com/press-releases/nscale-uk-ai-infrastructure-announcement",
     "title": "Nscale UK AI infrastructure commitment",
     "date": "2025-09-16",
     "tier": 1
    },
    {
     "url": "https://www.nscale.com/press-releases/nscale-microsoft-2025",
     "title": "Nscale–Microsoft ~200,000 GB300 contract",
     "date": "2025-10-15",
     "tier": 1
    },
    {
     "url": "https://blogs.microsoft.com/on-the-issues/2025/09/16/microsoft-30-billion-uk-ai-future/",
     "title": "Microsoft invests $30 billion in UK",
     "date": "2025-09-16",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/nscale-partners-with-bt-for-more-uk-data-centers/",
     "title": "DCD: Nscale partners with BT for more UK data centers",
     "date": "2026-04-23",
     "tier": 2
    },
    {
     "url": "https://datacentrereview.com/2026/07/nscales-2bn-essex-data-centre-hit-by-grid-delays/",
     "title": "Data Centre Review: Nscale Essex data centre hit by grid delays",
     "date": "2026-07-14",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://datacentrereview.com/2026/07/nscales-2bn-essex-data-centre-hit-by-grid-delays/",
     "note": "Multiple tier-2 outlets confirm the Microsoft-anchored Loughton, Essex site is under construction with its 90MW grid connection delayed from late 2026 to 2027, matching the row."
    }
   ],
   "verified": true
  },
  {
   "name": "Stargate Korea - Jeonnam (SK Telecom / OpenAI)",
   "operator": "SK Telecom (SK Group)",
   "tenant": "OpenAI (Stargate)",
   "city": "Jeonnam (site undisclosed)",
   "region": "South Jeolla (Jeollanam-do)",
   "country": "South Korea",
   "lat": 34.816,
   "lng": 126.463,
   "coord_precision": "town",
   "mw_planned": 20,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "MoU Oct 2025; 20 MW initial; groundbreaking was being discussed for ~Mar 2026 (unconfirmed); SKT says southwest region to host 1 GW longer term",
   "capex_usd_b": null,
   "power_notes": "KEPCO grid; SKT cites nuclear/LNG access and Jeonnam renewables",
   "chips_notes": "Not disclosed; SK hynix HBM supply up to 900k DRAM wafers/month for Stargate globally",
   "notes": "Coordinates are the Jeonnam provincial seat (Muan) as a placeholder - exact site not published. SKT's Jul-2026 plan targets 15 GW nationally by 2035 (5 GW from 2029).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.asiae.co.kr/en/article/2026021115561476013",
     "title": "OpenAI accelerates collaboration with Samsung and SK... Korea data center groundbreaking (20 MW each, Jeonnam & Pohang)",
     "date": "2026-02-11",
     "tier": 2
    },
    {
     "url": "https://eng.sk.com/news/sk-group-partners-with-openai-to-advance-global-ai-infrastructure",
     "title": "SK Group partners with OpenAI to advance global AI infrastructure",
     "date": "2025-10-01",
     "tier": 1
    },
    {
     "url": "https://www.koreaherald.com/article/10798417",
     "title": "SK Telecom targets 15 GW AI data center capacity by 2035",
     "date": "2026-07-05",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.asiae.co.kr/en/article/2026021115561476013",
     "note": "Confirms a 20MW initial Stargate Korea site in Jeonnam (Jeollanam-do) via an SK Telecom/OpenAI JV, with groundbreaking tentatively discussed for around Mar 2026 but explicitly unconfirmed — matching the row's hedged status."
    }
   ],
   "verified": true
  },
  {
   "name": "Stargate Korea - Pohang (Samsung SDS / OpenAI)",
   "operator": "Samsung SDS (design/build/operate); Samsung C&T / Samsung Heavy Industries (floating DC concept)",
   "tenant": "OpenAI (Stargate)",
   "city": "Pohang",
   "region": "North Gyeongsang",
   "country": "South Korea",
   "lat": 36.019,
   "lng": 129.343,
   "coord_precision": "town",
   "mw_planned": 20,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "LOI Oct 2025; 20 MW initial; groundbreaking discussed for ~Mar 2026 (unconfirmed); offshore/floating DC in early technical study",
   "capex_usd_b": null,
   "power_notes": "KEPCO grid; Pohang cited for power availability and Japan subsea links",
   "chips_notes": "Samsung Electronics memory supply; no GPU count disclosed",
   "notes": "Separate from the 2023 KEPCO/SK ecoplant 120 MW Pohang project. Exact site not published.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.asiae.co.kr/en/article/2026021115561476013",
     "title": "OpenAI accelerates collaboration with Samsung and SK... Korea data center groundbreaking",
     "date": "2026-02-11",
     "tier": 2
    },
    {
     "url": "https://www.tribuneindia.com/news/business/openais-stargate-project-moves-ahead-with-samsung-and-sk-in-south-korea/amp",
     "title": "OpenAI's Stargate Project moves ahead with Samsung and SK in South Korea",
     "date": "2025-12-05",
     "tier": 2
    },
    {
     "url": "https://openai.com/index/samsung-and-sk-join-stargate/",
     "title": "Samsung and SK join OpenAI's Stargate initiative",
     "date": "2025-10-01",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.asiae.co.kr/en/article/2026021115561476013",
     "note": "Confirms a 20MW initial Stargate Korea site in Pohang, North Gyeongsang via a Samsung SDS/OpenAI JV, with groundbreaking uncertain, matching the row; Pohang coordinates are accurate."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Mesa Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Mesa",
   "region": "Arizona",
   "country": "USA",
   "lat": 33.348,
   "lng": -111.635,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "396 acres at Elliot & Ellsworth bought 2021; $800M two-building phase 1 broke ground Aug 2021; May 2022 expansion to five buildings / 2.5M sq ft; first two buildings operational Jan 30 2025; full completion 2026.",
   "capex_usd_b": 1,
   "power_notes": "Salt River Project (SRP); 450MW new solar via SRP; Ørsted hybrid solar+storage plant offsets most of the 300MW campus load.",
   "chips_notes": "Not disclosed.",
   "notes": "capex '>$1B' per Meta.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw",
     "title": "EdgeCore Announces Expansion of Its Metro Phoenix Data Center Market to Over 450 MW",
     "date": "2025-05-20",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/",
     "title": "EdgeCore expands Mesa data center campus in Arizona",
     "date": "2025-05-21",
     "tier": 2
    },
    {
     "url": "https://www.datacenterfrontier.com/hyperscale/article/55265250/meta-update-opens-mesa-arizona-data-center-unveils-major-subsea-cable-initiative-forges-oklahoma-wind-farm-ppa-more",
     "title": "Meta Update: Opens Mesa, Arizona Data Center (Data Center Frontier)",
     "date": "2025-02-24",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/orsted-commissions-hybrid-solar-plant-in-arizona-tied-to-meta-data-center/",
     "title": "Ørsted commissions hybrid solar plant in Arizona tied to Meta data center",
     "date": "2025",
     "tier": 2
    },
    {
     "url": "https://www.azbex.com/planning-development/meta-facebook-to-expand-mesa-data-center/",
     "title": "Meta (Facebook) to Expand Mesa Data Center (AZBEX)",
     "date": "2022-05-09",
     "tier": 3
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/google-breaks-ground-on-mesa-data-center-campus-in-arizona/",
     "title": "Google breaks ground on Mesa data center campus in Arizona",
     "date": "2023-07-12",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/google-files-to-build-second-data-center-at-mesa-campus-in-arizona/",
     "title": "Google files to build second data center at Mesa campus in Arizona",
     "date": "2024-04-10",
     "tier": 2
    },
    {
     "url": "https://azbex.com/planning-development/google-planning-next-phase-of-mesa-data-center-facility/",
     "title": "Google Planning Next Phase of Mesa Data Center Facility",
     "date": "2025-10-16",
     "tier": 3
    }
   ],
   "verified": false,
   "checks": [
    {
     "batch": 2,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/metas-mesa-arizona-data-center-comes-online/",
     "note": "DCD's own report on Meta's Mesa go-live gives no MW figure, and the row's 450MW/206MW figures instead appear to trace to EdgeCore's and/or Google's separate Mesa, Arizona campuses that are mixed into the row's own source list."
    }
   ],
   "tier": "reported",
   "corrected": true
  },
  {
   "name": "Google Pryor (North) - MidAmerica Industrial Park",
   "operator": "Google",
   "tenant": "Google",
   "city": "Pryor",
   "region": "Oklahoma",
   "country": "USA",
   "lat": 36.3084,
   "lng": -95.3169,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Building 1 operational Jul 2024 (53 MW); Building 2 retrofit 2025, operational Aug 2026 (Epoch).",
   "capex_usd_b": null,
   "power_notes": "Grand River Dam Authority (GRDA) / SPP grid. Capex is Epoch estimate.",
   "chips_notes": "Epoch: 28k TPU v5p + 67.1k TPU v5e (~763k H100e).",
   "notes": "Below 500 MW but Epoch ranks it the 3rd-largest US AI site by compute; included as a Google mega-site. All figures are Epoch estimates - Google discloses no MW.",
   "value_type": "estimate",
   "sources": [
    {
     "url": "https://epoch.ai/data/ai-data-centers/directory/google-pryor-north",
     "title": "Epoch AI - Google Pryor (North)",
     "date": "2026-09-01",
     "tier": 1
    }
   ],
   "tier": "reported",
   "corrected": true,
   "checks": [
    {
     "batch": 3,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://epoch.ai/data/ai-data-centers/directory/google-pryor-north",
     "note": "Existence/location (Google, Pryor OK/MidAmerica Industrial Park) is confirmed via Google/okcommerce.gov, but the specific 368MW and $13.9B figures are sourced solely from Epoch.ai's satellite-imagery-based modeling (tier 3) -- Google does n"
    }
   ],
   "verified": false
  },
  {
   "name": "Amazon (AWS) Keystone Trade Center campus",
   "operator": "Amazon Web Services",
   "tenant": "",
   "city": "Falls Township, Bucks County",
   "region": "Pennsylvania",
   "country": "USA",
   "lat": 40.136,
   "lng": -74.765,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Announced Jun 9, 2025 as second site of Amazon's $20B Pennsylvania plan; no completion date given.",
   "capex_usd_b": null,
   "power_notes": "PECO (Exelon) territory, PJM. No MW disclosed.",
   "chips_notes": "",
   "notes": "Former U.S. Steel Fairless Works site (Keystone Trade Center). $20B figure covers both PA sites; per-site capex and MW not disclosed. At least 1,250 permanent jobs across both sites.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.utilitydive.com/news/talen-amazon-aws-susquehanna-nuclear-data-centert/750440/",
     "title": "Talen to sell Amazon 1.9 GW from Susquehanna nuclear plant (notes $20B PA investment)",
     "date": "2025-06-11",
     "tier": 2
    },
    {
     "url": "https://fox56.com/news/local/amazon-to-spend-20b-on-data-centers-in-pa-including-one-next-to-nuclear-power-plant",
     "title": "Amazon to spend $20B on data centers in PA, including one next to nuclear power plant",
     "date": "2025-06-09",
     "tier": 3
    },
    {
     "url": "https://www.aboutamazon.com/news/aws/amazon-pennsylvania-investment-cloud-infrastructure-ai-innovation",
     "title": "Amazon plans to invest $20 billion in Pennsylvania",
     "date": "2025-06-09",
     "tier": 1
    },
    {
     "url": "https://www.constructiondive.com/news/amazon-pennsylvania-data-centers-invest/750284/",
     "title": "Amazon commits $20B for Pennsylvania data centers, training",
     "date": "2025-06-10",
     "tier": 2
    },
    {
     "url": "https://www.inquirer.com/business/amazon-data-centers-pennsylvania-20250609.html",
     "title": "Amazon will spend $20 billion to build data centers in Bucks and Luzerne counties",
     "date": "2025-06-09",
     "tier": 2
    },
    {
     "url": "https://lowerbuckstimes.com/2026/07/11/amazon-falls-township-data-center-community-grants-town-hall/",
     "title": "Amazon Falls Township data center community grants / town hall",
     "date": "2026-07-11",
     "tier": 3
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://www.utilitydive.com/news/talen-amazon-aws-susquehanna-nuclear-data-centert/750440/",
     "note": "No capacity figure exists to corroborate or refute. Utility Dive (tier 2, Jun 11 2025) confirms the $20B Pennsylvania plan; Fox56 (tier 3) confirms the second site is Keystone Trade Center, Fairless Hills/Falls Twp, no split of investment and no timeline. Status 'announced' with null MW is correct a"
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "QTS Salem Township campus (west of Susquehanna plant)",
   "operator": "QTS Data Centers (Blackstone)",
   "tenant": "",
   "city": "Salem Township, Luzerne County",
   "region": "Pennsylvania",
   "country": "USA",
   "lat": 41.08,
   "lng": -76.17,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "announced",
   "timeline": "1,700 acres assembled from ~100 sellers (reported Mar 2026); construction could start later in 2026; 12-17 facilities contemplated.",
   "capex_usd_b": null,
   "power_notes": "PPL territory, PJM; adjacent to Susquehanna nuclear station. MW not disclosed.",
   "chips_notes": "",
   "notes": "Land purchase >$500M (capex figure is land/initial, not full build). Same township overlay zone as Amazon campus.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/qts-acquires-1700-acres-of-land-in-pennsylvania-for-data-center-development/",
     "title": "QTS acquires 1,700 acres of land in Pennsylvania for data center development",
     "date": "2026-03-19",
     "tier": 2
    }
   ],
   "corrected": true,
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": false,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/qts-acquires-1700-acres-of-land-in-pennsylvania-for-data-center-development/",
     "note": "DCD (tier 2, Mar 19 2026) confirms ~1,700 acres from ~100 sellers via Salem Township Holdings LLC, 12-17 data centers reportedly contemplated, construction 'could start later this year'. However the >$500M figure is the LAND purchase price, not project capex; capex_usd_b=0.5 misrepresents it. No MW "
    },
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/qts-acquires-1700-acres-of-land-in-pennsylvania-for-data-center-development/",
     "note": "DCD confirms QTS acquired ~1,700 acres from close to 100 sellers in Salem Township, Luzerne County (west of the Susquehanna nuclear plant) for a possible 12-17 facilities, matching the row exactly."
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "Prince William Digital Gateway",
   "operator": "QTS Data Centers (GW Acquisition Co.) and Compass Datacenters (H&H Capital)",
   "tenant": "",
   "city": "Gainesville (Pageland Lane), Prince William County",
   "region": "Virginia",
   "country": "USA",
   "lat": 38.8,
   "lng": -77.57,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "cancelled",
   "timeline": "Comp-plan amendment Nov 2022; rezoning approved Dec 2023 (4-3); Circuit Court voided rezonings Aug 2025; Court of Appeals affirmed Mar 31, 2026; Compass withdrew Apr 29, 2026; QTS withdrew Supreme Court petitions Jul 2, 2026.",
   "capex_usd_b": 25,
   "power_notes": "Would have relied on Dominion (PJM); rezonings voided over public-notice failure, not power.",
   "chips_notes": "",
   "notes": "2,100-acre corridor next to Manassas National Battlefield; up to 23-27M sq ft, 37 buildings; ~$25B projected investment. MW never formally disclosed in fetched sources. Included because it was the largest planned NoVA campus and is now dead.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://virginiabusiness.com/prince-william-digital-gateway-data-center-project-officially-dies/",
     "title": "Prince William Digital Gateway data center project officially dies",
     "date": "2026-07-06",
     "tier": 2
    },
    {
     "url": "https://www.datacenterfrontier.com/hyperscale/article/55392482/when-buildability-breaks-what-prince-william-and-new-york-signal-for-data-center-development",
     "title": "When Buildability Breaks: What Prince William and New York Signal for Data Center Development",
     "date": "2026-07-23",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/compass-pulls-out-of-pw-digital-gateway-project-residents-sue-to-get-out-of-contracts-with-qts/",
     "title": "Compass pulls out of PW Digital Gateway project",
     "date": "2026-04-30",
     "tier": 2
    },
    {
     "url": "https://www.datacenterfrontier.com/site-selection/article/55126944/land-and-expand-virginia-data-centers",
     "title": "Land and Expand: Virginia Data Centers",
     "date": "2024-07-19",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/google-linked-corp-gets-green-light-for-181-acre-data-center-campus-in-pwc-northern-virginia/",
     "title": "Google-linked corp gets green light for 181-acre data center campus in PWC",
     "date": "2024",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-virginia-data-centers-plans-new-campus-in-chesterfield-county/",
     "title": "Google to invest $9bn in Virginia data centers",
     "date": "2025",
     "tier": 2
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/compass-pulls-out-of-pw-digital-gateway-project-residents-sue-to-get-out-of-contracts-with-qts/",
     "note": "Status 'cancelled' confirmed: Virginia Business (Jul 6 2026) reports QTS withdrew its Supreme Court petitions Jul 2 2026; DCD (tier 2, Apr 29 2026) confirms Compass exit, Court of Appeals affirmance in Apr 2026, Circuit Court voiding Aug 2025, 2,100 acres, ~37 buildings, QTS 11.3M + Compass 11.55M s"
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "Amazon Warrenton data center (Blackwell Road)",
   "operator": "Amazon Data Services",
   "tenant": "",
   "city": "Warrenton, Fauquier County",
   "region": "Virginia",
   "country": "USA",
   "lat": 38.729,
   "lng": -77.775,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Special-use permit granted Feb 16, 2023 (4-3); site plan approved Apr 2024; targeted 2027; Citizens for Fauquier County lawsuits still pending in Circuit Court (oral arguments 2026).",
   "capex_usd_b": 0.55,
   "power_notes": "Dominion (PJM); required new transmission through Fauquier (contested). MW not disclosed.",
   "chips_notes": "",
   "notes": "220,000 sq ft on 41.7 acres at Blackwell Rd & Lee Hwy; land bought for ~$40M. Fauquier is one of the 'emerging' NoVA counties per CBRE.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/amazon-granted-permit-for-warrenton-data-center-in-fauquier-county-virginia/",
     "title": "Amazon granted permit for Warrenton data center in Fauquier County, Virginia",
     "date": "2023-02-16",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/aws-hoping-to-buy-41-acres-in-fauquier-county-for-new-data-center/",
     "title": "AWS hoping to buy 41 acres in Fauquier County for new data center",
     "date": "2022",
     "tier": 2
    },
    {
     "url": "https://www.rappnews.com/land-use/judge-hears-arguments-in-lawsuit-seeking-to-halt-amazon-data-center-in-warrenton-9e942284",
     "title": "Judge hears arguments in lawsuit seeking to halt Amazon data center in Warrenton",
     "date": "2026",
     "tier": 3
    },
    {
     "url": "https://www.fauquiernow.com/news/warrenton-town-staff-approves-site-plan-for-220-000-square-foot-amazon-data-center-project/article_13b53e3e-fe67-11ee-81ce-b361084ba5ae.html",
     "title": "Warrenton town staff approves site plan for 220,000-square-foot Amazon data center",
     "date": "2024-04",
     "tier": 2
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/amazon-granted-permit-for-warrenton-data-center-in-fauquier-county-virginia/",
     "note": "DCD (tier 2, Feb 16 2023) confirms SUP approved 4-3 for a 220,000 sq ft facility, ~$550M reported investment, 41.7-acre site bought for $40M. Rappahannock News/FauquierNow (Jun 16 2026) confirms oral arguments heard Jun 15 2026, no ruling yet, project delayed >3 years, and the Town no longer shares "
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "Microsoft Heath campus (Thornwood Drive)",
   "operator": "Microsoft",
   "tenant": "",
   "city": "Heath, Licking County",
   "region": "Ohio",
   "country": "USA",
   "lat": 40.023,
   "lng": -82.44,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "227 acres acquired; construction originally slated summer 2025; paused Apr 2025 (land farmed); groundbreaking Mar 2026; no completion date announced.",
   "capex_usd_b": null,
   "power_notes": "AEP Ohio (PJM).",
   "chips_notes": "",
   "notes": "One of three sites in Microsoft's $1B Licking County program; per-site capex not disclosed.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-backs-away-from-1bn-data-center-plans-in-licking-county-ohio/",
     "title": "Microsoft pauses $1bn data center plans in Licking County, Ohio",
     "date": "2025-04-07",
     "tier": 2
    },
    {
     "url": "https://www.enr.com/articles/60572-microsoft-hits-pause-button-on-1b-in-data-centers-in-ohio",
     "title": "Microsoft Hits Pause Button on $1B in Data Centers in Ohio",
     "date": "2025-04-10",
     "tier": 2
    },
    {
     "url": "https://www.nbc4i.com/news/local-news/licking-county/microsoft-breaks-ground-on-two-licking-county-data-centers/",
     "title": "Microsoft breaks ground on two Licking County data centers",
     "date": "2026-03-04",
     "tier": 3
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/microsoft-backs-away-from-1bn-data-center-plans-in-licking-county-ohio/",
     "note": "DCD (tier 2, Apr 8 2025) confirms 227 acres on Thornwood Drive, Heath; construction originally summer 2025; paused Apr 2025 with land kept farmable and Microsoft retaining the land and utility agreements. The Mar 2026 groundbreaking rests solely on NBC4i, which could not be retrieved; 'under_constru"
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "Stargate Lordstown (SoftBank)",
   "operator": "SoftBank",
   "tenant": "OpenAI",
   "city": "Lordstown, Trumbull County",
   "region": "Ohio",
   "country": "USA",
   "lat": 41.16,
   "lng": -80.86,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Announced Sep 23, 2025 as one of five new Stargate sites; OpenAI says on track to be operational in 2026; SoftBank's Lordstown + Milam County TX sites together scale to 1.5 GW over 18 months.",
   "capex_usd_b": null,
   "power_notes": "PJM (Ohio); site-specific power not disclosed.",
   "chips_notes": "Not disclosed.",
   "notes": "Per-site MW not broken out (1.5 GW is combined with Milam County, TX). Status inferred from OpenAI's 'operational in 2026' statement.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://openai.com/index/five-new-stargate-sites/",
     "title": "OpenAI: Stargate advances with five new sites",
     "date": "2025-09-23",
     "tier": 1
    }
   ],
   "checks": [
    {
     "lens": "existence+capacity",
     "ok": true,
     "evidence_url": "https://openai.com/index/five-new-stargate-sites/",
     "note": "OpenAI (tier 1, Sep 23 2025) confirms SoftBank 'has broken ground' at Lordstown, 'on track to be operational next year' (2026), and that Lordstown + Milam County TX 'can scale to 1.5 gigawatts over the next 18 months' — no per-site MW, so null is correct. SoftBank Group's 2026 press page (checked Se"
    }
   ],
   "verified": true,
   "tier": "verified"
  },
  {
   "name": "Google Haskell County campuses (Journey / Thelma)",
   "operator": "Google (via Housebound Group LLC)",
   "tenant": "Google",
   "city": "Haskell",
   "region": "Texas",
   "country": "USA",
   "lat": 33.1576,
   "lng": -99.7337,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Journey 1A: Apr 2026 - late Aug 2027; Journey 2A: Jun 2026 - late Oct 2026 (per TDLR filings); two campuses planned, one co-located with Intersect/TPG solar+storage",
   "capex_usd_b": 0.8,
   "power_notes": "ERCOT; one campus to be co-located with a new solar + battery plant (Intersect / TPG Rise Climate partnership); air-cooled",
   "chips_notes": "Not disclosed",
   "notes": "capex_usd_b = $800M for the two Journey buildings only (1362 Red Creek Rd, Haskell); DCD cites a related 'Thelma' campus estimate of ~440 MW but no company-confirmed MW.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/google-linked-housebound-group-files-for-two-data-center-projects-in-haskell-texas/",
     "title": "Google-linked Housebound Group files for two data center projects in Haskell, Texas",
     "date": "2026-07-08",
     "tier": 2
    },
    {
     "url": "https://www.bisnow.com/national/news/data-center-development/google-launches-40b-texas-data-center-build-out-131930",
     "title": "Google Launches $40B Texas Data Center Build-Out",
     "date": "2025-11-17",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.bisnow.com/national/news/data-center-development/google-launches-40b-texas-data-center-build-out-131930",
     "note": "Confirms two Google data centers planned for Haskell County as part of the $40B Texas plan; row's null MW figures are appropriate since no capacity has been disclosed."
    }
   ],
   "verified": true
  },
  {
   "name": "Google Armstrong County campus",
   "operator": "Google",
   "tenant": "Google",
   "city": "Claude (Armstrong County)",
   "region": "Texas",
   "country": "USA",
   "lat": 35.1117,
   "lng": -101.3632,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Announced Nov 2025 as part of $40B Texas plan through 2027",
   "capex_usd_b": null,
   "power_notes": "ERCOT (Panhandle); air-cooled design",
   "chips_notes": "Not disclosed",
   "notes": "Site-level MW/capex not disclosed. Coordinates are county seat.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.bisnow.com/national/news/data-center-development/google-launches-40b-texas-data-center-build-out-131930",
     "title": "Google Launches $40B Texas Data Center Build-Out",
     "date": "2025-11-17",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/google-commits-40bn-to-expand-cloud-and-ai-infrastructure-in-texas-through-2027/",
     "title": "Google commits $40bn to expand cloud and AI infrastructure in Texas through 2027",
     "date": "2025-11-17",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.bisnow.com/national/news/data-center-development/google-launches-40b-texas-data-center-build-out-131930",
     "note": "Confirms a Google data center planned for Armstrong County (southwest of Amarillo) as part of the $40B Texas plan announced Nov 2025; 'Claude, TX' is genuinely the county seat, not a data artifact."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Temple Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Temple",
   "region": "Texas",
   "country": "USA",
   "lat": 31.0982,
   "lng": -97.3428,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Announced 2021 ($800M); construction from 2022; came online 22 Jul 2026 as Meta's first AI-optimized data center",
   "capex_usd_b": 1.2,
   "power_notes": "ERCOT/Oncor; Meta 100%-matched renewables (9,000 MW across 40 Texas projects per Statesman); closed-loop liquid cooling, zero water most of the year",
   "chips_notes": "Servers with 8 AI accelerators each (AMD or Nvidia); counts not disclosed",
   "notes": "760,000 sq ft, ~400 acres, ~100 FTE. Tier-3 datacentermap lists 152 MW and a 400 MW figure circulates; not confirmed by Meta - left null.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.templetx.gov/news_detail_T13_R305.php",
     "title": "Meta to build new Hyperscale Data Center in Temple",
     "date": "2021",
     "tier": 1
    },
    {
     "url": "https://www.statesman.com/business/technology/article/meta-ai-data-center-temple-photos-22354336.php",
     "title": "Inside Meta's AI data center in Temple",
     "date": "2026-08-04",
     "tier": 3
    },
    {
     "url": "https://spectrumlocalnews.com/tx/south-texas-el-paso/news/2026/07/30/temple-data-center",
     "title": "Meta opens AI-optimized data center in Temple",
     "date": "2026-07-30",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://spectrumlocalnews.com/tx/south-texas-el-paso/news/2026/07/30/temple-data-center",
     "note": "Confirmed operational as Meta's first AI-optimized data center to go online (Jul 2026); Meta's own materials cite a total investment of more than $1.2B, matching the row's capex figure and 'operating' status."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft San Antonio / Castroville campus (SAT80-82, SAT89-90)",
   "operator": "Microsoft",
   "tenant": "Microsoft",
   "city": "Castroville (Medina County)",
   "region": "Texas",
   "country": "USA",
   "lat": 29.3558,
   "lng": -98.8786,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "SAT80/81 ($230M) due Q3 2024; SAT82 ($482.6M, 244,675 sq ft) Apr 2026 - early 2028; further ~$400M / ~200k sq ft building Aug 2026 - Jun 2028 (Bisnow Jan 2026)",
   "capex_usd_b": null,
   "power_notes": "ERCOT / CPS Energy-Medina Electric area; MW not disclosed",
   "chips_notes": "Not disclosed",
   "notes": "Microsoft's western San Antonio hub spans multiple Castroville and Westover Hills sites; per-building filings only, no campus MW. Tier-3 trackers cite ~120 MW for SAT89/90 - not adopted.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-plans-482m-data-center-in-san-antonio-texas/",
     "title": "Microsoft plans $482m data center in San Antonio, Texas",
     "date": "2024-07-30",
     "tier": 2
    },
    {
     "url": "https://www.bisnow.com/national/news/data-center-development/microsoft-project-continues-san-antonio-rise-major-data-center-hub-132675",
     "title": "Microsoft Plans $400M Data Center In Fast-Growing San Antonio Hub",
     "date": "2026-01-12",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-plans-400m-data-center-in-castroville-texas/",
     "title": "Microsoft plans $400m data center in Castroville, Texas",
     "date": "2025-12",
     "tier": 2
    }
   ],
   "verified": true,
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/microsoft-plans-482m-data-center-in-san-antonio-texas/",
     "note": "DCD confirms SAT80/81 ($230M, due Q3 2024) and SAT82 ($482.6M, 244,675 sq ft, construction Apr 2026-early 2028) in Castroville, Medina County, matching the row closely."
    }
   ],
   "tier": "verified"
  },
  {
   "name": "Google Storey County (TRIC)",
   "operator": "Google",
   "tenant": "Google",
   "city": "Storey County (Tahoe Reno Industrial Center)",
   "region": "Nevada",
   "country": "USA",
   "lat": 39.54,
   "lng": -119.43,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "1,200+ acres bought Apr 2017 ($29M); campus opened 2021; geothermal supply from 2023; $400M Nevada investment 2024; Google cites $6B Nevada total since 2019.",
   "capex_usd_b": null,
   "power_notes": "NV Energy; geothermal (Fervo) supply since 2023; 450MW+ clean energy contracted statewide.",
   "chips_notes": "Not disclosed.",
   "notes": "MW and site capex not published.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.google/locations/storey-county-nevada/",
     "title": "Google Data Centers - Storey County, Nevada",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://www.thenevadaindependent.com/article/google-to-spend-400-million-to-expand-nevada-data-centers",
     "title": "Google to spend $400 million to expand Nevada data centers (Nevada Independent)",
     "date": "2024-08",
     "tier": 2
    },
    {
     "url": "https://www.kolotv.com/content/news/Google-buying-land-in--419668113.html",
     "title": "Google buying Storey County land for data center (KOLO)",
     "date": "2017-04-17",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://datacenters.google/locations/storey-county-nevada/",
     "note": "Google's own site confirms the Storey County campus began operating in 2021 and has run continuously since, with geothermal power added 2023, matching the row."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Los Lunas Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Los Lunas (Valencia County)",
   "region": "New Mexico",
   "country": "USA",
   "lat": 34.806,
   "lng": -106.733,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Opened 2019; multiple expansions; 2025 expansion of two AI-focused buildings (~$800M per DCD); late 2025 bought ~500 adjacent acres; Mar 2026 village council approved new incentive deal requiring $350M investment by year 10.",
   "capex_usd_b": null,
   "power_notes": "PNM; Meta-contracted New Mexico solar.",
   "chips_notes": "Not disclosed.",
   "notes": "Per-building MW figures (40-48MW) come only from tier-3 trackers; cumulative capex ($2.2B-$3.3B) only tier 3; both left null.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/meta-planning-expansion-of-los-lunas-data-center-campus-in-new-mexico/",
     "title": "Meta plans expansion of Los Lunas data center campus in New Mexico",
     "date": "2025",
     "tier": 2
    },
    {
     "url": "https://www.kob.com/news/top-news/report-meta-closer-to-expanding-data-center-in-los-lunas/",
     "title": "Report: Meta closer to expanding data center in Los Lunas (KOB 4)",
     "date": "2026-03-17",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/meta-planning-expansion-of-los-lunas-data-center-campus-in-new-mexico/",
     "note": "DCD confirms the ongoing Los Lunas campus (4250 Messenger Loop NW, outside Albuquerque) with a new ~$800M two-building expansion approved via industrial revenue bonds, matching the row's operating status and expansion narrative."
    }
   ],
   "verified": true
  },
  {
   "name": "O'Leary Digital 'Stratos' (Box Elder County)",
   "operator": "O'Leary Digital",
   "tenant": "None named",
   "city": "Brigham City area (Box Elder County)",
   "region": "Utah",
   "country": "USA",
   "lat": 41.51,
   "lng": -112.02,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "MIDA development agreement approved 24-25 Apr 2026; Box Elder County commission vote postponed after resident pushback",
   "capex_usd_b": null,
   "power_notes": "Planned fully off-grid, on-site gas generation fed by Ruby Pipeline; ~3 GW phase 1 to 9 GW full build (tier-3 reporting only)",
   "chips_notes": "Not disclosed",
   "notes": "40,000 acres private + 1,200 acres military/state land. GW figures reported by Quartz/Tom's Hardware citing Salt Lake Tribune and MIDA - no tier-1/2 source retrieved, so mw_planned left null.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.tomshardware.com/tech-industry/kevin-o-learys-9-gw-utah-data-center-campus-approved",
     "title": "Kevin O'Leary's 9 GW Utah data center campus approved",
     "date": "2026-04-27",
     "tier": 3
    },
    {
     "url": "https://finance.yahoo.com/sectors/technology/articles/kevin-oleary-plans-9-gigawatt-133729333.html",
     "title": "Kevin O'Leary plans 9-gigawatt AI data center campus in Utah (Quartz)",
     "date": "2026-04-28",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.tomshardware.com/tech-industry/kevin-o-learys-9-gw-utah-data-center-campus-approved",
     "note": "Confirms MIDA approved the Stratos development agreement around 24-25 Apr 2026 in Box Elder County, with the county commission's final vote postponed after resident pushback and no tenant named — matching the row exactly (reporting citing t"
    }
   ],
   "verified": true
  },
  {
   "name": "Google Stillwater campus",
   "operator": "Google (via Kipper LLC)",
   "tenant": "Google",
   "city": "Stillwater (Payne County)",
   "region": "Oklahoma",
   "country": "USA",
   "lat": 36.1156,
   "lng": -97.0586,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Proposed Aug 2024; Google confirmed Mar 2025; six ~300k sq ft buildings in phases; part of $9B Oklahoma plan (Aug 2025); local reports say construction underway",
   "capex_usd_b": 3,
   "power_notes": "OG&E; MW not disclosed",
   "chips_notes": "Not disclosed",
   "notes": "~400 acres at Perkins & Richmond Rds. capex = up to $3B estimate from city filings.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/google-behind-ai-data-center-campus-in-stillwater-oklahoma/",
     "title": "Google behind AI data center campus in Stillwater, Oklahoma",
     "date": "2025-03-14",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/more-details-emerge-around-proposed-data-center-campus-in-stillwater-oklahoma/",
     "title": "More details emerge around proposed data center campus in Stillwater, Oklahoma",
     "date": "2024-08-21",
     "tier": 2
    },
    {
     "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-oklahoma/",
     "title": "Google is investing in infrastructure and an AI-ready workforce in Oklahoma",
     "date": "2025-08-13",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 4,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-oklahoma/",
     "note": "Google's own blog confirms the $9B Oklahoma investment (announced Aug 2025) that includes a new Stillwater data center campus, matching the row."
    }
   ],
   "verified": true
  },
  {
   "name": "AWS Madison County ('Project Atlas': Canton Mega Site + Ridgeland)",
   "operator": "Amazon Web Services",
   "tenant": "AWS",
   "city": "Canton (Madison County)",
   "region": "Mississippi",
   "country": "USA",
   "lat": 32.61,
   "lng": -90.04,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "$10B announced Jan 2024 (construction through 2027); Apr 2026 commitment raised to $25B statewide incl. +$11B Madison County, $3B Warren County (2026 start), $1B Hinds County (Clinton Delphi plant); Canton buildings operating, Ridgeland early-stage (local reports)",
   "capex_usd_b": 11,
   "power_notes": "Entergy Mississippi (MISO); 616 MW new renewables (5 projects); $300M 'Superpower Mississippi' grid investments; Entergy $2-3B solar build",
   "chips_notes": "Not disclosed",
   "notes": "capex = $11B Madison County figure (Apr 2026); two sites totalling ~1,700 acres. MW not disclosed by AWS.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers",
     "title": "Amazon plans to invest $25 billion in Mississippi data centers",
     "date": "2026-04-10",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/aws-scales-up-investment-commitment-for-mississippi-data-centers-to-25bn/",
     "title": "AWS scales up investment commitment for Mississippi data centers to $25bn",
     "date": "2026-04-10",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/",
     "title": "AWS confirmed to be behind $10bn Mississippi data center development",
     "date": "2024-01-26",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers",
     "note": "Amazon's own release confirms $25B statewide total with $11B Madison County (Canton), $3B Warren County, $1B Hinds County; Canton lat/lng matches town center closely."
    }
   ],
   "verified": true
  },
  {
   "name": "Ooredoo / Syntys Doha sovereign AI cloud",
   "operator": "Syntys (Ooredoo Group data center spin-out)",
   "tenant": "Ooredoo AI cloud (NVIDIA)",
   "city": "Doha",
   "region": "Ad-Dawhah",
   "country": "Qatar",
   "lat": 25.2854,
   "lng": 51.531,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "NVIDIA Hopper-based sovereign AI cloud launched Jul 2025 in Ooredoo's Qatar data centers; Syntys targets >120MW group-wide (Qatar, Kuwait, Oman, Iraq, Tunisia) with $1B initial capital",
   "capex_usd_b": null,
   "power_notes": "Not disclosed",
   "chips_notes": "NVIDIA Hopper GPUs (count undisclosed)",
   "notes": "No named gigawatt-class AI campus in Qatar found with tier-1/2 sourcing; Qatar-specific MW not disclosed (Syntys acquired Q Data QFZ: 5MW live, 7.5MW under development per DCD). Ooredoo's Aug 2026 1GW Zankore platform is Indonesia-focused, not Qatar.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.ooredoo.com/en/media/news_view/ooredoo-deploys-nvidia-accelerated-computing-in-qatar-ushers-in-the-countrys-next-wave-of-innovation/",
     "title": "Ooredoo deploys NVIDIA accelerated computing in Qatar",
     "date": "2025-07-01",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/ooredoos-syntys-acquires-two-data-centers-in-qatar/",
     "title": "DCD: Ooredoo's Syntys acquires two data centers in Qatar",
     "date": "2025",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.ooredoo.com/en/media/news_view/ooredoo-deploys-nvidia-accelerated-computing-in-qatar-ushers-in-the-countrys-next-wave-of-innovation/",
     "note": "Ooredoo's own release confirms Syntys-operated NVIDIA Hopper sovereign AI cloud in Qatar and the >120MW/$1B group-wide target cited in the row."
    }
   ],
   "verified": true
  },
  {
   "name": "Stargate UK – Cobalt Park (AI Growth Zone)",
   "operator": "Nscale",
   "tenant": "OpenAI (paused)",
   "city": "North Tyneside (Newcastle)",
   "region": "Tyne and Wear, England",
   "country": "United Kingdom",
   "lat": 55.0232,
   "lng": -1.5205,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "paused",
   "timeline": "Announced Sep 16, 2025 (8,000 GPUs Q1 2026, scaling to 31,000); OpenAI paused Stargate UK Apr 9, 2026 citing energy costs, regulation (copyright) and grid delays; no planning application lodged or construction started as of the pause",
   "capex_usd_b": null,
   "power_notes": "OpenAI cited high UK industrial electricity prices and grid access delays",
   "chips_notes": "Planned 8,000 NVIDIA GPUs initially, up to 31,000",
   "notes": "MW never disclosed. Nscale's own plans for the site unclear (DCD, Apr 2026); OpenAI and Nscale still in discussions.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.nscale.com/press-releases/nscale-uk-ai-infrastructure-announcement",
     "title": "Nscale UK AI infrastructure commitment",
     "date": "2025-09-16",
     "tier": 1
    },
    {
     "url": "https://www.cnbc.com/2026/04/09/openai-halts-uk-stargate-project.html",
     "title": "CNBC: OpenAI halts UK Stargate project",
     "date": "2026-04-09",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/nscale-partners-with-bt-for-more-uk-data-centers/",
     "title": "DCD: Nscale partners with BT",
     "date": "2026-04-23",
     "tier": 2
    },
    {
     "url": "https://thenextweb.com/news/openai-apparently-never-visited-the-site-of-its-flagship-uk-ai-project",
     "title": "TNW (citing Guardian): OpenAI never visited Stargate UK site",
     "date": "2026-07-04",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.cnbc.com/2026/04/09/openai-halts-uk-stargate-project.html",
     "note": "Confirmed Nscale/OpenAI Stargate UK paused Apr 9, 2026 over energy costs/regulation; Cobalt Park, North Tyneside coordinates (Wikipedia: 55.021,-1.507) are within ~1.5km of the row's lat/lng."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft Aragón campus (La Muela / Villamayor de Gállego)",
   "operator": "Microsoft",
   "tenant": "",
   "city": "La Muela / Villamayor de Gállego",
   "region": "Aragón (Zaragoza)",
   "country": "Spain",
   "lat": 41.581,
   "lng": -1.118,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "announced",
   "timeline": "PIGA (regional interest) approval; construction to start late 2026; operational 2030 (El Español, Mar 2026)",
   "capex_usd_b": null,
   "power_notes": "Aragón grid capacity is the key constraint; nine connection points reserved region-wide",
   "chips_notes": "Not disclosed",
   "notes": "MW and capex not disclosed in fetched tier-1/2 sources; plotted at La Muela.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.elespanol.com/aragon/economia/20260322/aragon-convierte-capital-datos-nube-calendario-amazon-microsoft-proyectos/1003744178360_0.html",
     "title": "El Español: Aragón data center project calendar",
     "date": "2026-03-22",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.elespanol.com/aragon/economia/20260322/aragon-convierte-capital-datos-nube-calendario-amazon-microsoft-proyectos/1003744178360_0.html",
     "note": "Source confirms Microsoft Aragón campus (La Muela/Villamayor de Gállego/Zaragoza) construction start late 2026 and operational 2030, matching the row's timeline."
    }
   ],
   "verified": true
  },
  {
   "name": "AWS Aragón region (Zaragoza / Villanueva de Gállego / El Burgo de Ebro / Huesca)",
   "operator": "Amazon Web Services",
   "tenant": "",
   "city": "Zaragoza",
   "region": "Aragón",
   "country": "Spain",
   "lat": 41.6488,
   "lng": -0.8891,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "3 sites operational; expansions through 2033; new sites at San Mateo de Gállego and La Puebla de Híjar planned 2028–2030",
   "capex_usd_b": null,
   "power_notes": "Regional grid constrained; AWS expansions compete for reserved connection points",
   "chips_notes": "Not disclosed",
   "notes": "El Español cites €33.7bn 2023–2033 total Aragón investment (single tier-2 source; not converted into capex field). MW not disclosed.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.elespanol.com/aragon/economia/20260322/aragon-convierte-capital-datos-nube-calendario-amazon-microsoft-proyectos/1003744178360_0.html",
     "title": "El Español: Aragón data center project calendar",
     "date": "2026-03-22",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.elespanol.com/aragon/economia/20260322/aragon-convierte-capital-datos-nube-calendario-amazon-microsoft-proyectos/1003744178360_0.html",
     "note": "Confirms 3 AWS sites operational since 2023 in Zaragoza/Villanueva de Gállego/El Burgo de Ebro, expansion through 2033, and new San Mateo de Gállego/La Puebla de Híjar sites planned."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft Sweden Central (Sandviken / Gävle / Staffanstorp)",
   "operator": "Microsoft",
   "tenant": "",
   "city": "Sandviken",
   "region": "Gävleborg",
   "country": "Sweden",
   "lat": 60.6166,
   "lng": 16.7855,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "$3.2B (SEK 33.7bn) expansion announced Jun 2024 over two years (through 2026); Staffanstorp expansion (70MW backup permit) withdrawn Aug 2022, new southern site sought",
   "capex_usd_b": 3.2,
   "power_notes": "100% carbon-free energy via Vattenfall partnership",
   "chips_notes": "20,000+ GPUs (NVIDIA H100, AMD, Microsoft silicon)",
   "notes": "Region MW not disclosed by Microsoft. Plotted at Sandviken (three-site region).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-to-deploy-20000-gpus-in-sweden/",
     "title": "DCD: Microsoft to deploy 20,000 GPUs in Sweden",
     "date": "2024-06-03",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-drops-plans-to-expand-staffanstorp-data-center-in-sweden-looking-for-new-site/",
     "title": "DCD: Microsoft drops Staffanstorp expansion",
     "date": "2022-08",
     "tier": 2
    },
    {
     "url": "https://www.techzine.eu/news/infrastructure/120679/microsoft-expands-all-data-centres-in-sweden/",
     "title": "Techzine: Microsoft expands all data centres in Sweden",
     "date": "2024-06-04",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://siliconangle.com/2024/06/03/microsoft-details-3-2b-plan-expand-data-center-capacity-sweden/",
     "note": "Confirmed $3.2B (33.7bn SEK) over two years across Sandviken/Gävle/Staffanstorp announced Jun 2024; DCD headline separately corroborates the Staffanstorp withdrawal detail."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft West Denmark region (Esbjerg / Varde)",
   "operator": "Microsoft",
   "tenant": "",
   "city": "Esbjerg",
   "region": "Syddanmark",
   "country": "Denmark",
   "lat": 55.4765,
   "lng": 8.4594,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Announced Dec 12, 2025 as Microsoft's largest Danish investment; Denmark East region launching H1 2026; West Denmark build beyond 2027",
   "capex_usd_b": 3,
   "power_notes": "100% carbon-free matched via long-term PPAs; waste-heat reuse designed in. Energinet halted new large-consumer grid-connection agreements in 2026 (queue ~60GW vs ~7GW peak demand) moving to maturity-based pools",
   "chips_notes": "Not disclosed",
   "notes": "Capex is Microsoft's $3B Denmark datacenter investment 2023–2027 (West Denmark adds beyond that; amount undisclosed). MW not disclosed.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://news.microsoft.com/source/emea/features/accelerating-europes-digital-future-microsoft-announces-plans-for-a-new-datacenter-region-in-west-denmark/",
     "title": "Microsoft announces plans for a new datacenter region in West Denmark",
     "date": "2025-12-12",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-to-launch-data-center-region-in-denmark-in-2026/",
     "title": "DCD: Microsoft to launch data center region in Denmark in 2026",
     "date": "2025-12",
     "tier": 2
    },
    {
     "url": "https://www.datacenterknowledge.com/build-design/denmark-rations-grid-access-as-ai-buildout-floods-nordic-systems",
     "title": "DCK: Denmark rations grid access as AI buildout floods Nordic systems",
     "date": "2026-05-28",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://news.microsoft.com/source/emea/features/accelerating-europes-digital-future-microsoft-announces-plans-for-a-new-datacenter-region-in-west-denmark/",
     "note": "Microsoft's own announcement confirms Dec 2025 West Denmark (Esbjerg/Varde) region news, $3B 2023-2027 commitment, and Denmark East region launching H1 2026."
    }
   ],
   "verified": true
  },
  {
   "name": "Deutsche Telekom Industrial AI Cloud (Munich Tucherpark)",
   "operator": "Deutsche Telekom (facility operated by Polarise)",
   "tenant": "Siemens, Agile Robots, Quantum Systems, Perplexity and others",
   "city": "Munich",
   "region": "Bavaria",
   "country": "Germany",
   "lat": 48.152,
   "lng": 11.59,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Announced Apr 2025; bookable from Q1 2026; DCD reported launch in early 2026",
   "capex_usd_b": 1.1,
   "power_notes": "Not disclosed",
   "chips_notes": "~10,000 NVIDIA Blackwell GPUs (1,000+ DGX B200 systems plus RTX PRO servers); 0.5 EFLOPS",
   "notes": "€1bn investment converted at ~1.08 (estimate). MW not disclosed.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.telekom.com/en/media/media-information/archive/ai-sovereignty-for-germany-and-europe-1098708",
     "title": "Deutsche Telekom: AI sovereignty for Germany and Europe",
     "date": "2025-04-11",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/deutsche-telekom-launches-nvidia-powered-ai-factory-in-munichs-tucherpark/",
     "title": "DCD: Deutsche Telekom launches Nvidia-powered AI factory in Munich's Tucherpark",
     "date": "2026",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.telekom.com/en/media/media-information/archive/ai-sovereignty-for-germany-and-europe-1098708",
     "note": "Deutsche Telekom's release confirms Polarise-operated Munich Tucherpark facility, ~€1B investment (matches capex 1.1), Agile Robots and Perplexity as named customers, Q1 2026 bookable target (actual launch Feb 4, 2026 per other tier-2 cover"
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft Grange Castle campus (DUB14/15)",
   "operator": "Microsoft",
   "tenant": "",
   "city": "Dublin (Clondalkin)",
   "region": "Leinster",
   "country": "Ireland",
   "lat": 53.3215,
   "lng": -6.435,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Campus since 2009; DUB14/15 (€900m) planning; 170MW on-site gas plant approved Jul 2023; EirGrid: no new Dublin data center connections until ~2028; CRU Dec 2025 rules require 80% of demand met by new Irish renewables within 6 years",
   "capex_usd_b": null,
   "power_notes": "Dublin grid constrained (EirGrid de facto moratorium since Nov 2021); 170MW gas plant approved for backup/flexible-demand use; data centers ~22% of Irish electricity",
   "chips_notes": "Not disclosed",
   "notes": "Included to represent Dublin constraints. Campus MW not disclosed by Microsoft; tier-3 reports of 239MW gas fleet not entered. Microsoft reportedly shifting focus to other EU sites due to power.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-granted-permission-to-run-its-dublin-data-center-on-gas/",
     "title": "DCD: Microsoft granted permission to run Dublin data center on gas",
     "date": "2023-07-21",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/eirgrid-says-no-new-applications-for-data-centers-in-dublin-till-2028/",
     "title": "DCD: EirGrid says no new applications for data centers in Dublin till 2028",
     "date": "2022",
     "tier": 2
    },
    {
     "url": "https://www.irishtimes.com/business/2026/03/17/what-the-world-can-learn-from-irelands-battle-to-power-data-centres/",
     "title": "Irish Times: What the world can learn from Ireland's battle to power data centres",
     "date": "2026-03-17",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.theregister.com/2023/07/22/microsoft_power_plant/",
     "note": "Confirms Microsoft's 170MW gas plant approval at Grange Castle, Clondalkin, the €900m DUB campus, and EirGrid's freeze on new Dublin data center connections until 2028."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft Middenmeer AMS13/14 campus",
   "operator": "Microsoft",
   "tenant": "",
   "city": "Middenmeer (Hollands Kroon)",
   "region": "North Holland",
   "country": "Netherlands",
   "lat": 52.809,
   "lng": 4.99,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Original campus operating; AMS13/14 permitted Apr 2023; 50 ha acquired Sep 2025 for further halls (two built, plan six)",
   "capex_usd_b": null,
   "power_notes": "Vattenfall contract for Wieringermeer wind farm; campus used 1.17 TWh in 2025 (~1% of Dutch electricity, NL Times); rainwater capture for cooling",
   "chips_notes": "Not disclosed",
   "notes": "Dutch hyperscale permits capped at ~10 ha / 70MW per new site (Techzine); MW not disclosed by Microsoft.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-acquires-50-hectares-for-data-center-expansion-in-the-netherlands/",
     "title": "DCD: Microsoft acquires 50 hectares for data center expansion in the Netherlands",
     "date": "2025-09-11",
     "tier": 2
    },
    {
     "url": "https://nltimes.nl/2026/07/14/microsoft-data-center-uses-1-dutch-electricity",
     "title": "NL Times: Microsoft data center uses 1% of all Dutch electricity",
     "date": "2026-07-14",
     "tier": 3
    },
    {
     "url": "https://www.techzine.eu/news/infrastructure/140039/seven-new-hyperscale-data-centers-to-be-built-in-the-netherlands/",
     "title": "Techzine: Seven new hyperscale data centers to be built in the Netherlands",
     "date": "2026-03-30",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/microsoft-acquires-50-hectares-for-data-center-expansion-in-the-netherlands/",
     "note": "Confirms 50-hectare land acquisition adjacent to Microsoft's existing AMS13/14 campus in Middenmeer/Hollands Kroon for further hall expansion."
    }
   ],
   "verified": true
  },
  {
   "name": "Google Eemshaven / Winschoten campus",
   "operator": "Google",
   "tenant": "",
   "city": "Eemshaven",
   "region": "Groningen",
   "country": "Netherlands",
   "lat": 53.44,
   "lng": 6.84,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Eemshaven opened 2018; Winschoten (€600m) opened Nov 2025; europe-west4 region; further Eemshaven/Middenmeer expansion planned",
   "capex_usd_b": null,
   "power_notes": "Google has secured 1GW of renewable generation in the Netherlands; Winschoten uses air cooling and district-heat reuse",
   "chips_notes": "Not disclosed",
   "notes": "MW not disclosed; €3.8bn cumulative Dutch investment as of 2024.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/google-opens-data-center-in-winschoten-the-netherlands/",
     "title": "DCD: Google opens data center in Winschoten",
     "date": "2025-11-19",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.googlecloudpresscorner.com/2025-11-18-Google-Opens-Data-Center-in-Winschoten-to-Help-Power-the-AI-Economy-in-The-Netherlands",
     "note": "Confirms Google Winschoten (€600m) opened Nov 18, 2025, expanding the europe-west4 region alongside the original Eemshaven site (opened 2018)."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft India South Central (Hyderabad) hyperscale region",
   "operator": "Microsoft",
   "tenant": "Microsoft Azure / AI",
   "city": "Hyderabad",
   "region": "Telangana",
   "country": "India",
   "lat": 17.385,
   "lng": 78.4867,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Announced Dec 2025 as part of $17.5B India plan (CY2026-2029); region went live 6 Aug 2026 with three availability zones",
   "capex_usd_b": 17.5,
   "power_notes": "Microsoft has >1,000 MW of India solar/wind/hybrid PPAs (>630 MW operational); zero-water (air-cooled chiller) cooling",
   "chips_notes": "Not disclosed",
   "notes": "Capex figure is Microsoft's India-wide 2026-2029 commitment ($20.5B incl. Jan-2025 $3B), not campus-specific. Microsoft has not published IT MW for the Hyderabad campus.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://news.microsoft.com/source/asia/features/microsofts-newest-india-datacenter-region-goes-live-to-power-the-countrys-ai-economy-and-enable-frontier-firms/",
     "title": "Microsoft's newest India datacenter region goes live (India South Central, Hyderabad)",
     "date": "2026-08-06",
     "tier": 1
    },
    {
     "url": "https://news.microsoft.com/source/asia/2025/12/09/microsoft-invests-us17-5-billion-in-india-to-drive-ai-diffusion-at-population-scale/",
     "title": "Microsoft invests US$17.5 billion in India",
     "date": "2025-12-09",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://news.microsoft.com/source/asia/features/microsofts-newest-india-datacenter-region-goes-live-to-power-the-countrys-ai-economy-and-enable-frontier-firms/",
     "note": "Microsoft's own release confirms the Hyderabad/India South Central region went live Aug 6, 2026 with three availability zones, part of the $17.5B Dec 2025 India investment plan."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft Southeast Asia 3 region (Kulai / Senai, Johor)",
   "operator": "Microsoft",
   "tenant": "Microsoft Azure / AI",
   "city": "Kulai",
   "region": "Johor",
   "country": "Malaysia",
   "lat": 1.6,
   "lng": 103.65,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Land: 123 acres Eco Business Park VI (Jun 2024, MYR 402m) plus Nusa Cemerlang and other Johor parcels; region named Southeast Asia 3 on 5 Nov 2025; no launch date",
   "capex_usd_b": 2.2,
   "power_notes": "TNB grid; renewable biofuel backup generators; closed-loop zero-water cooling",
   "chips_notes": "Not disclosed",
   "notes": "Capex is Microsoft's $2.2B Malaysia commitment (May 2024), not campus-specific. IT MW not published.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://w.media/microsoft-launches-its-second-cloud-region-in-malaysia/",
     "title": "Microsoft launches its second cloud region in Malaysia (Southeast Asia 3, Johor)",
     "date": "2025-11-05",
     "tier": 2
    },
    {
     "url": "https://www.mingtiandi.com/real-estate/data-centres/microsoft-buying-malaysia-data-centre-site-from-ecoworld/",
     "title": "Microsoft buying Malaysia data centre site from EcoWorld (123 acres, Kulai)",
     "date": "2024-06-13",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-details-plans-for-cloud-region-in-johor-malaysia/",
     "title": "Microsoft details plans for cloud region in Johor, Malaysia",
     "date": "2025-10",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/microsoft-details-plans-for-cloud-region-in-johor-malaysia/",
     "note": "Confirms 123-acre Eco Business Park VI (Senai/Kulai) land deal (RM402m), $2.2B Malaysia commitment, and the Southeast Asia 3 region name; Kulai/Senai coordinates check out within tolerance."
    }
   ],
   "verified": true
  },
  {
   "name": "Google Changhua County data center (Taiwan)",
   "operator": "Google",
   "tenant": "Google (Cloud region asia-east1, AI)",
   "city": "Changhua (Coastal Industrial Park)",
   "region": "Changhua County",
   "country": "Taiwan",
   "lat": 24.08,
   "lng": 120.42,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Opened Dec 2013 ($600M); expansion announced 2015; $1.6B+ invested since 2011; Google says Taiwan is its largest AI hardware engineering hub outside the US (Sep 2026, office +60%)",
   "capex_usd_b": 1.6,
   "power_notes": "Taipower grid; 10 MW Tainan solar PPA (2019); Google-BlackRock 1 GW Taiwan solar pipeline; nighttime thermal storage cooling",
   "chips_notes": "Google TPU infrastructure; no counts disclosed",
   "notes": "Google has never published IT MW for Changhua. Third Taiwan DC (Yunlin/Tainan) reported by DCD but not verifiable here.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.google/locations/taiwan/",
     "title": "Google Data Centers: Changhua County, Taiwan ($1.6B+ since 2011)",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://focustaiwan.tw/business/202609020013",
     "title": "Google to expand Taiwan office space by 60% amid AI infrastructure push",
     "date": "2026-09-02",
     "tier": 2
    },
    {
     "url": "https://www.datacenterknowledge.com/hyperscalers/report-google-plans-66m-taiwan-data-center-investment",
     "title": "Report: Google plans $66M Taiwan data center investment (2013 opening, $600M)",
     "date": "2015-01-05",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://focustaiwan.tw/business/202609020013",
     "note": "Confirms Google's Changhua facility opened Dec 2013 ($600M) and the 2026 statement that Taiwan is Google's largest AI hardware engineering hub outside the US, plus the office +60% expansion."
    }
   ],
   "verified": true
  },
  {
   "name": "AWS South America (Chile) region (Santiago area)",
   "operator": "Amazon Web Services",
   "tenant": "AWS",
   "city": "Santiago",
   "region": "Región Metropolitana",
   "country": "Chile",
   "lat": -33.45,
   "lng": -70.67,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Announced 7 May 2025 (>US$4B, three AZs, launch by end-2026); residents' environmental challenge rejected May 2026, project proceeds",
   "capex_usd_b": 4,
   "power_notes": "Chilean grid (SEN); water-use scrutiny in Santiago basin",
   "chips_notes": "Not disclosed",
   "notes": "IT MW not published. Other Chile items: Google Quilicura (operating since 2015) and revived US$200M Cerrillos project (bnamericas, Aug 2026); Microsoft Chile region launched Jun 2025 - none with MW figures sourced.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://techcrunch.com/2025/05/07/amazon-to-invest-4b-in-chile-to-launch-aws-infrastructure-region/",
     "title": "Amazon to invest $4B in Chile to launch AWS infrastructure region",
     "date": "2025-05-07",
     "tier": 2
    },
    {
     "url": "https://news.google.com/rss/search?q=AWS+Chile+region+%244+billion+data+center+2026&hl=en-US&gl=US&ceid=US:en",
     "title": "Reuters: Amazon's Chile data center moves ahead after residents lose environmental challenge (via Google News index)",
     "date": "2026-05-10",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://techcrunch.com/2025/05/07/amazon-to-invest-4b-in-chile-to-launch-aws-infrastructure-region/",
     "note": "Confirms >$4B AWS Chile region announced May 7, 2025 with 3 AZs targeting end-2026 launch in the Santiago/Huechuraba area; other coverage confirms the residents' environmental challenge was rejected in spring 2026 (reported as early April r"
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Altoona Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Altoona",
   "region": "Iowa",
   "country": "USA",
   "lat": 41.657,
   "lng": -93.505,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Broke ground 2013; seventh expansion (two more buildings) announced Dec 2021 for completion ~2025; campus >5M sq ft",
   "capex_usd_b": 2.5,
   "power_notes": "MidAmerican Energy; 100% matched with renewables; Meta-supported 225 MW of new wind/renewables in Iowa",
   "chips_notes": "Not disclosed",
   "notes": "Meta's largest campus by floor area. Meta does not disclose IT MW; third-party estimates (260 MW-1,401 MW) are tier-3 only and omitted.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.atmeta.com/asset/altoona-data-center-info-sheet/",
     "title": "Meta's Altoona Data Center info sheet ($2.5B+, 225 MW renewables)",
     "date": "2025-02",
     "tier": 1
    },
    {
     "url": "https://www.datacenterfrontier.com/cloud/article/11427725/meta-adds-more-data-centers-in-iowa-pushing-campus-to-5-million-sf",
     "title": "Meta Adds More Data Centers in Iowa, Pushing Campus to 5 Million SF",
     "date": "2021-12-15",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.businessrecord.com/final-expansion-to-make-altoona-site-metas-largest-data-center-worldwide/",
     "note": "Confirms Altoona's seventh/final expansion (two buildings, announced Dec 2021, completion ~2025), >5M sq ft campus, and $2.5B total investment matching capex_usd_b."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft West Des Moines campuses (incl. Project Osmium)",
   "operator": "Microsoft",
   "tenant": "Microsoft",
   "city": "West Des Moines",
   "region": "Iowa",
   "country": "USA",
   "lat": 41.577,
   "lng": -93.711,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Osmium (SW Kerry St) announced 2016, 1.7M sq ft at full build; 4th of 5 buildings permitted Dec 2022; completion delayed ~12 months; additional Des Moines-area campuses filed 2023-2024",
   "capex_usd_b": 3.5,
   "power_notes": "MidAmerican Energy service territory; Microsoft PPAs for Iowa wind",
   "chips_notes": "Not disclosed",
   "notes": "Capex is Microsoft's stated cumulative Iowa figure (~$3.5B incl. Osmium $1.5-2B) per DCD; Des Moines Register (Sep 2026) reports five WDM campuses at >$1B each (not fetched). IT MW not disclosed.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-delays-west-des-moines-osmium-data-center-build/",
     "title": "Microsoft delays West Des Moines 'Osmium' data center build",
     "date": "2023",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-to-build-another-huge-data-center-in-iowa/",
     "title": "Microsoft to build another huge data center in Iowa",
     "date": "2016",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.businessrecord.com/building-permits-issued-for-2-new-microsoft-data-centers-in-wdm/",
     "note": "Confirms Project Osmium (SW Kerry St) 1.7M sq ft build-out, permits for the 4th of 5 buildings around 2022, and a DCD-reported construction delay."
    }
   ],
   "verified": true
  },
  {
   "name": "Google Council Bluffs",
   "operator": "Google",
   "tenant": "Google",
   "city": "Council Bluffs",
   "region": "Iowa",
   "country": "USA",
   "lat": 41.2219,
   "lng": -95.8639,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": 237,
   "status": "operating",
   "timeline": "Opened 2009; expansions 2012, 2015, $350M (2023), $1B (Jul 2024), part of $7B Iowa pledge (Jun 2025)",
   "capex_usd_b": 6.8,
   "power_notes": "MidAmerican Energy; Google renewable PPAs in Iowa",
   "chips_notes": "Epoch AI (satellite-based estimate): ~289k H100-equivalents, TPU v5e/v6e/v5p/v7 across three buildings",
   "notes": "mw_operational is Epoch AI's estimate for the 'Council Bluffs (East)' site only (as of 2026-09-01). capex is Google's stated cumulative Council Bluffs investment before the June 2025 $7B pledge; Google says $20B+ invested in Iowa since 2007 including 2025 pledge.",
   "value_type": "estimate",
   "sources": [
    {
     "url": "https://epoch.ai/data/ai-data-centers/directory/google-council-bluffs-east",
     "title": "Epoch AI - Google Council Bluffs (East)",
     "date": "2026-09-01",
     "tier": 1
    },
    {
     "url": "https://datacenters.google/locations/iowa/",
     "title": "Google Data Centers - Iowa",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://news.constructconnect.com/google-doubles-down-on-iowa-with-7-billion-data-center-investment",
     "title": "Google Doubles Down on Iowa with $7 Billion Data Center Investment",
     "date": "2025-06-06",
     "tier": 2
    },
    {
     "url": "https://www.datacenterfrontier.com/hyperscale/article/55093750/google-continues-to-invest-in-iowa-with-another-1-billion-planned-for-its-council-bluffs-campus",
     "title": "Google Continues to Invest in Iowa with Another $1B for Council Bluffs",
     "date": "2024-07-08",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://datacenters.google/locations/iowa/",
     "note": "Confirms Google Council Bluffs is operating; third-party tracker (epoch.ai) independently lists 237MW IT power, matching mw_operational exactly. Total capex is a soft figure (epoch.ai models ~$9.0B vs. row's $6.8B cumulative-announcement es"
    }
   ],
   "verified": true
  },
  {
   "name": "Google Cedar Rapids (Big Cedar Industrial Center)",
   "operator": "Google",
   "tenant": "Google",
   "city": "Cedar Rapids",
   "region": "Iowa",
   "country": "USA",
   "lat": 41.9779,
   "lng": -91.6656,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "414 acres acquired May 2024; first building projected 2026 with four more in later phases (six data centers planned per city documents); part of $7B Iowa pledge (Jun 2025)",
   "capex_usd_b": null,
   "power_notes": "Alliant Energy (IPL) service territory",
   "chips_notes": "Not disclosed",
   "notes": "Capex not broken out by Google; early city documents cited $576M initial. QTS is also developing a separate campus at Big Cedar. Tier-3 trackers cite 82 MW (omitted).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://news.constructconnect.com/google-doubles-down-on-iowa-with-7-billion-data-center-investment",
     "title": "Google Doubles Down on Iowa with $7 Billion Data Center Investment",
     "date": "2025-06-06",
     "tier": 2
    },
    {
     "url": "https://www.alliantenergy.com/news/news-center/2025/06/060425-googlebigcedarannouncement",
     "title": "Alliant Energy - Google Big Cedar announcement",
     "date": "2025-06",
     "tier": 1
    },
    {
     "url": "https://www.datacenterfrontier.com/hyperscale/article/55093750/google-continues-to-invest-in-iowa-with-another-1-billion-planned-for-its-council-bluffs-campus",
     "title": "Google Continues to Invest in Iowa (Cedar Rapids 414 acres, six DCs planned)",
     "date": "2024-07-08",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.alliantenergy.com/news/news-center/2025/06/060425-googlebigcedarannouncement",
     "note": "Confirms 414-acre Big Cedar site, ~$576M initial phase, first building targeted 2026 with more phases to follow; under_construction status is consistent with the 2024 development agreement's 3-year construction-start window."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Sarpy Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Papillion / Springfield",
   "region": "Nebraska",
   "country": "USA",
   "lat": 41.104,
   "lng": -96.104,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Broke ground 2017; expansion announced Jul 2022; multi-building campus across Papillion and Springfield",
   "capex_usd_b": 2.5,
   "power_notes": "Omaha Public Power District; 100% renewable match; Meta-supported 320 MW new renewables in Nebraska",
   "chips_notes": "Not disclosed",
   "notes": "IT MW not disclosed by Meta; tier-3 trackers cite ~320 MW (omitted).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.atmeta.com/asset/sarpy-data-center-info-sheet/",
     "title": "Meta's Sarpy Data Center info sheet ($2.5B+ Nebraska investment)",
     "date": "2025",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/meta-to-expand-sarpy-data-center-in-nebraska/",
     "title": "Meta to expand Sarpy data center in Nebraska",
     "date": "2022-07-29",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/meta-to-expand-sarpy-data-center-in-nebraska/",
     "note": "Confirms original 2017 announcement, growth to a nine-building/4M sq ft campus spanning Papillion and Springfield, and the July 2022 expansion announcement cited in the row."
    }
   ],
   "verified": true
  },
  {
   "name": "Google Papillion / Omaha / Lincoln",
   "operator": "Google",
   "tenant": "Google",
   "city": "Papillion",
   "region": "Nebraska",
   "country": "USA",
   "lat": 41.1544,
   "lng": -96.0422,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": 237,
   "status": "operating",
   "timeline": "Papillion announced 2019; Omaha built 2022 (opened 2024); Lincoln announced 2023 and under construction/partly operational Aug 2026; $930M added Nov 2024",
   "capex_usd_b": 15,
   "power_notes": "OPPD (Papillion/Omaha), Lincoln Electric System (Lincoln)",
   "chips_notes": "Epoch AI estimate for Papillion: ~80k H100-equivalents, TPU v4/v5e/v6e/v5p",
   "notes": "mw_operational is Epoch's estimate for the Papillion site only; capex is Google's stated $15B+ cumulative Nebraska investment since 2019 (all three sites).",
   "value_type": "estimate",
   "sources": [
    {
     "url": "https://epoch.ai/data/ai-data-centers/directory/google-papillion",
     "title": "Epoch AI - Google Papillion",
     "date": "2026-09-01",
     "tier": 1
    },
    {
     "url": "https://datacenters.google/locations/nebraska/",
     "title": "Google Data Centers - Nebraska ($15B+ since 2019)",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://www.klkntv.com/google-shares-update-on-lincoln-data-center/",
     "title": "Google shares update on Lincoln data center",
     "date": "2026-08-06",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.klkntv.com/google-shares-update-on-lincoln-data-center/",
     "note": "Confirms Lincoln facility is operational while still under construction as of Aug 2026, exactly matching the row's claim; epoch.ai independently confirms Papillion at 237MW, matching mw_operational."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta DeKalb Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "DeKalb",
   "region": "Illinois",
   "country": "USA",
   "lat": 41.898,
   "lng": -88.727,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Announced 2020; 505-acre site; DCD reports the facility was declared launched/operational Nov 30, 2023 (not Dec 2024 as previously stated), targeting 2.3M sq ft and >$1B invested since 2020",
   "capex_usd_b": 1,
   "power_notes": "ComEd; Meta-supported 765 MW new renewables in Illinois",
   "chips_notes": "Not disclosed",
   "notes": "IT MW not disclosed.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.atmeta.com/asset/dekalb-data-center-info-sheet/",
     "title": "Meta's DeKalb Data Center info sheet ($1B+)",
     "date": "2025",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/meta-launches-data-center-in-dekalb-illinois/",
     "title": "Meta launches data center in DeKalb, Illinois",
     "date": "2024-12",
     "tier": 2
    }
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/meta-launches-data-center-in-dekalb-illinois/",
     "note": "DCD's own launch article is headlined/dated around the Nov 30, 2023 operational launch, not Dec 2024; operator, location, and 'operating' status remain correct."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft Hoffman Estates",
   "operator": "Microsoft",
   "tenant": "Microsoft",
   "city": "Hoffman Estates",
   "region": "Illinois",
   "country": "USA",
   "lat": 42.063,
   "lng": -88.121,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Former AT&T site acquired 2021 (two buildings proposed, $200M initial); one 200,000 sq ft building complete with 2-3 more planned; investment >$500M",
   "capex_usd_b": 0.5,
   "power_notes": "ComEd",
   "chips_notes": "Not disclosed",
   "notes": "Chicago-market Azure capacity; Compass Datacenters is separately redeveloping the former Sears HQ in Hoffman Estates (not included).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-behind-proposals-200-million-data-center-site-hoffman-estates-illinois/",
     "title": "Microsoft behind proposals for $200 million data center site in Hoffman Estates",
     "date": "2021-03-10",
     "tier": 2
    },
    {
     "url": "https://siteselection.com/its-prime-time-in-illinois/",
     "title": "Site Selection - It's Prime Time in Illinois ($500M+ Microsoft)",
     "date": "2023",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://siteselection.com/its-prime-time-in-illinois/",
     "note": "Confirms >$500M investment, one 200,000 sq ft building complete on an 80-acre campus with 2-3 more planned; the former-AT&T-site detail is plausible but not independently re-confirmed."
    }
   ],
   "verified": true
  },
  {
   "name": "Google Fort Wayne (Project Zodiac)",
   "operator": "Google",
   "tenant": "Google",
   "city": "Fort Wayne",
   "region": "Indiana",
   "country": "USA",
   "lat": 41.0793,
   "lng": -85.1394,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Announced Apr 2024 ($2B); groundbreaking Apr 26, 2024; operational by 2026",
   "capex_usd_b": 2,
   "power_notes": "Indiana Michigan Power (AEP)",
   "chips_notes": "Not disclosed",
   "notes": "Google also has Michigan City ($832M Project Maize, acquired Apr 2026) and Morgan County sites in development.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.constructiondive.com/news/indiana-google-data-center-campus/714643/",
     "title": "Indiana snares $2B Google data center campus",
     "date": "2024-04-30",
     "tier": 2
    },
    {
     "url": "https://datacenters.google/locations/indiana/",
     "title": "Google Data Centers - Indiana (Fort Wayne operational)",
     "date": "2026",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 5,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://datacenters.google/locations/indiana/",
     "note": "Google's own site confirms the Fort Wayne data center is operational, with $2B investment and an April 26, 2024 groundbreaking, consistent with the row."
    }
   ],
   "verified": true
  },
  {
   "name": "Google Michigan City (Project Maize)",
   "operator": "Google",
   "tenant": "Google",
   "city": "Michigan City",
   "region": "Indiana",
   "country": "USA",
   "lat": 41.7075,
   "lng": -86.895,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Former Federal-Mogul site (402 Royal Rd, ~70 acres); Google confirmed as operator Apr 16, 2026; announced 2026 per Google",
   "capex_usd_b": 0.832,
   "power_notes": "NIPSCO; Google commits to cover 100% of power cost and infrastructure driven by its operations",
   "chips_notes": "Not disclosed",
   "notes": "",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.google/locations/indiana/",
     "title": "Google Data Centers - Indiana (Michigan City in development, announced 2026)",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://www.wndu.com/2026/04/16/google-confirms-acquisition-michigan-city-data-center-site/",
     "title": "WNDU - Google confirms acquisition of Michigan City data center site ($832M)",
     "date": "2026-04-16",
     "tier": 3
    },
    {
     "url": "https://www.chicagotribune.com/2026/04/16/google-confirmed-as-michigan-city-data-center-operator/",
     "title": "Chicago Tribune - Google confirmed as Michigan City data center operator",
     "date": "2026-04-16",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.wndu.com/2026/04/16/google-confirms-acquisition-michigan-city-data-center-site/",
     "note": "WNDU (Apr 16, 2026) confirms Google as operator of the former Federal-Mogul site (402 Royal Rd) with an $832M investment and construction underway; actual site coordinates are ~4.6km from the row's lat/lng, well within tolerance."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Jeffersonville Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Jeffersonville",
   "region": "Indiana",
   "country": "USA",
   "lat": 38.354,
   "lng": -85.677,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Announced Jan 2024; 700,000 sq ft on 619 acres at River Ridge Commerce Center; operational 2026",
   "capex_usd_b": 0.8,
   "power_notes": "Duke Energy Indiana; 100% renewable match",
   "chips_notes": "Not disclosed",
   "notes": "Meta's 18th US data center.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.constructiondive.com/news/meta-indiana-data-center-campus/705670/",
     "title": "Meta picks Indiana for $800M data center campus",
     "date": "2024-01-26",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/meta-to-develop-data-center-campus-in-jeffersonville-indiana/",
     "title": "Meta to develop data center campus in Jeffersonville, Indiana",
     "date": "2024-01",
     "tier": 2
    }
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://www.lpm.org/news/2026-08-26/jeffersonville-data-center-zoning-explained-how-meta-got-approved",
     "note": "Louisville Public Media (Aug 26, 2026) reports the facility is still under construction, with full operation not expected until end of 2027, so 'operating' is premature as of today."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft La Porte campus",
   "operator": "Microsoft",
   "tenant": "Microsoft",
   "city": "La Porte",
   "region": "Indiana",
   "country": "USA",
   "lat": 41.6106,
   "lng": -86.7225,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Announced 2024 ($1B, 245,000 sq ft on 489 acres, Radius Industrial Park); expansion plans Apr 2026 (Phase 2 ~500 acres, six more buildings); groundbreaking Jun 17, 2026; buildings 1-2 by spring 2029, building 3 by winter 2029",
   "capex_usd_b": 1,
   "power_notes": "NIPSCO; closed-loop liquid cooling",
   "chips_notes": "Not disclosed",
   "notes": "",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://cityoflaporte.com/news/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana",
     "title": "City of La Porte - Gov. Holcomb announces $1B Microsoft data center",
     "date": "2024",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-breaks-ground-on-data-center-campus-in-la-porte-indiana/",
     "title": "Microsoft breaks ground on data center campus in La Porte, Indiana",
     "date": "2026-06-18",
     "tier": 2
    },
    {
     "url": "https://nwindianabusiness.com/industries/professional-services/information-technology/microsoft-breaks-ground-on-la-porte-data-center/78346/",
     "title": "NWI Business - Microsoft breaks ground on La Porte data center",
     "date": "2026-06-17",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://cityoflaporte.com/news/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana",
     "note": "City of La Porte government release plus independent reporting of the June 2026 groundbreaking confirm the $1B, 489-acre Radius Industrial Park project and its under_construction status."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Stanton Springs (Newton) Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Social Circle (Newton County)",
   "region": "Georgia",
   "country": "USA",
   "lat": 33.645,
   "lng": -83.735,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Broke ground 2018 (970,000 sq ft first building); Phase 1 online 2021; Phase 2 (three buildings, ~1.5M sq ft) 2023; further expansion ongoing",
   "capex_usd_b": 1.5,
   "power_notes": "Walton EMC; Meta-supported 1,120 MW of new solar in Georgia (Silicon Ranch)",
   "chips_notes": "Not disclosed",
   "notes": "IT MW not disclosed; tier-3 tracker cites 435 MW (omitted).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.atmeta.com/asset/newton-data-center-info-sheet/",
     "title": "Meta Stanton Springs Data Center info sheet ($1.5B+)",
     "date": "2025",
     "tier": 1
    },
    {
     "url": "https://datacenters.atmeta.com/2021/03/hello-georgia/",
     "title": "Hello, Georgia! - Meta Data Centers",
     "date": "2021-03-14",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://datacenters.atmeta.com/2021/03/hello-georgia/",
     "note": "Meta's own blog confirms the Newton County/Stanton Springs (Social Circle) campus has been operational since 2021; Social Circle's coordinates sit ~2km from the row's lat/lng, within tolerance."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft Rome (Project Firecracker)",
   "operator": "Microsoft",
   "tenant": "Microsoft",
   "city": "Rome (Floyd County)",
   "region": "Georgia",
   "country": "USA",
   "lat": 34.257,
   "lng": -85.164,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "347 acres near Huffaker Road; $1B; operational by 2028",
   "capex_usd_b": 1,
   "power_notes": "Georgia Power",
   "chips_notes": "Not disclosed",
   "notes": "",
   "value_type": "reported",
   "sources": [
    "https://weisradio.com/2023/10/30/microsoft-planning-on-investing-a-billion-dollars-into-rome-georgia-operation/",
    "https://www.datacenterdynamics.com/en/news/microsoft-to-develop-350-acre-data-center-campus-in-rome-georgia/",
    "https://www.constructconnect.com/construction-economic-news/ai-fueling-data-center-construction-boom-in-georgia"
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://weisradio.com/2023/10/30/microsoft-planning-on-investing-a-billion-dollars-into-rome-georgia-operation/",
     "note": "The row's sole source (constructconnect.com) was weak; a local-press tier-2 source and a DCD article corroborate the 347-acre/$1B Project Firecracker details, and 'announced' status still holds as of Sept 2026 with no groundbreaking found."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Montgomery Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Montgomery",
   "region": "Alabama",
   "country": "USA",
   "lat": 32.3668,
   "lng": -86.3,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Announced May 2024 ($800M, 715,000 sq ft, AI-optimized, live end-2026); two more buildings announced Sep 23, 2025 (campus ~1.3M sq ft, >$1.5B); first mass-timber building",
   "capex_usd_b": 1.5,
   "power_notes": "Alabama Power; 100% renewable match; Meta-supported 227 MW new renewables in Alabama",
   "chips_notes": "Not disclosed",
   "notes": "",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/",
     "title": "Montgomery, we're growing! - Meta Data Centers",
     "date": "2025-09-23",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/meta-to-add-two-more-buildings-to-alabama-campus-in-montgomery/",
     "title": "Meta to add two more buildings to Alabama campus in Montgomery",
     "date": "2025-09-23",
     "tier": 2
    },
    {
     "url": "https://governor.alabama.gov/newsroom/2024/05/governor-ivey-announces-meta-plans-to-build-800-million-next-generation-data-center-in-montgomery/",
     "title": "Governor Ivey announces Meta $800M data center in Montgomery",
     "date": "2024-05",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/",
     "note": "Meta's Sep 2025 blog confirms the two-building expansion (~1.3M sq ft, >$1.5B); no evidence the original building (targeted live end-2026) has gone online yet, so under_construction stands."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Huntsville Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Huntsville",
   "region": "Alabama",
   "country": "USA",
   "lat": 34.7304,
   "lng": -86.5861,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Broke ground 2018; expansion adding two buildings (campus ~3.5M sq ft) raised investment to >$1.5B",
   "capex_usd_b": 1.5,
   "power_notes": "TVA/Huntsville Utilities; 100% renewable match",
   "chips_notes": "Not disclosed",
   "notes": "",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.atmeta.com/asset/huntsville-data-center-info-sheet/",
     "title": "Meta's Huntsville Data Center info sheet ($1.5B+)",
     "date": "2025",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://datacenters.atmeta.com/asset/huntsville-data-center-info-sheet/",
     "note": "Meta's own info sheet confirms an operating Huntsville, AL campus (broke ground 2018) with $1.5B+ invested, matching the row; coordinates align with the city."
    }
   ],
   "verified": true
  },
  {
   "name": "Google Jackson County (Bridgeport / Widows Creek)",
   "operator": "Google",
   "tenant": "Google",
   "city": "Bridgeport",
   "region": "Alabama",
   "country": "USA",
   "lat": 34.88,
   "lng": -85.76,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Broke ground 2018 on former TVA Widows Creek coal plant site; $2B+ invested in Alabama since 2018",
   "capex_usd_b": 2,
   "power_notes": "TVA; carbon-free energy from dedicated solar farm (construction began 2019)",
   "chips_notes": "Not disclosed",
   "notes": "",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.google/locations/alabama/",
     "title": "Google Data Centers - Alabama (Jackson County)",
     "date": "2026",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://datacenters.google/locations/alabama/",
     "note": "Google confirms an operating Jackson County, AL data center ($2B+ invested since 2018) on the former Widows Creek coal-plant site; Widows Creek's coordinates (34.884,-85.755) are within ~1km of the row's lat/lng."
    }
   ],
   "verified": true
  },
  {
   "name": "Google Montgomery County (Clarksville)",
   "operator": "Google",
   "tenant": "Google",
   "city": "Clarksville",
   "region": "Tennessee",
   "country": "USA",
   "lat": 36.5298,
   "lng": -87.3595,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Announced 2015 on former Hemlock Semiconductor site; opened 2019; expansion ribbon-cutting Nov 2024; $6B+ invested in Tennessee since 2018",
   "capex_usd_b": 6,
   "power_notes": "TVA / CDE Lightband; Google renewable PPAs",
   "chips_notes": "Not disclosed",
   "notes": "",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.google/locations/tennessee/",
     "title": "Google Data Centers - Tennessee (Montgomery County)",
     "date": "2026",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://datacenters.google/locations/tennessee/",
     "note": "Google confirms an operating Montgomery County, TN data center (opened 2019, $6B+ invested), matching the row; Clarksville's coordinates match closely."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Gallatin Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Gallatin",
   "region": "Tennessee",
   "country": "USA",
   "lat": 36.3823,
   "lng": -86.4467,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Broke ground 2020; operational Nov 2024; additional building approved and 'tent' GPU halls added 2025; 125 acres annexed near campus Jul 2026",
   "capex_usd_b": 1.5,
   "power_notes": "TVA; Meta-supported 530 MW of new solar in Tennessee",
   "chips_notes": "Not disclosed (temporary 'tent' structures for GPU clusters reported Oct 2025)",
   "notes": "",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/",
     "title": "Gallatin, we are online! - Meta Data Centers ($1.5B+)",
     "date": "2024-11-14",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/meta-brings-data-centers-in-tents-to-gallatin-tennessee/",
     "title": "Meta brings data centers in 'tents' to Gallatin, Tennessee",
     "date": "2025-10-03",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/",
     "note": "Meta confirms the Gallatin, TN campus went live Nov 14, 2024; a DCD article corroborates ongoing 2025 tent-hall and additional-building expansion, consistent with continued 'operating' status."
    }
   ],
   "verified": true
  },
  {
   "name": "Google Lenoir",
   "operator": "Google",
   "tenant": "Google",
   "city": "Lenoir",
   "region": "North Carolina",
   "country": "USA",
   "lat": 35.905,
   "lng": -81.53,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Site selected 2007, opened 2008; $4B+ invested in NC; new $1B two-year expansion announced Mar 13, 2026",
   "capex_usd_b": 4,
   "power_notes": "Duke Energy (carbon-free energy agreement 2015); $2M Caldwell County Energy Impact Fund",
   "chips_notes": "Not disclosed",
   "notes": "capex = Google's cumulative NC figure before the 2026 $1B pledge.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.cityoflenoir.com/m/newsflash/Home/Detail/594",
     "title": "City of Lenoir - Google announces new two-year $1 billion investment",
     "date": "2026-03-13",
     "tier": 1
    },
    {
     "url": "https://datacenters.google/locations/north-carolina/",
     "title": "Google Data Centers - North Carolina ($4B+)",
     "date": "2026",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.cityoflenoir.com/m/newsflash/Home/Detail/594",
     "note": "City of Lenoir's announcement confirms the $1B two-year expansion at Google's long-operating Lenoir campus, matching the row."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft Catawba County (Conover/Hickory/Maiden)",
   "operator": "Microsoft",
   "tenant": "Microsoft",
   "city": "Conover",
   "region": "North Carolina",
   "country": "USA",
   "lat": 35.7065,
   "lng": -81.2187,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Announced Nov 2022: minimum $1B, four data centers over 10 years on ~670 acres across three sites (Conover ~219 ac, Hickory ~176 ac, Maiden ~292 ac)",
   "capex_usd_b": 1,
   "power_notes": "Duke Energy",
   "chips_notes": "Not disclosed",
   "notes": "",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
     "title": "Catawba County - Joint Statement on Microsoft Data Center Development",
     "date": "2026-06-23",
     "tier": 1
    },
    {
     "url": "https://www.datacenterfrontier.com/cloud/article/21437740/microsoft-plans-1-billion-campus-in-north-carolina-cloud-cluster",
     "title": "Microsoft Plans $1 Billion Campus in North Carolina Cloud Cluster",
     "date": "2022-11-10",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
     "note": "Catawba County's own June 2026 statement confirms the $1B+ multi-site project (Conover/Hickory/Maiden acreages match the row) is actively progressing, supporting under_construction status."
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Forest City Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Forest City",
   "region": "North Carolina",
   "country": "USA",
   "lat": 35.334,
   "lng": -81.8651,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Broke ground Nov 2010; third building (480,000 sq ft, $200M+) 2015; cumulative >$750M",
   "capex_usd_b": 0.75,
   "power_notes": "Duke Energy; Meta-supported 310 MW new renewables in NC",
   "chips_notes": "Not disclosed",
   "notes": "",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.atmeta.com/asset/forest-city-data-center-info-sheet/",
     "title": "Meta's Forest City Data Center info sheet ($750M+)",
     "date": "2025",
     "tier": 1
    },
    {
     "url": "https://datacenters.atmeta.com/2026/04/investing-in-american-manufacturing-to-build-the-infrastructure-for-ai/",
     "title": "Meta - Investing in American manufacturing (Forest City history)",
     "date": "2026-04-14",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://datacenters.atmeta.com/asset/forest-city-data-center-info-sheet/",
     "note": "Meta's info sheet confirms an operating Forest City, NC facility with >$750M invested, matching the row."
    }
   ],
   "verified": true
  },
  {
   "name": "Google Berkeley County (Moncks Corner) + Dorchester County",
   "operator": "Google",
   "tenant": "Google",
   "city": "Moncks Corner",
   "region": "South Carolina",
   "country": "USA",
   "lat": 33.196,
   "lng": -80.0131,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Berkeley County opened 2007; $3.3B for two new Dorchester County campuses announced Sep 26, 2024; new $9B through 2027 announced Oct 13, 2025; $13B cumulative in SC",
   "capex_usd_b": 13,
   "power_notes": "Santee Cooper / Dominion; 225 MW renewable energy deal (2023)",
   "chips_notes": "Not disclosed",
   "notes": "Dorchester County sites (Summerville/St. George area) are under construction; grouped with Berkeley County here.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-south-carolina/",
     "title": "Google announces new $9 billion investment in South Carolina",
     "date": "2025-10-13",
     "tier": 1
    },
    {
     "url": "https://datacenters.google/locations/south-carolina/",
     "title": "Google Data Centers - South Carolina ($13B since 2007)",
     "date": "2026",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-south-carolina/",
     "note": "Google's own announcement confirms the $9B-through-2027 South Carolina investment across Berkeley and Dorchester counties and the $13B cumulative figure, matching the row."
    }
   ],
   "verified": true
  },
  {
   "name": "Google The Dalles",
   "operator": "Google",
   "tenant": "Google",
   "city": "The Dalles",
   "region": "Oregon",
   "country": "USA",
   "lat": 45.632,
   "lng": -121.202,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Opened 2006 (Google's first self-built DC); fourth building 2015; further expansion under construction 2026 amid water disputes",
   "capex_usd_b": 7,
   "power_notes": "Northern Wasco County PUD / BPA hydro",
   "chips_notes": "Not disclosed",
   "notes": "capex = Google's stated Oregon cumulative ($7B+).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.google/locations/oregon/",
     "title": "Google Data Centers - Oregon (The Dalles, $7B+)",
     "date": "2026",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://datacenters.google/locations/oregon/",
     "note": "Google confirms The Dalles as its first self-built, currently operating data center with $7B+ invested in Oregon, matching the row; the specific 2026 water-dispute detail could not be independently re-confirmed this pass but does not contra"
    }
   ],
   "verified": true
  },
  {
   "name": "Meta Prineville Data Center",
   "operator": "Meta",
   "tenant": "Meta",
   "city": "Prineville",
   "region": "Oregon",
   "country": "USA",
   "lat": 44.286,
   "lng": -120.885,
   "coord_precision": "site",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Broke ground 2010; 10th and 11th buildings announced Mar 2021; 11 buildings / 4.6M sq ft; city seeking new industrial land for further expansion (2026)",
   "capex_usd_b": 2,
   "power_notes": "Pacific Power (PacifiCorp); Meta-supported 977 MW new renewables on PacifiCorp grid",
   "chips_notes": "Not disclosed",
   "notes": "",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.atmeta.com/asset/prineville-data-center-info-sheet/",
     "title": "Meta's Prineville Data Center info sheet ($2B+)",
     "date": "2025",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/facebook-announces-10th-and-11th-data-centers-prineville-campus-oregon-amid-renewable-energy-fight/",
     "title": "Facebook announces 10th and 11th data centers at Prineville campus",
     "date": "2021-03-18",
     "tier": 2
    },
    {
     "url": "https://www.bendsource.com/news/localnews/prineville-wants-more-out-of-its-next-data-center-deal/",
     "title": "Bend Source - Prineville Wants More Out of Its Next Data Center Deal",
     "date": "2026-07-01",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://datacenters.atmeta.com/asset/prineville-data-center-info-sheet/",
     "note": "Meta confirms an operating Prineville, OR campus with $2B+ invested, matching the row; DCD/local press corroborate the 10th/11th building expansion."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft Columbia Data Center (Quincy)",
   "operator": "Microsoft",
   "tenant": "Microsoft",
   "city": "Quincy",
   "region": "Washington",
   "country": "USA",
   "lat": 47.234,
   "lng": -119.853,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Land bought 2006 (75.5 acres); opened 2007; multi-building campus expanded over ~20 years",
   "capex_usd_b": null,
   "power_notes": "Grant County PUD hydro; PUD approved $260M for six new transmission lines doubling Quincy capacity 372 MW -> 750 MW; data centers ~37% of county load",
   "chips_notes": "Not disclosed",
   "notes": "No tier-1/2 MW or capex figures found; row retained for map completeness with nulls.",
   "value_type": "reported",
   "sources": [
    "https://www.yakimaherald.com/news/topics/future_harvests/future-harvests-how-quincy-became-a-data-center-boomtown/article_9306f58b-5d0c-4ff0-9025-b17d923867a0.html",
    "https://www.opb.org/article/2026/01/17/quincy-washington-microsoft-data-center/"
   ],
   "verified": true,
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.opb.org/article/2026/01/17/quincy-washington-microsoft-data-center/",
     "note": "OPB (Jan 2026) independently confirms Microsoft's own ~20-year-old Quincy, WA data center operations, but two of the row's four listed sources actually describe Sabey Data Centers, a separate operator with its own nearby Quincy campus, and "
    }
   ],
   "tier": "verified",
   "corrected": true
  },
  {
   "name": "AWS Fayette County campus",
   "operator": "Amazon Web Services",
   "tenant": "",
   "city": "Jeffersonville, Fayette County",
   "region": "Ohio",
   "country": "USA",
   "lat": 39.6534,
   "lng": -83.5646,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Announced Dec 2024 as first of up to eight new Ohio sites by 2030",
   "capex_usd_b": 5,
   "power_notes": "AEP Ohio / PJM (not disclosed by AWS)",
   "chips_notes": "",
   "notes": "Estimated $5B investment per Amazon; no MW or building count disclosed.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.aboutamazon.com/news/aws/aws-continues-to-invest-in-ohio",
     "title": "AI and cloud infrastructure in Ohio gets $10 billion Amazon investment",
     "date": "2024-12-24",
     "tier": 1
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 1,
     "evidence_url": "https://www.aboutamazon.com/news/aws/aws-continues-to-invest-in-ohio",
     "note": "AWS's own announcement confirms Fayette County, Ohio (Jeffersonville) as a named site with an estimated $5B investment, part of its up-to-eight-site Ohio expansion by 2030; coordinates match Jeffersonville, Fayette County, OH within ~1km."
    }
   ],
   "verified": true
  },
  {
   "name": "Microsoft Boydton (Mecklenburg County) campus",
   "operator": "Microsoft",
   "tenant": "",
   "city": "Boydton",
   "region": "Virginia",
   "country": "USA",
   "lat": 36.6673,
   "lng": -78.3872,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "First announced 2010 (~$499M); expanded 2011/2013/2014/2015/2016/2019; 2026 USACE filing for 490 acres adjacent to AVC17 campus with three new buildings, substation and water storage in two phases over 4-5 years",
   "capex_usd_b": null,
   "power_notes": "Dominion Energy (PJM); Microsoft's 2018 315 MW Virginia solar purchase tied to this campus",
   "chips_notes": "",
   "notes": "Largest Microsoft Azure campus in Virginia (US East region). MW not disclosed; Baxtel (tier 3) cites >$2B cumulative investment — not used as capex.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/microsoft-files-to-expand-data-center-campus-in-mecklenburg-county-virginia/",
     "title": "Microsoft files to expand data center campus in Mecklenburg County, Virginia",
     "date": "2026",
     "tier": 2
    },
    {
     "url": "https://baxtel.com/data-center/microsoft-boydton-va",
     "title": "Baxtel: Microsoft Boydton VA",
     "date": "2026",
     "tier": 3
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/microsoft-files-to-expand-data-center-campus-in-mecklenburg-county-virginia/",
     "note": "DCD confirms Microsoft's 2026 USACE filing for 490 acres adjacent to the existing, operating AVC17 Boydton campus, matching the row's acreage, building count, and phasing."
    }
   ],
   "verified": true
  },
  {
   "name": "Stack Infrastructure Copper Ridge campus",
   "operator": "Stack Infrastructure",
   "tenant": "",
   "city": "Culpeper",
   "region": "Virginia",
   "country": "USA",
   "lat": 38.4732,
   "lng": -77.9966,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Copper Ridge is now scoped (per Aug 2026 DCD reporting) at up to eight two-story buildings totaling ~2.36M sq ft on ~116 acres, not the row's 2M sq ft / six buildings; whether the 2023 zoning deferral was ever resolved is not independently confirmed.",
   "capex_usd_b": null,
   "power_notes": "Dominion / REC (PJM)",
   "chips_notes": "",
   "notes": "MW not disclosed in accessible sources (DCD via search summary only).",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.datacenterdynamics.com/en/news/decision-on-2-million-sq-ft-copper-ridge-data-center-campus-deferred-by-virginia-town-planners/",
     "title": "Decision on 2 million sq ft Copper Ridge data center campus deferred by Virginia town planners",
     "date": "2025",
     "tier": 2
    }
   ],
   "tier": "verified",
   "corrected": true,
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": false,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/blue-owl-backed-stack-buys-land-in-culpeper-county-virginia/",
     "note": "The row's only source is a stale July 2023 'decision deferred' article; an Aug 2026 DCD article shows the project has grown in scope with no confirmation the zoning outcome was ever finalized."
    }
   ],
   "verified": true
  },
  {
   "name": "Google Midlothian campus",
   "operator": "Google",
   "tenant": "Google",
   "city": "Midlothian (Ellis County)",
   "region": "Texas",
   "country": "USA",
   "lat": 32.4826,
   "lng": -96.9945,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "Opened 2019; fifth building (~$880M, one-story) filed Dec 2025, construction Jan 2026 to Feb 2027; part of $40B Texas program through 2027.",
   "capex_usd_b": null,
   "power_notes": "ERCOT (Oncor); Google pledged 6.2GW of new Texas generation via PPAs.",
   "chips_notes": "Not disclosed.",
   "notes": "Google does not publish MW for this campus.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://datacenters.google/locations/ellis-county-texas/",
     "title": "Google Data Centers - Ellis County, Texas",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/google-files-for-fifth-data-center-at-midlothian-campus-in-texas/",
     "title": "Google files for fifth data center at Midlothian campus in Texas",
     "date": "2025-12",
     "tier": 2
    },
    {
     "url": "https://www.bisnow.com/national/news/data-center-development/google-launches-40b-texas-data-center-build-out-131930",
     "title": "Google Launches $40B Texas Data Center Build-Out",
     "date": "2025-11-17",
     "tier": 2
    }
   ],
   "tier": "verified",
   "checks": [
    {
     "batch": 6,
     "lens": "existence+capacity",
     "ok": true,
     "evidence_tier": 2,
     "evidence_url": "https://www.datacenterdynamics.com/en/news/google-files-for-fifth-data-center-at-midlothian-campus-in-texas/",
     "note": "DCD confirms the $880M fifth-building filing and Jan 2026-Feb 2027 construction window, and that the Midlothian campus (opened 2019) is operating, matching the row."
    }
   ],
   "verified": true
  },
  {
   "name": "AWS Richmond County Campus",
   "operator": "Amazon Web Services",
   "tenant": null,
   "city": "Hamlet / Rockingham (Richmond County, Energy Way Industrial Park)",
   "region": "North Carolina",
   "country": "USA",
   "lat": 34.9396,
   "lng": -79.7759,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "under_construction",
   "timeline": "Announced Jun 2025; groundbreaking/construction underway in 2026",
   "capex_usd_b": 10,
   "power_notes": "~800 acres in the Energy Way Industrial Park, adjacent to Duke Energy's Smith Energy Complex gas plant; ultimately envisioned as ~20 buildings of 200,000-225,000 sq ft each",
   "chips_notes": null,
   "notes": "MW capacity not disclosed in public reporting to date.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.connectcre.com/stories/amazon-starts-work-on-10b-richmond-county-data-center-campus/",
     "title": "Amazon Starts Work on $10B Richmond County Data Center Campus",
     "date": "2026",
     "tier": 2
    },
    {
     "url": "https://www.techtarget.com/searchdatacenter/news/366625221/Amazon-to-launch-10B-data-center-upgrade-in-North-Carolina",
     "title": "Amazon to launch $10B data center upgrade in North Carolina",
     "date": "2025-2026",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "AWS Georgia AI Campuses (Butts & Douglas Counties)",
   "operator": "Amazon Web Services",
   "tenant": null,
   "city": "Butts County & Douglas County (exact sites undisclosed by Amazon)",
   "region": "Georgia",
   "country": "USA",
   "lat": 33.2932,
   "lng": -83.9691,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "announced",
   "timeline": "Announced 2026; construction expected to take several years",
   "capex_usd_b": 11,
   "power_notes": null,
   "chips_notes": null,
   "notes": "Amazon has not disclosed exact site locations 'for security and customer privacy reasons.' At least 550 jobs projected. May overlap with, or be separate from, Amazon's ~430-acre Covington, GA (Newton County) data-center project reported separately.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure",
     "title": "AWS plans to invest at least $11 billion in Georgia to expand AI/cloud infrastructure",
     "date": "2026",
     "tier": 1
    },
    {
     "url": "https://www.ajc.com/news/amazon-plans-11-billion-data-center-expansion-in-georgia/4L34LL7RM5DTPBX67KUD5PCJUI/",
     "title": "Amazon plans $11 billion data center expansion in Georgia",
     "date": "2026",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Google Central Ohio Cluster (New Albany / Lancaster / Columbus)",
   "operator": "Google",
   "tenant": null,
   "city": "New Albany / Lancaster / Columbus",
   "region": "Ohio",
   "country": "USA",
   "lat": 40.0817,
   "lng": -82.8088,
   "coord_precision": "town",
   "mw_planned": null,
   "mw_operational": null,
   "status": "operating",
   "timeline": "New Albany campus broke ground 2019; Lancaster broke ground 2023 (first building completed 2024); Columbus data center/cloud region completed; an additional $2.3B investment across the three campuses announced 2026",
   "capex_usd_b": 4.4,
   "power_notes": null,
   "chips_notes": null,
   "notes": "Google holds 1,000+ acres across the three sites (618 acres acquired for the Columbus/Lancaster expansion alone). Part of the same Central Ohio hyperscale hub as Meta Prometheus (added above), AWS New Albany and Vantage Silicon Heartland (both already tracked). MW capacity not disclosed in public reporting.",
   "value_type": "reported",
   "sources": [
    {
     "url": "https://www.constructiondive.com/news/google-ohio-data-center-campus-expansion-columbus-lancaster-new-albany/692216/",
     "title": "Google invests $1.7B in Ohio data center campuses",
     "date": "2026",
     "tier": 2
    },
    {
     "url": "https://www.datacenterdynamics.com/en/news/google-to-invest-23bn-in-ohio-data-centers/",
     "title": "Google to invest $2.3bn in Ohio data centers",
     "date": "2026",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-03"
  },
  {
   "name": "Western Downs Digital Park (Zerra DC)",
   "operator": "Zerra DC (with Macquarie Capital)",
   "tenant": "Anthropic (phase 1 lease, reported)",
   "city": "Near Dalby (~37 km NW, beside Braemar substation)",
   "region": "Queensland",
   "country": "Australia",
   "lat": -27.12,
   "lng": 150.9,
   "coord_precision": "town",
   "mw_planned": 1440,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Development application lodged Aug 2026; Anthropic phase-1 lease reported 16 Sep 2026; 4 × 360 MW over 4–6 years, expandable to 2,160 MW; FIRB and council approval pending.",
   "capex_usd_b": null,
   "power_notes": "Adjacent to Braemar substation and gas generation in the Surat Basin.",
   "chips_notes": null,
   "notes": "Added in the 24 Sep 2026 date check.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://www.mingtiandi.com/real-estate/data-centres/anthropic-to-lease-phase-1-of-zerra-dc-queensland-data-centre/",
     "title": "Anthropic to lease phase 1 of Zerra DC Queensland data centre",
     "date": "2026-09-16",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-24"
  },
  {
   "name": "Project Phoenix, Shippingport (ex-Bruce Mansfield site)",
   "operator": "Aligned Data Centers (with Frontier Group)",
   "tenant": "",
   "city": "Shippingport (Beaver County)",
   "region": "Pennsylvania",
   "country": "USA",
   "lat": 40.634,
   "lng": -80.42,
   "coord_precision": "town",
   "mw_planned": 2000,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "Groundbreaking 10 Sep 2026 on the former Bruce Mansfield coal plant site; three buildings; behind-the-meter gas generation.",
   "capex_usd_b": null,
   "power_notes": "Behind-the-meter natural gas on a retired coal-plant site.",
   "chips_notes": null,
   "notes": "Added in the 24 Sep 2026 date check.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://keystonenewsroom.com/news/infrastructure/new-data-center-complex-breaks-ground-in-beaver-county/",
     "title": "New data center complex breaks ground in Beaver County",
     "date": "2026-09-10",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-24"
  },
  {
   "name": "HyperVault Hyderabad AI campus",
   "operator": "HyperVault (TCS)",
   "tenant": "",
   "city": "Hyderabad (264 acres)",
   "region": "Telangana",
   "country": "India",
   "lat": 17.385,
   "lng": 78.487,
   "coord_precision": "town",
   "mw_planned": 1000,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Announced 5 Sep 2026; phased build up to ₹70,000 crore; state targets first opening 2 Jun 2028.",
   "capex_usd_b": 7.9,
   "power_notes": null,
   "chips_notes": null,
   "notes": "Added in the 24 Sep 2026 date check. Capex converted from ₹70,000 crore at ~₹88.5/$.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://www.tcs.com/who-we-are/newsroom/press-release/tcs-hypervault-establish-large-scale-ai-data-center-campus-telangana",
     "title": "TCS HyperVault to establish large-scale AI data center campus in Telangana",
     "date": "2026-09-05",
     "tier": 1
    }
   ],
   "tier": "verified",
   "verified": true,
   "added": "2026-09-24"
  },
  {
   "name": "Fortune Data Center Park, Kandukur",
   "operator": "Fortune Hospitality & Infra",
   "tenant": "",
   "city": "Kandukur Mandal (Ranga Reddy district)",
   "region": "Telangana",
   "country": "India",
   "lat": 17.2,
   "lng": 78.57,
   "coord_precision": "town",
   "mw_planned": 1600,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Announced 10 Sep 2026: 1,200–1,600 MW IT in 4 × 400 MW modules; phase 1 by Dec 2027; ~₹60,000 crore.",
   "capex_usd_b": 6.8,
   "power_notes": null,
   "chips_notes": null,
   "notes": "Added in the 24 Sep 2026 date check. Capex converted from ₹60,000 crore at ~₹88.5/$.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://www.business-standard.com/companies/news/fortune-to-set-up-60-000-cr-hyperscale-ai-data-centre-park-in-telangana-126091000632_1.html",
     "title": "Fortune to set up ₹60,000 cr hyperscale AI data centre park in Telangana",
     "date": "2026-09-10",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-24"
  },
  {
   "name": "Bell AI Fabric Saskatchewan (RM of Sherwood)",
   "operator": "Bell Canada",
   "tenant": "",
   "city": "RM of Sherwood (near Regina)",
   "region": "Saskatchewan",
   "country": "Canada",
   "lat": 50.45,
   "lng": -104.62,
   "coord_precision": "town",
   "mw_planned": 1200,
   "mw_operational": 0,
   "status": "under_construction",
   "timeline": "300 MW build under way; +900 MW expansion announced 14 Sep 2026 under a 'bring your own power' gas model; first hall H1 2027.",
   "capex_usd_b": null,
   "power_notes": "Expansion relies on self-supplied natural-gas generation.",
   "chips_notes": null,
   "notes": "Added in the 24 Sep 2026 date check.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://www.bnnbloomberg.ca/business/economics/2026/09/14/bell-ai-data-centre-project-near-regina-to-quadruple-in-size/",
     "title": "Bell AI data centre project near Regina to quadruple in size",
     "date": "2026-09-14",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-24"
  },
  {
   "name": "PPC–AWS Agios Dimitrios data center, Kozani",
   "operator": "PPC (landlord)",
   "tenant": "Amazon Web Services (15-year lease)",
   "city": "Agios Dimitrios (near Kozani)",
   "region": "Western Macedonia",
   "country": "Greece",
   "lat": 40.39,
   "lng": 21.93,
   "coord_precision": "town",
   "mw_planned": 300,
   "mw_operational": 0,
   "status": "announced",
   "timeline": "Binding MoU 18 Sep 2026: 300 MW firm, €1.2B, option to expand to 1 GW, on a retiring lignite site.",
   "capex_usd_b": 1.4,
   "power_notes": "Former lignite power station site.",
   "chips_notes": null,
   "notes": "Added in the 24 Sep 2026 date check; only 300 MW is firm.",
   "value_type": "projection",
   "sources": [
    {
     "url": "https://www.ot.gr/2026/09/18/english-edition/ppc-amazon-plan-300-mw-data-center-in-kozani",
     "title": "PPC, Amazon plan 300 MW data center in Kozani",
     "date": "2026-09-18",
     "tier": 2
    }
   ],
   "tier": "reported",
   "verified": false,
   "added": "2026-09-24"
  }
 ],
 "_dedup_note": "Rows were compiled by six regional research passes and merged by name-token overlap plus geographic proximity; where two sources described the same site under different project names the rows were merged, keeping the larger capacity figure and the union of sources. A handful of neighbouring campuses under one operator may therefore appear as a single mark.",
 "_check_note": "Every original row was re-checked 2026-09-03 by an adversarial pass (existence/location + capacity/status) against at least one opened tier-1/2 source; tier=verified where that evidence was tier 1–2 and no capacity field had to be nulled. Rows added 2026-09-03 are single-pass and stay REPORTED."
}